Annual Report
Released
Released
Announcement PDF
ANNUAL REPORT
30 JUNE 2023
ABN 43 107 159 713
ASX Code: BML
CORPORATE DIRECTORY
________________________________________________________
DIRECTORS
Gary Comb (Chairman)
Simon Noon (Managing Director & CEO)
Richard Monti (Non-Executive Director)
Andrew Parker (Non-Executive Director)
COMPANY SECRETARY
Jerry Monzu
REGISTERED OFFICE
4 Clive Street
WEST PERTH WA 6005
SHARE REGISTRY
Automic Group Pty Ltd
Level 5
191 St Georges Terrace
PERTH WA 6000
BANKERS
Australian and New Zealand Banking Group Limited
Level 1
1275 Hay Street
WEST PERTH WA 6005
AUDITORS
BDO Audit (WA) Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
SECURITIES EXCHANGE LISTING
Boab Metals Limited shares are listed on the
Australian Securities Exchange (Home Branch - Perth)
ASX Code: BML
WEBSITE ADDRESS
www.boabmetals.com
TABLE OF CONTENTS
________________________________________________________
Chairman’s Report
2
Managing Director’s Report
3
Review of Operations
5
Directors’ Report
18
Auditor’s Independence Declaration
33
Consolidated Statement of Profit or Loss & Other Comprehensive Income
34
Consolidated Statement of Financial Position
35
Consolidated Statement of Changes in Equity
36
Consolidated Statement of Cash Flows
37
Notes to the Financial Statements
38
Directors’ Declaration
67
Independent Auditor’s Report
68
Shareholder Information
73
FORWARD LOOKING STATEMENTS
This Annual Report may contain forward looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties, and other factors, many of which are beyond the
Company’s control. Actual events or results may differ materially from the events or results expected or implied in any
forward-looking statement. The inclusion of such statements should not be regarded as a representation, warranty, or
prediction with respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or
are likely to be fulfilled. The Company undertakes no obligation to update any forward-looking statement to reflect events
or circumstances after the date of this document (subject to securities exchange disclosure requirements). The
information in this document does not consider the objectives, financial situation or needs of any person. Nothing
contained in this document constitutes investment, legal, tax, or other advice.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
1
CHAIRMAN’S REPORT
________________________________________________________
Dear Shareholders,
On behalf of your Board of Directors, I am pleased to present the 2023 Annual Report and recap on
the progress that Boab Metals Limited has made over the past financial year at our flagship Sorby Hills
Lead-Silver Project and toward delivering on our objective to become a profitable low-cost producer
and responsible economic contributor to the east Kimberley community.
The release of the Sorby Hills Definitive Feasibility Study was a standout achievement. The study
delivered a material increase in value over the Sorby Hills Prefeasibility Study and represents an
outstanding result given the difficult macroeconomic conditions under which it was completed. I would
like to commend Simon and the team on the outcome, however, acknowledge that the job is not yet
done as our focus is firmly toward reaching a Final Investment Decision at Sorby Hills and
subsequently, delivery of the project.
To that end, I am pleased to report that Project development has continued at pace, with Front End
Engineering & Design, project optimisation, final approvals and other pre–Final Investment Decision
deliverables all well advanced. Constructive discussions with potential Financiers and our selected
Offtakers continue to provide us with confidence that funding for the Project can be secured despite
the highly inflationary environment and very challenging market conditions we are currently faced with.
Our clear objective over the coming 12 months is to reach a fully funded Final Investment Decision at
Sorby Hills and commence our journey to becoming Australia’s next Lead-Silver producer. Our
strategy will be to move the Project forward diligently, proactively and cost-effectively, whilst
encouraging opportunities that lead to value creation such as our recent discovery at the Keep Seismic
Target.
The Board is grateful for the support of all shareholders and would like to commend all staff on their
hard work and dedication during the year. We look forward to an exciting year ahead.
