Phase VIII Drilling Program Confirms ‘KEEP’
As a Target for Further Exploration
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to provide assay results for
the Phase VIII drilling campaign at its 75% owned Sorby Hills Lead-Silver-Zinc Project (“Sorby Hills”
or “the Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
•
Continuity of mineralisation confirmed at the Keep Zinc-Lead Target.
•
Keep Zinc-Lead Target established as an exploration prospect for 2025.
•
Geological interpretation supports future exploration.
Boab Managing Director and CEO, Simon Noon, stated:
“We are pleased to confirm our initial interpretation of the 2024 drilling campaign with
confirmatory data of the results for the Keep base metal Target.
As reported 19 September, this is a significant success given the conceptual nature of the target
and its location in an area and at a depth where no mineralisation was intersected before.”
We are convinced of the exploration potential of the Project and the Burt Basin regional more
broadly and plan to follow these results up in the next field season”
Background
In early September, Boab announced the completion of the Phase VIII drilling program which
follow up on its exploration success from the 2023 campaign at the Keep Seismic Target.
The Phase VIII program comprised 4-hole deep sonic/diamond step out drilling program for a total
of 1,352m and was completed ahead of schedule and within budget.
The collar locations for all the completed drill holes are shown in Figure 1.
In summary, the results confirm several targeted outcomes of the program:
1.
At least one intercept of massive zinc mineralisation to demonstrate the validity of the
targeting rational and the continuity from the results reported from the original intercept,
2.
Confirmation of the Keep Prospect as a stratiform sphalerite target, and
3.
Demonstrated the role of structure in the distribution and deformation of mineralisation.
Figure 1: Plan view of the Sorby Hills Project showing the locations of completed drill holes for Phase VIII with
respect to previous drilling, the Mineral Resource and DFS open pit outlines.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 2
Figure 2 – Pre-drilling interpreted ENE-SSW trending seismic line WP_96-08 image showing the location of the
SHSD_185 and the conceptual structural target as well as key stratigraphic reflectors within M80/287 & 289.
Figure 3 -Post-drilling interpreted close up view cross and long section and geological interpretation of SHSD_186,
SHSD_185 and SHSD_189 and seismic line WP_96-08.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 3
Key intercepts of base metal mineralisation from the recent drilling of the “Keep Seismic Target”.
o
SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb & 5.86% Zn) and 36.7 g/t Ag from 303.0 m
o
SHSD_189: 13.0 m @ 1.23% PbEq (0.73% Pb & 0.45% Zn) and 2.76 g/t Ag from 314 m
o
SHSD_188: 7.6 m @ 1.00% PbEq (0.83% Pb & 0.14% Zn) and 7.31 g/t Ag from 66.4
SHSD_189 intersected stratabound mineralisation below the Knox Formation contact, similar to that
found in SHSD_185. The mineralisation occurs intermittently beginning from 303m until about
325.5m depth and consist of intervals of massive banded colloform sphalerite between 303 and
305m. Between 308 and 311m and between 314.5 and 325.5m several intervals of coarse-grained
disseminated matrix-replace galena is observed.
To the south (SHSD_188), the stratigraphy continues seamlessly despite a minor fault displacement.
The main lithological difference occurs below the top of Sorby Dolomite in the form of a thick, and
well-developed sedimentary breccia body (Figure 3, LHS). SHSD_186 was not assayed owing to no
mineralisation being observed.
Boab is of the view that the Keep Zinc-Lead Prospect area is now established as a compelling subsurface target with scope for future discovery (Figure 2). The opportunity is interpreted from the
findings in the rock formation development, thicknesses variation and mineralisation distribution
as intersected in the 4 drill holes completed.
In summary, the technical results so far, have justified the approach, the risk taking and the
interpretation of a location prospective for mineralisation that previously was dismissed.
