2025 AGM Presentation
Released
Released
Announcement PDF
boabmetals.com
Delivering metals for a sustainable future
2025 Annual General Meeting Presentation
25 November 2025
ASX: BML
A near-term producer in Australia with a margin
highly leveraged to the Silver Price
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning,
among other things, future operating and exploration results or the Company’s future
performance. These forward-looking statements speak, and the presentation generally
speaks, only at the date hereof. The projections, estimates and beliefs contained in such
forward-looking statements necessarily involve known and unknown risks and
uncertainties, and are necessarily based on assumptions, which may cause the
Company’s actual performance and results in future periods to differ materially from
any express or implied estimates or projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly
available sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise
a prospectus, product disclosure statement or other offering document under
Australian law. The presentation does not constitute or form part of any invitation, offer
for sale or subscription or any solicitation for any offer to buy or subscribe for any shares
in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the
time of preparation. No representation or warranty, express or implied is made as to the
fairness, accuracy or completeness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Boab Metals
Limited, its related bodies corporate and the officers, directors, employees, advisers and
agents of those entities do not accept any responsibility or liability for any loss arising
from the use of the presentation or its contents or otherwise arising in connection with
it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and
guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources
and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been
extracted from the Mineral Resource Estimate dated 17 December 2021, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Mineral
Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets
and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility
Study and FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning
the estimates, production targets and financial forecasts continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
Ore Reserves Statement.
Disclaimer
2
Boab Metals Limited ASX:BML 3
✓ Executed Agreement to acquire 100% Sorby Hills upon Final
Investment Decision1.
✓ Executed Binding Offtake and US$30 Million Prepayment Facility
with Trafigura2.
✓ EPA Part IV and EBPC approvals recieved3,4.
✓ Executed Agreement to Purchase the DeGrussa Processing Plant
from Sandfire Resources5.
✓ Over A$50M Equity Capital Raised for Early Works and Capital
Expenditure Sorby Hills6,7.
✓ Commencement of On-Site Early Works8.
2025 Year in Review
Progress toward a Final Investment Decision at Sorby Hills
170% - Boab Share Price1
22% - Median ASX Materials2
2% - Lead Price1
67% - Silver Price1
112% - Project Economics
1. Bloomberg: Bloomberg: 25 November 2024 – 24 November 2025
2. www.marketindex.com.au 24 November 2025
Based on Spot macroeconomic (See Slide 5) versus
FEED Study assumptions (ASX Release 6 June 2024)
Past 12 Months
3
1. ASX Release 23 September 2024
2. ASX Release 10 December 2024
3. ASX Release 23 December 2024
4. ASX Release 3 September 2025
5. ASX Release 30 April 2025
6. ASX Release 16 June 2025
7. ASX Release 14 October 2025
8. ASX Release 27 October 2025
NEXT STEPS:
• Secure Project Financing for Sorby Hills.
• Complete and award tender for DeGrussa Processing Plant
Relocation and Rebuild.
• Final Investment Decision at Sorby Hills.
• First concentrate production second half of 2027.
Boab Metals Limited ASX: BML
• ASX-listed base and
precious metals developer
and explorer.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Board & Management
team with a proven track
record in development.
• Top 20 shareholders hold
37% of issued capital.
# Holder Name 24 Nov 2025
1 BNP Paribas Nominees Pty Ltd 5.53%
2 Citicorp Nominees Pty Limited 5.47%
3 Villiers Queensland PL 5.22%
4 Zero Nominees Pty Ltd 3.29%
5 Sandfire Resources Ltd 2.86%
Capital Structure (24 November 2025)
Top 5 Shareholders
Share Price History
1. Tranche 2 Subject to shareholder approval at AGM late November. See Capital Raising ASX Release 14 October 2025
2. In addition to the $11.5m existing cash reserves the company has a $4.1m At the market (ATM) Facility available for use at the company’s absolute discretion (at 21 Oct 2025).
3. 7,600,000 Performance rights
4
Boab Metals Limited ASX: BML
Boab Metals
Corporate Snapshot
Metric Current Proforma1
Shares on Issue 292m 404m
Share Price 0.365 0.365
Market Capitalisation A$107m A$147m
Cash Position A$11.1m A$54.0m
Debt Nil Nil
Enterprise Value A$96m A$93m
0
0.1
0.2
0.3
0.4
0.5
0.6
0.0
2.0
4.0
6.0
8.0
10.0
12.0
25-Nov-24 25-Feb-25 25-May-25 25-Aug-25 25-Nov-25
Share
Price
(A$/sh)
Volume
(M
Shares)
Volume Share Price
Sorby Hills Project
FEED Study completed June 2024
Boab Metals Limited ASX: BML
5
NPV8 A$411M
IRR 37%
Strong pre-tax
economics
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
Average Annualised Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
A$126M p.a. Average EBITDA
2.25Mtpa
Initial 8.5 Year
Mine Life
A$1.1B Operating Cash Flow
2024 FEED Study Highlights
Spot Macroeconomics
As at 24 October 2025
• Lead: A$3,054/t
• Silver: A$77.3/oz
• FX: 0.65 AUD:USD
• Spot Lead TC: minus US$65/t1
NPV8 = A$873M
IRR = 60%
1. Average of Spot TCs published by CRU and WoodMac for May 2025
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
Boab Metals Limited ASX:BML 6
Boab Metals Limited ASX: BML
Board and
Project
Delivery Team
Engineer with over 30 years’
experience in the Australian
mining industry, with a strong
track record in successfully
commissioning and operating
base metal mines.