Gary Comb
Chairman
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
2
MANAGING DIRECTOR’S REPORT
__________________________________________________________
Throughout the 2023 financial year, the Boab team has focused on workstreams required to bring about
a Final Investment Decision on our 75% owned Sorby Hills Lead-Silver Project located in the east
Kimberley Region of Western Australia.
A standout achievement of the year has been the delivery of the Sorby Hills Definitive Feasibility Study
(DFS) which produced a robust outcome and supports the Company's progress toward a Final Investment
Decision.
Key highlights of the study included:
•
improved 18.3Mt Production Target (a ~24% increase over the Sorby Hills Prefeasibility Study)
underpinned by 83% Reserve (including a 53% increase in Proved Reserves);
•
increased process plant throughput of 2.25Mtpa (versus 1.25Mtpa considered in the Sorby Hills
Prefeasibility Study) delivering an average of 103ktpa Lead-Silver Concentrate;
•
reduced unit C1 operating costs of US$0.39/lb payable Pb (versus US$0.47/lb payable Pb in the
Sorby Hills Prefeasibility Study);
•
upfront Capital Cost of A$245M, of which 75% was supported by live tendered pricing; and
•
strong value metrics including A$1.0B in operating cashflow, A$705M net cash flow, pre-tax NPV8
of A$370M, IRR of 35%, and an average annualised EBITDA of A$119M.
I’m extremely proud of the hard work the Boab team has put into the Sorby Hills DFS and the high-quality
product that has been delivered.
In conjunction with completing the DFS, Boab has been busy preparing for a Final Investment Decision at
Sorby Hills. Primarily, the appointment of tier-1 engineering firm GR Engineering Services as the preferred
EPC contractor, and the subsequent commencement of Front-End Engineering & Design, has seen the
firming up of detailed project designs and the exploration and incorporation of value-adding and costsaving initiatives across the Project. The increase in Project size and scope has necessitated review and
amendment of previously received environmental approvals. The Company is diligently working through
these processes, together with the standard set of statutory permits and approvals required for
construction and operations.
Engagement with Financiers continues to be constructive. Similarly, negotiations with selected Offtakers,
concerning the Sorby Hills concentrate, are well advanced with the final award being subject to exploring
opportunities for Offtakers to provide finance to support senior lenders finance.
Boab’s proud support of the local community continued throughout the period with our ongoing
sponsorship of the renowned Ord Valley Muster held in May 2023. Furthermore, the execution of a Heads
of Agreement with the Shire of Wyndham and East Kimberley for the development and long-term lease of
a new 180-person accommodation facility in Kununurra provides further evidence of the potential
synergies and significant economic opportunities between the Sorby Hills Project and the East Kimberley
community.
Looking forward, I am excited by the opportunity that the coming year brings. Our flagship Sorby Hills
Project is approaching development-ready, and I am confident we will secure the required funding to bring
the project to fruition. Additionally, the recent and very exciting exploration success at Sorby Hills and the
progress made at our Manbarrum and Eight Mile Creek Projects, offer enormous potential and further our
vision to establish a long-life mining hub in the east Kimberley Region.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
3
MANAGING DIRECTOR’S REPORT
_________________________________________________________
I would like to take this opportunity to acknowledge all of our staff and their families for their continued
hard work. I would like to also extend my appreciation to my fellow Board members for their invaluable
guidance over the 2023 financial year.
Lastly, a big thank you to our shareholders, both new and old, for your confidence in Boab Metals. We
look forward to rewarding your continued support over the coming year.
Simon Noon
Managing Director & CEO
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
4
REVIEW OF OPERATIONS
__________________________________________________________
OVERVIEW
During the Financial Year to 30 June 2023, Boab Metals Ltd (“Boab”) has continued to focus on reaching
a Final Investment Decision at its 75% owned Sorby Hills Project (“Sorby Hills” or “the Project”), located
within the Kimberley Region of Western Australia. Sorby Hills is the largest undeveloped, near-surface
Lead-Silver-Zinc deposit in Australia.