Boab is of the view that the second campaign of drilling at the Keep Seismic Target is another
successful exploration step strengthening not only the concept but more importantly confirming
the potential of the Burt Range Basin to host significantly more base metal mineralisation. The next
Phase of follow up work will now be considered.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@BoabMetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% interest held by Henan
Yuguang Gold & Lead Co. Ltd.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 4
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared
by Dr Simon Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists
(Member Number: 3101). Dr Dorling has sufficient experience which is relevant to the style of
mineralization and type of deposit under consideration and to the activity which they are
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr
Dorling consents to the inclusion in the release of the matters based on their information in the
form and context in which it appears.
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Table 1 - Drill Hole Collar Locations and Assay Status
HOLE ID
mN
mE
498243
8288017
SHSD_187
498355
SHSD_188
SHSD_189
SHSD_186
RL
Depth
Dip
Azimuth
Assays
Prospect
19
282.4
-65
270
Not
Sampled
Exploration
8288117
20
318.4
-70
270
Received
Exploration
498355
8287917
20
300.4
-65
270
Received
Exploration
498486
8288017
20
450.4
-65
270
Received
Exploration
Table 2 - Intercept Table (intercepts have been calculated using a 0.5% Pb cut
off, maximum 2 m consecutive dilution and total max. 4 m internal dilution and
minimum thickness of 2 m)
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 5
HOLE ID
Depth From
Depth To
Thickness
Pb Eq_%
Ag ppm
Pb_%
Zn_%
66.4
74
7.6
0.99
7.31
0.83
0.14
77
80
3
0.83
6.21
0.81
0.02
163
167
4
1.09
19.03
0.24
0.77
220
223
3
1.01
0.57
0.01
0.9
227
230
3
0.85
1.56
0.01
0.76
303
305
2
7.73
36.73
1.23
5.86
314
327
13
1.23
2.76
0.73
0.45
Exploration Drilling
SHSD_188
SHSD_188
SHSD_189
SHSD_189
SHSD_189
SHSD_189
SHSD_189
Appendix 1 – Metal Equivalent Calculation Method
The contained metal equivalence formula is based on the Sorby Hills PFS including:
•
•
•
Lead Price US$2,253/t;
Lead recovery of 91% (weighted average of oxide and fresh Pb recoveries);
Lead Payability rate of 95%;
•
•
•
Silver Price US$27.4/oz;
Silver recovery of 82% (weighted average of oxide and fresh Ag recoveries); and
Silver Payability rate of 95%.
•
•
•
Zinc Price US$2500.0/t;
Zinc recovery of 91%, and
Zinc Payability rate of 95%.
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
MetalEq (%) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri SpriVpriGpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return rate,
V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of potentially
recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the PFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 6
JORC Code 2012 Edition - Table 1
Section 1 Sampling Techniques
(Criteria listed in the preceding section also apply to this section)
Criteria
Sampling
techniques
JORC Code Explanation
•
Nature and quality of sampling (e.g. cut channels,
random
chips,
or
specific
specialised
industry standard measurement tools appropriate
to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
•
•
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems.
Unusual commodities or
mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Commentary
•
For the sonic/diamond drilling
program (from June to August
2023), sampling was not conducted
in the field. After geological logging
the cutting/sampling intervals were
determined and marked. The drill
core destined for sampling has been
shipped to ALS laboratories in Perth
for cutting and sampling. The
sampling process will be supervised
by Boab geologists.
•
The
Sonic
pre-collars
were
geologically logged but not samples.
The diamond core intervals were
geologically logged by a geologist
and
assessed
for
visible
mineralisation. Where necessary
samples was also scanned with a
portable XRF (Olympus InnovX
Delta) for an indication of qualitative
lead concentration. About 45% of all
samples have been submitted to the
laboratory.
•
The sampling methodology to be
undertaken at ALS laboratories is
considered
representative
and
appropriate for the carbonate
hosted style of mineralisation at
Sorby Hills and is consistent with
sampling protocols in the past
conducted by Boab.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
•
The drilling method used in the
Phase VII 2023 drill program is sonic
pre collars until bedrock was
reached followed by diamond
drilling (DD).