Key activities undertaken during the period included:
Completion of the Sorby Hills Definitive Feasibility Study (“DFS”)
•
An updated 47.3Mt at 3.1% Pb, 35g/t Ag and 0.4% Zn Mineral Resource Estimate by CSA Global
achieving a 78% increase in Measured Resources;
•
Six open-pit deposits delivering a 18.3Mt Production Target underpinned 83% by Ore Reserves,
including a 12% increase in overall Reserves and 53% increase in Proved Ore Reserves versus
the Pre-Feasibility Study;
•
2.25Mtpa conventional crush-grind-flotation Process Plant;
•
A$1.0Bn in operating cashflow, A$705M net cash flow, Pre-Tax NPV8 of A$370M, IRR of 35% and
an average annualised EBITDA of A$119M;
•
Pre-production Capital Cost of A$245M and C1 cash cost of US$0.39/lb payable Pb (including a
net Silver credit of US$0.38/lb payable Pb) delivering an average operating margin of 41%; and
•
High-confidence study with up-to-date tendered pricing for 75% of the Capital Costs.
Preparation for a Final Investment Decision
•
Selection of GR Engineering Services (“GRES”) as preferred EPC contractor and the
commencement for Front End Engineering & Design (“FEED”);
•
Undertaking Project optimisation workstreams to refine and improve economic outcomes;
•
Implementation of a cost-effective accommodation solution including the purchase a secondhand facility to accommodate workers throughout construction and the execution of a Head of
Agreement with the Shire of Wyndham and East Kimberely with respect to a new long term facility
built in Kununurra;
•
Progressing final approvals including securing of an EPA S45c amendment with respect to an
increased Project development area;
•
Ongoing engagement and progress with Tier-1 Offtakers and debt Financiers with respect to
securing debt finance to support upfront funding of the Project.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
5
REVIEW OF OPERATIONS
__________________________________________________________
Phase VI and Phase VII Drilling Programs
•
•
Phase VI Drilling Program successfully completed with a total of 3,020m drilled across 28 Reverse
Circulation (RC) drill holes with mud rotary collars.
o
SHRC_157 (Beta): 7m @ 19.17% PbEq, (16.23% Pb & 82g/t Ag) from 72m, including.
3m @ 41.38% PbEq, (35.26% Pb & 174g/t Ag) from 72m.
o
SHRC_149 (Norton North): 2m @ 16.64% PbEq, (10.92% Pb & 163g/t Ag) from 103m
(hole terminated in mineralisation).
Phase VII Drilling Program successfully completed with a total of 2,634m drilled across 22
diamond holes using sonic drilling technology to penetrate the unconsolidated cover rocks.
o
Identification of an exciting new zinc rich mineralisation zone approximately 1–2 km south
of the existing Sorby Hills deposits.
Figure 1: Phase VII Drilling at Sorby Hills Project
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
6
REVIEW OF OPERATIONS
__________________________________________________________
Stakeholder Engagement
•
Productive discussions held with the local indigenous group the, Miriuwung Gajerrong people, to
significantly progress the definition of a mutual Benefits Agreement.
•
Boab’s proud support of the east Kimberely region continued throughout the period with ongoing
sponsorship of the renowned Ord Valley Muster and Teach Learn Grow tutoring and mentorship
initiative (Figure 2).
Figure 2: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn Grow,
East Kimberley.
SORBY HILLS DEFINITIVE FEASIBILITY STUDY
On January 2023, Boab released a DFS on the Project (ASX Announcement 19 January 2023).
The DFS proposed the open-pit mining and processing of 18.3Mt of ore from five of the six deposits,
namely: Omega, A, B, Beta and Norton. Mined ore will be treated via a simple crush-mill-flotation circuit
at an initial rate of 1.5Mtpa expanding to 2.25Mtpa after 1 year of production. Concentrate produced at
the Project will be transported ~150km by road in sealed half-height containers to Wyndham Port from
where it will be shipped to market (Figure 3).
Over the initial 8.5-year processing period contemplated by the DFS, 18.3Mt of ore is to be mined and
processed through the Sorby Hills process plant to deliver an average 103ktpa of concentrate containing
64ktpa of payable Lead and 2Moz p.a. of payable Silver to generate a pre-tax NPV8 of A$370M and IRR
of 35% (Figure 4). The DFS economics are underpinned by 15.2Mt of Ore Reserves, and a large, welldefined 47.3Mt Mineral Resource that offers significant potential for low-risk mine life extensions.
The result demonstrated robust economics (Table 1) and supported the Company’s progress toward a
Final Investment Decision.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
7
REVIEW OF OPERATIONS
__________________________________________________________
Figure 3: Location of the Sorby Hills Project relative to Kununurra and route to Wyndham Port.
Figure 4: Highlights of the Sorby Hills Project DFS.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
8
REVIEW OF OPERATIONS
__________________________________________________________
Table 1: Key Life of Mine Metrics
Item
Physicals
Life of Mine
ROM Mined
Strip Ratio
Processed Tonnes
Lead / Silver Grade
Lead / Silver Recovery
Concentrate Produced
Avg Lead / Silver Grade
Payable Lead
Payable Sliver
Cash Flow
Gross Revenue
Selling Costs
Operating Costs
Net Operating Cash Flow
Pre-Production Capital
Sustaining Capex & Closure
Net Project Cash Flow
Value Metrics
Pre-Tax NPV8
Pre-Tax IRR
Average Annual EBITDA
Unit
Value
Years
‘000 t
Waste : Ore (t:t)
‘000 t
%, g/t
%
‘000 dmt
%, g/t
‘000 t
‘000 oz
8.5
18,263
7.5
18,263
3.4, 39
91%, 82%
872
65.5, 666.5
543
17,232
A$M
A$M
A$M
A$M
A$M
A$M
A$M
2,481
(285)
(1,191)
1,005
(245)
(55)
705
A$M
%
A$M
370
35%
119
Macroeconomic assumptions for Lead, Silver and FX were based on the forward curves extracted from
Bloomberg on 16 January 2023.
PREPARATION FOR A FINAL INVESTMENT DECISION
Front End Engineering & Design
Following the selection of GRES as the preferred EPC Contractor for the Sorby Hills Project (ASX
Announcement 21 November 2022) and the subsequent execution of an Engineering & Services
Agreement (ASX Announcement 13 March 2023), Boab and GRES focused on FEED workstreams in
preparation for EPC contract award.
The output resulted in a refined process plant design and the issue of tender packages for long-lead items.
Furthermore, the optimised site layout (Figure 5) has allowed for an amended bulk earthworks design to
be undertaken by Coffey, and subsequently, a re-estimate of materials quantities that will form the basis
of updated tenders for the Early Earth Works program.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
9
REVIEW OF OPERATIONS
__________________________________________________________
Figure 5: 3D Model of the Sorby Hills Process Plant layout looking northward from the ROM Pad toward the
processing facilities and administration buildings.
Project Optimisation
Mining Schedule and Tailings Strategy Update
The Sorby Hills DFS tailings strategy incorporated both above-ground tailings storage within an integrated
waste landform (“IWL”) and in-pit tailings deposition in the B and Omega South pits. Subsequent to the
DFS, Boab has determined that the initial footprint of the IWL is sufficient to support additional raises that
will provide capacity for approximately 6 years of above-ground tailings storage.
The changed strategy allows for the lower grades of the Omega South pit (which was to be completed
and used for tailings deposition from Year 5) to be replaced by higher grades of the Omega and Norton
pits in the mining schedule, thus bringing forward metal production and revenue.