Drill sample
recovery
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
•
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
The sample (core) recovery is
between 98 and 100% for most of
the core drilling including the
mineralised intervals. The were very
few occasions where broken
ground conditions were
encountered where the core loss
due to core grinding was
encountered.
•
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 7
Criteria
Logging
Sub-sampling
techniques and
sample
preparation
JORC Code Explanation
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
•
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
•
If core, whether cut or sawn and whether quarter,
half or all core taken.
•
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
•
•
Quality of assay
data and
laboratory tests
•
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
•
•
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Commentary
•
The DD core was logged at the rig
at the temporary work site at
Sorby
Hills.
The
core
geotechnically,
geologically,
structurally and mineralogically
logged
on
site
and
photographed.
•
¼ core samples will be analysed
first for metallurgical drill holes
and ½ core for the remaining drill
holes.
•
All samples will be sent to ALS
Laboratories
in
Perth
for
preparation
and
analysis.
Duplicates, blanks and standards
inserted at regular intervals.
•
All samples will be assayed to
accepted industry standards at
the ALS Laboratories in Perth.
Multi-acid digestion of pulverised
sample was followed by ICP-OES
or equivalent assay technique.
•
Certified Ore Grade Base Metal
Reference Material provided by
Geostats Pty Ltd. The standards
selected covered a range of lead
and silver concentrations and
there
is
good
agreement
between the Pb and Ag assays,
and the mean values provided
with the reference standards. For
the standards the assayed values
were within half of one standard
deviation and more commonly
below the mean suggesting that
grade overestimation is not a
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 8
Criteria
JORC Code Explanation
Commentary
significant
dataset.
Verification of
sampling and
assaying
•
•
•
Location
data points
of
Data spacing
and
distribution
Geological logs were digitally
entered
into
data
entry
templates in MS Excel and
entered into an Access database.
•
Assay certificates were received
from the analytical laboratories
and imported into the drill
database.
•
No adjustments were made to
the assay data.
•
Accurately surveyed using a
DGPS by a registered surveyor
and recorded in GDA94 Zone 52
will be conducted at the end of
the program.
•
All drill holes are surveyed down
hole on completion of the drill
hole with a Reflex Gyro tool every
30 m.
•
The initial siting of the drill hole
position is based on planned
coordinates from the 3D data
base and GPS positioning in the
field
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
•
The spacing between new and
existing drill holes can range from
a minimum of 50 m to 25 m
spaced collars.
•
Most drill holes at the Norton
Deposit are inclined at -70
degrees to the west holes.
•
One hole drilled at Beta at -70
deg to the northwest (315deg),
and at the Keep Seismic Target 70 to the west to better sample
both shallow and steeply dipping
mineralised
structures
considered significant to the
mineralisation.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
•
It is not considered that there is a
significant sampling bias due to
structure.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
Orientation of
data in relation
to
geological
structure
•
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
•
•
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
the
Duplicates and Blanks were also
included
in
all
sample
despatches.
Discuss any adjustment to assay data.
•
in
•
•
•
problem
Page 9
Criteria
•
Sample
security
Audits
reviews
or
JORC Code Explanation
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Commentary
•
The measures taken to ensure sample security.
•
Cores trays are stored and
processed at a secure facility at
site. All samples taken by Boab
personnel to the truck depot in
Kununurra and placed on pallets
for transport direct to ALS
Laboratory in Perth.
•
The results of any audits or reviews of sampling
techniques and data.
•
To be undertaken.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 10
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land
tenure
status
JORC Code Explanation
•
•
Exploration
done by other
parties
•
Type, reference
name/number, location
and ownership including
agreements or material
issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title
interests, historical sites,
wilderness or national
park and environmental
settings.
The security of the tenure
held at the time of
reporting along with any
known impediments to
obtaining a licence to
operate in the area.
Acknowledgment and
appraisal of exploration by
other parties.