Rationalisation of Contract Packages
The updated mining schedule and tailings strategy has provided Boab with the opportunity to explore a
rationalisation of contract packages, including the bundling of the mining contract with bulk earthworks
activities. Boab has worked closely with contractors who have previously tendered for the mining and
bulk earthworks packages to help them refine their pricing based on the updated schedule and the
bundled contract.
Power Supply Initiatives
Boab has executed a Heads of Agreement with Horizon Power to provide a power solution for the Sorby
Hills Project that is underpinned by green energy from the Ord River Hydroelectric Power Plant (ASX
Announcement 22 April 2022). Whilst the availability of power from the hydroelectric plant is expected to
be more than 90%, the DFS conservatively included 100% redundancy in the form of a 12MW dieselfuelled back-up power plant located on-site.
In consultation with GRES and Horizon Power, Boab is working towards an optimised solution whereby
by the need for diesel power redundancy is both reduced and potentially replaced by an alternate power
source such as an on-site solar farm. A positive outcome would further enhance the clean energy
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
10
REVIEW OF OPERATIONS
__________________________________________________________
credentials of the Sorby Hills Project, lower operating costs and reduced exposure to fluctuations in the
price of diesel.
Concentrate Logistics
GHD completed a road safety assessment for the Sorby Hills Project. The final report will be used in the
application for concessional loading made to Main Roads Western Australia. A successful concessional
loading application would result in improved haulage costs from the mine site to Wyndham Port.
Cost Effective Accommodation Solution
Kununurra Accommodation Facility
Boab has executed a Heads of Agreement with the Shire of Wyndham and East Kimberley (“SWEK”) for
the construction and long-term lease of a new 180 person accommodation facility within Kununurra (ASX
Announcement 19 July 2023).
Under the terms of the agreement, Boab will secure a 10-year lease of the new facility in return for funding
pre-construction work including approvals workstreams and conceptual designs. Pre-construction
workstreams funded by SMPL will be rebated against lease fees. SWEK will fund and oversee detailed
design and construction of the facility.
Construction Camp
During the period, a 178 room camp was acquired for a total purchase price of A$1.29 million, staged in
two tranches: A$259,000 deposit paid upfront, and A$1.04 million balance paid in Q4 2022 (ASX
Announcement 15 September 2022). The acquisition represented a significant saving to the Project
relative to a new camp bought outright or via a lease finance arrangement.
The camp was transported to site during Q4 2022 and will be utilised throughout the project construction
phase to house project employees and contractors.
Approvals
As part of the Sorby Hills DFS and ongoing project execution workstreams, Boab has sought two sets of
amendments to the Project original EPA Approval received in 2014. The amendments primarily relate to
changes in the “development area” and refinement of the water management strategy within the
tenements. The first of these amendments was approved in July 2022 (ASX Announcement 1 July 2022).
The second amendment process is nearing completion, with updated water balance modelling from GHD
and independent third-party engineering reports from tailings and water storage specialist Red Earth
Engineering supporting the application.
In light of the EPA amendments, and other design changes to the process plant and site layout, Boab rereferred the Project to the Department of Climate Change, Energy, the Environment and Water
(“DCCEEW”) under the Environmental Protection and Biodiversity Conservation Act (“EPBC”). Sorby Hills
was previously approved under the EPBC Act in 2013. Self-assessment by Boab utilising the ‘Protected
Matters Search Tool’ has been completed on the DCCEEW website and identified no new potential
impacts from the proposed operations, outside those that were assessed previously.
In addition to the key approvals above, the Company continued to advance other permits and approvals
related to construction and operations including EPA Part V Works Approval, Mining Proposal, Water
Extraction Licence and Mining Operational Notification.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
11
REVIEW OF OPERATIONS
__________________________________________________________
Engagement with Financiers and Offtakers
Following the conclusion of the DFS, Boab continued to progress constructive discussions with potential
financiers of the Sorby Hills Project. In parallel, the lender’s Independent Technical Expert completed its
review of the Project.