Commentary
•
Boab Minerals Ltd acquired a 75% interest in the Sorby
Hills lead-silver project in Western Australia on 5 October
2018. Yuguang (Australia) Pty Ltd and wholly owned
subsidiary of Henan Yuguang Gold & Lead Co. Ltd (HYG)
owning the remaining 25%. The Sorby Hills Project
comprises five mining leases (M80/196-197 and M80/285287) (see Table 2 below), all of which are currently held
jointly between Sorby Hills Pty Ltd (75%) and Yuguang
(Australia) Pty Ltd (25%).
•
In addition, Boab has 100% ownership over the Eight Mile
Project which is immediately south of the Sorby Project
area.
Table 2: Sorby Hills Tenement Summary
Tenement
Area (km2)
Boab
Ownership
%
M80/196
9.99
75%
22/01/1988
21/01/2030
M80/197
9.95
75%
22/01/1988
21/01/2030
M80/285
5.57
75%
29/03/1989
28/03/2031
M80/286
7.89
75%
29/03/1989
28/03/2031
M80/287
8.15
75%
29/03/1989
28/03/2031
E80/5317
217
100%
05/03/2020
04/03/2025
Granted
Expiry
•
The Mining Leases are centred at coordinates 128°57’E,
15°27’N.
•
The project area is approximately 50 km north-northeast of
the township of Kununurra and covers a total area of
12,612.40 hectares (ha).
•
The Mining Leases were granted prior to the High Court
acknowledging Native Title and therefore native title has
been extinguished over the MLs.
•
The project area lies adjacent to proposed Goomig Range
Conservation Park.
•
Tenure is in good standing until 2030 (in some cases, out
to 2031. M80/286 & M80/197 have a current cultural
clearance access agreement in place; for the remaining
mining tenements normal cultural clearance plans would
be required. No mining agreement has been negotiated.
•
The Sorby Hills area has been systematically explored by
numerous companies since 1971. Prominent amongst
these were ELF Aquitaine (1973-1981) with various JV
partners (SEREM, St Joe Bonaparte & BHP), BHP (19811988), in JV with Triako; and CBH/Kimberley Metals/KBL
Mining.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 11
Criteria
Geology
JORC Code Explanation
•
Deposit type, geological
setting and style of
mineralisation.
Commentary
•
Previous work included, geologic mapping, soil
geochemistry, airborne and ground geophysics and
extensive drilling campaigns.
•
The Sorby Hills mineralisation is regarded as having many
features typical of Mississippi Valley Type (MVT) deposits.
Recent geological assessment has refined this to a
carbonate-replacement system, with the bulk of the
mineralisation focused on the contact between the Lower
Knox Sediments and the Upper Sorby Dolomite. However,
at the Beta deposit the mineralisation is hosted in the
hanging wall of the Knox Formation and within the Lower
part of the Upper Formation, specifically withing graphitic
fossiliferous carbonate rocks.
•
The Sorby Hills mineralisation consists of 7 discrete and
partly amalgamated carbonate-hosted Ag Pb Zn deposits
(previously referred to as pods): A–J, Beta East, Beta West
and Alpha. The deposits form a curvi-linear north-south
belt extending over 7 km, sub parallel to the eastern
margin of the Precambrian Pincombe Inlier and within the
Carboniferous Burt Range Formation of the Bonaparte
Basin.
•
The bulk of the mineralisation is stratabound and hosted
mainly on the contact between Knox Sediments and Sorby
Dolomite and in dolomitic breccia which is typically
developed at the contact of a crystalline dolomite unit and
overlying dolomitic siltstone which generally dips
shallowly to the east.
•
However, during the course of this work program at least
one drill hole drilled deeper into the footwall also indicated
a zone of intense hydrothermal breccia type of
mineralization. While this style of mineralisation is
sporadically referenced in the past its geometry is yet to be
defined; its location in the hanging wall of a structure may
suggest a genetic correlation which can serve as a guide to
future targeting.