Negotiation of offtake terms with multiple Tier-1 counterparties is substantially complete. Boab is now
exploring options for offtaker financing with these groups, to work in tandem with senior secured debt.
PHASE VI AND PHASE VII DRILLING PROGRAMS
During the financial year, Boab completed a Phase VI drilling program and commenced a Phase VII drilling
program at Sorby Hills.
Phase VI Drilling Program
The Phase VI drilling program comprised a total 3,020m drilled across 28 RC holes, including some that
were pre-collared by mud rotary drilling and completed with RC drilling (Figure 6). The primary objective
of the program was to facilitate an increase in the portion of the Beta and the Norton Deposits classified
as Ore Reserves (ASX Announcement 23 January 2023).
Positive drilling results from the Phase VI program include:
•
SHRC_157 (Beta): 7m @ 19.17% PbEq, (16.23% Pb & 82g/t Ag) from 72m
o
•
Incl. 3m @ 41.38% PbEq, (35.26% Pb & 174g/t Ag) from 72m.
SHRC_136 (Beta): 20m @ 7.39% PbEq, (5.58% Pb & 52g/t Ag) from 65m
o
Incl. 8m@ 13.86% PbEq, (10.49% Pb & 96g/t Ag) from 77m.
•
SHRC_151 (Beta): 5m @ 5.13% PbEq, (3.70% Pb & 41g/t Ag) from 45m.
•
SHRC_163 (Beta): 13m @ 2.90% PbEq, (2.26% Pb & 18g/t Ag) from 49m.
•
SHRC_149 (Norton N): 2m @ 16.64% PbEq, (10.92% Pb & 163g/t Ag) from 103m (terminated in
mineralisation).
•
SHRC_147 (Norton N): 11m @ 5.74% PbEq, (3.84% Pb & 54g/t Ag) from 86m.
•
SHRC_143 (Norton N): 13m @ 4.06% PbEq, (2.82% Pb & 35g/t Ag) from 95m.
o
Incl. 5m @ 5.35% PbEq, (3.91% Pb & 41g/t Ag) from 95m.
Drilling results from the Beta Deposit further confirmed the revised mineralisation model for the deposit
and opened the prospect for further mineralisation extensions (Figure 7). Drilling results in the northeast
portion of the Norton Deposit increased the confidence level in the continuity of high-grade mineralisation
beyond the current pit designs (Figure 8). Overall, the Phase VI program delivered positive results in key
locations for future Resources and Reserves growth.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
12
REVIEW OF OPERATIONS
__________________________________________________________
Figure 6: Phase VI drill hole locations overlain on the 2021 Mineral Resource surface projections. Selected
intercepts mentioned in the highlights are shown as PbEq.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
13
REVIEW OF OPERATIONS
__________________________________________________________
Figure 7: Beta Cross Section trending NNE with incorporation of Phase VI intercepts and reinterpreted outline
of the mineral resource envelopes.
Figure 8: Norton Cross Section trending NE showing the position of Phase VI drill holes, intercepts and
reinterpreted outline of the Mineral Resource envelopes.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
14
REVIEW OF OPERATIONS
__________________________________________________________
Phase VII Drilling Program
The Phase VII drilling program was launched in June 2023 with the objective increasing the size of the
Norton deposit Reserve base via:
•
additional metallurgical testwork to potentially improve conservative metal recoveries adopted in
the Sorby Hills Definitive Feasibility Study; and
•
testing extensions to the Norton deposit mineralisation adjacent to the current open pit design,
including that identified in SHMR_149 which was stopped in high grade mineralisation (2m @
10.9%Pb) due to technical issues with the drill rig.
The program was successfully completed in August 2023 with a total of 22 holes drilled for 2,634 m (24%
more than originally planned) including an additional hole at Beta and a further exploration hole drill into
the recently identified Keep Seismic Target (Figure 9).
Figure 9: Plan view of the Sorby Hills Project showing the locations of Phase VII drill holes.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
15
REVIEW OF OPERATIONS
__________________________________________________________
Mineralisation observed in drill holes at Norton and Beta was consistent with the current geological model
and with the objectives of the program.
Significantly, new sphalerite (Zinc) and galena (Lead) massive-sulphide mineralisation was intersected in
hole SHSD_185 drilled at the Keep Seismic Target (Figures 8, 9 and 10).
The upper interval of mineralisation was intersected at the base of the impermeable Milligan’s Shales
which is part of the Middle Carboniferous sediments, from a down-hole depth of 82.5 m for about 5.5 m.
It consists of disseminated and thin bands of massive sulphide filled veins of galena (PbS), marcasite (FeS)
and sphalerite (ZnS) immediately below the shale. This stratigraphic position is the main host of the Sandy
Creek zinc deposit at Boab’s Manbarrum project located on the eastern side of the Burt Range Trough in
the Northern Territory.
The lower mineralisation interval – the principal target – was intersected from 242.5 meters over an interval
length of about 15 meters with intermittent intervals of massive colloform sulphides dominated by
sphalerite and disseminated coarse crystalline galena (Figure 11) with the lowermost massive sphalerite
bed located a 266.2 m.
While the intersected mineralisation is predominantly of a stratabound, replacement-type nature it centres
around a fault breccia at a depth of ~ 251.3 m which shows evidence of zinc and lead sulphide
mineralisation.
Boab is of the view that the initial result at the Keep Seismic Target is a major exploration success
demonstrating not only proof of concept but more importantly the potential of the Burt Range Basin to
host significantly more base metal mineralisation.
Assays for the Phase VII drilling program are expected to be received early in the December quarter of
2023.
Figure 10: Geological interpretation of SHSD_185 and seismic line WP_96-08.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
16
REVIEW OF OPERATIONS
__________________________________________________________
galena > sphalerite
sphalerite >> galena
sphalerite >> galena
Figure 11: Photograph of drill core interval 244.6 m to 248.04 m showing massive sphalerite + galena
mineralisation intervals.
Figure 12: Close up photograph of drill core interval 245.3 m to 246.1 m showing colloform massive sulphides
(low-iron sphalerite = cream coloured & galena = blue grey)
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
17
DIRECTORS’ REPORT
________________________________________________________
FINANCIAL AND OPERATING REVIEW
FINANCIAL REVIEW
The Group began the financial year with a cash reserve of $6,317,527. During the year, total
exploration expenditure incurred by the Group amounted to $4,185,218 (2022: $4,436,892). In line
with the Group’s accounting policies, all exploration expenditure incurred in the ordinary course
of operations was expensed. The result for the year was an operating loss after income tax of
$5,904,209 (2022: $6,804,523). As at 30 June 2023, available cash funds totalled $4,578,654 (2022:
$6,317,527).
OPERATING RESULTS
Summarised operating results for the year are as follows:
2023
Geographic Segments
Revenues
$
Results
$
298,865
(5,887,346)
-
(16,863)
298,865
(5,904,209)
2023
(3.58)
2022
(4.44)
Australia
Revenues and (loss) from ordinary activities before income tax
expense
Colombia
Revenues and profit from ordinary activities before income tax
expense
Revenue/(Loss before income tax)
Shareholder Returns
Basic Loss per share (cents per share)
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
During the year there were no significant changes in the state of affairs of the Group other than as
disclosed in this report.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2023
18
DIRECTORS’ REPORT
________________________________________________________
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL YEAR
Boab Metals Limited has executed a Heads of Agreement with the Shire of Wyndham and East
Kimberley (SWEK) for the construction and long term lease of a new 180-person accommodation
facility within Kununurra, 50Km from its 75% owned Sorby Hills Lead-Silver-Zinc project located
in the Kimberley Region of Western Australia.
Under the HOA, Boab will fund pre-construction work including approvals, workstreams and
conceptual design in return fo
Share your feedback
Discover