•
The stratabound deposits average 7–10 m in thickness, are
from 2 km long and 100 to 500 m wide. There is some
structural control to the mineralisation, with higher grade
zones associated with faulting. Mineralisation is often
thicker and/or of higher grade in areas of strong
brecciation.
•
The Sorby Hills primary mineralisation is typically silver and
lead-rich with moderate to high pyrite (FeS2) content and
generally low amounts of sphalerite (ZnS). Galena (PbS)
occurs as massive to semi-massive crystalline lenses often
found in the more argillaceous units, and as coarse to fine
disseminations or as open-space fill in fractures, breccias
and vughs. Sphalerite typically predates galena and occurs
as colloform open-space fill. It is typically more abundant
at the lateral fringes of and below the lead mineralisation.
Silver values tend to increase as the lead content increases
and is generally assumed to be closely associated with the
galena.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 12
Criteria
Drill hole
Information
JORC Code Explanation
•
•
Data
aggregation
methods
•
•
Commentary
•
The upper portions of the deposits are often oxidised and
composed of a variable mix of cerussite (PbCO3) and
galena. Cerussite has also been observed deeper in the
deposits where faults, fractures and or cavities have acted
as conduits for meteoric waters. The extent to which
secondary lead minerals exist through the deposit has not
been systematically documented; however, it is possible
that other lead-oxide minerals may be present.
A
summary
of
all
information material to the
understanding
of
the
exploration
results
including a tabulation of
the following information
for all Material drill holes:
o easting
and
northing of the
drill hole collar
o elevation or RL
(Reduced Level –
elevation
above
sea level in metres)
of the drill hole
collar
o dip and azimuth of
the hole
o down hole length
and interception
depth
o hole length.
If the exclusion of this
information is justified on
the
basis
that
the
information is not Material
and this exclusion does not
detract
from
the
understanding
of
the
report, the Competent
Person
should
clearly
explain why this is the case.
•
A report will be prepared by the registered surveyor as to
the accuracy of the DGPS surveying undertaken at the drill
collars once the survey is completed.
•
The drill hole database for the Sorby Hills project area for A,
B, Omega, Norton, Alpha and Beta deposits since its
discovery in 1971 comprises about 1,409 surface drill holes
for a total of about 133,673 m of drilling.
In reporting Exploration
Results,
weighting
averaging
techniques,
maximum
and/or
minimum
grade
truncations (e.g. cutting of
high grades) and cut-off
grades are usually Material
and should be stated.
•
No aggregated exploration data is reported here.
•
Not applicable
aggregated.
as
no
exploration
data
has
Where
aggregate
intercepts
incorporate
short lengths of high-
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 13
been
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
JORC Code Explanation
grade results and longer
lengths
of
low-grade
results, the procedure
used for such aggregation
should be stated and some
typical examples of such
aggregations should be
shown in detail.
•
The assumptions used for
any reporting of metal
equivalent values should
be clearly stated.
•
•
These relationships are
particularly important in
the
reporting
of
Exploration Results.
If the geometry of the
mineralisation
with
respect to the drill hole
angle is known, its nature
should be reported.
Commentary
•
The stratabound mineralisation at Sorby Hills generally
dips gently to the east.
•
The reported mineralised intervals are down holes length;
the actual geometry of the hydraulic breccia type
mineralisation is no know and there the down hole length
is reported at face value; once further drilling is completed
the actual geometry can be defined.
•
If it is not known and only
the down hole lengths are
reported, there should be a
clear statement to this
effect (e.g. ‘down hole
length, true width not
known’).
Diagrams
•
Appropriate maps and
sections (with scales) and
tabulations of intercepts
should be included for any
significant discovery being
reported These should
include, but not be limited
to a plan view of drill hole
collar
locations
and
appropriate
sectional
views.
•
Maps and cross-sectional and long sectional diagrams
reflect the current level of survey accuracy and
coordinates.
Bal
Share your feedback
Discover