Gary Comb
Chairman
Board and Management
with a proven track record
in project development
Experienced mining executive
with a strong background in
management, capital raising
and operating JV’s with mid to
top tier miners in a variety of
commodities.
Simon Noon
Managing Director & CEO
Lawyer with significant
experience in the exploration
and mining industry. Wealth of
expertise in corporate advisory,
strategic consultancy and
raising capital.
Andrew Parker
Non-Exec. Director
Boab Metals Limited ASX: BML
6
Geologist with over 30 years’
experience in technical,
commercial, marketing and
finance within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Seasoned mining executive with over 28 years’ experience in the
development and operation of large-scale mining projects
across Australia and internationally. He has held senior executive
and project leadership roles with leading resources companies
including BHP, Peabody, Mineral Resources, Downer Mining,
and Thiess, as well as board positions with ASX-listed companies.
Russell Taylor
Project Director
Acquisition of the DeGrussa Processing Plant from Sandfire Resources
significantly reduces and derisks project execution timeline
Sorby Hills Project
A head start on project delivery
Boab Metals Limited ASX:BML 8
Sorby Hills Project
Commencement of Early Works
Boab Metals Limited ASX: BML
8
The Early Works Program
encompasses a range of critical
preparatory activities essential to
enable future operations.
These include:
• Construction of site access roads;
• Establishment of foundations for
the processing plant;
• Development of non-processing
infrastructure; and
• Construction of the onsite
accommodation camp.
Existing Accommodation blocks to be
relocated and refurbished
Processing Plant Pad clearing
Figure: View of the Sorby Hills Project Area looking southwest
9
Sorby Hills Project
Poised to be a Major Silver Producer
9
Boab Metals Limited ASX: BML
546kt Payable Lead
A$1.7B Revenue
17.2Moz Payable Silver
A$1.3B Revenue
Sorby Hills Revenue Split
A$3,054/t Pb and A$77.3/oz Ag
56%
44%
Company Asset
Silver Production
(koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2,414
Boab Metals Sorby Hills 2,191
Avg annualised production
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
*Source FY24 and FY25 Annual Reports
List is not exhaustive
Forecast Sorby Hills silver production versus established
silver producers within Australia
Boab Metals Limited ASX:BML 10
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Thank You
10
Sorby Hills Project
High Quality Resource
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag PbEq1 Pb Zn Ag
% % g/t % kt kt koz
A 0.6 5.3% 0.1% 23 6.1% 31 6 427
B 2.7 3.6% 0.3% 20 4.3% 97 8 1,720
Omega 17.2 3.3% 0.4% 34 4.5% 566 71 18,948
Norton 21.1 2.8% 0.4% 34 4.0% 590 96 24,090
Alpha 1.5 3.1% 0.9% 64 5.3% 45 13 2,975
Beta 4.2 3.6% 0.4% 43 5.1% 151 17 5,856
Measured 12.6 3.5% 0.4% 43 5.0% 444 45 17,521
Indicated 11.0 3.4% 0.4% 34 4.6% 377 46 12,114
Inferred 23.6 2.7% 0.5% 31 3.8% 645 117 23,406
Total 47.3 3.1% 0.4% 35 4.3% 1,465 207 53,042 Figure: Location of the Sorby Hills Resources
See ASX announcement 17 December 2021 1. See Appendix for Lead & Silver Equivalent calculation method
47.3Mt @ 123g/t Silver Equivalent
11
Boab Metals Limited ASX: BML
Sorby Hills Project (Stage 1)
Low Risk Open Pit Ore Reserve
See ASX announcement 19 January 2023
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A 4.1 3.7 0.5 3.7 16.4 4.3% 8.1
Pit B 14.8 12.6 2.3 3.2 17.4 3.8% 5.5
Omega South 21.1 18.3 2.8 2.9 29.5 3.9% 6.5
Omega Main 57.7 50.3 7.4 3.6 38.7 5.0% 6.8
Norton 21.4 19.5 1.9 4.0 78.5 6.8% 10.0
Beta 35.6 32.2 3.4 3.3 41.5 4.8% 9.5
Total Production 154.8 136.5 18.3 3.4 38.8 4.8% 7.5
Ore Reserve
Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz)
Proved 10.4 3.5% 42 358 14.1
Probable 4.9 3.5% 32 172 5.0
Total Ore Reserve 15.2 3.5% 39 531 19.1
FEED Study Production Target
Ore Reserve Statement
1. See Appendix for Lead Equivalent calculation method
Figure: DFS pit shells with respect to the Resource block model
Production Target
underpinned 83% by
Measured and Indicated
Resources.
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
57%
26%
17%
Measured Indicated Inferred
Boab Metals Limited ASX: BML
12
Production Target and Ore Reserve Growth Opportunities
✓ Large shallow deposit allowing for efficient and effective Resource definition
✓ Near-pit Resource extensions and defined strategic exploration targets
✓ Structural change in Silver pricing allowing for larger open pit designs
Boab Metals Limited ASX:BML 13
PHYSICALS SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
ROM Mined Mt 18.3 - 0.4 2.1 2.3 2.4 2.5 2.3 2.0 1.1 3.0 0.3 -
Waste Mined Mt 134.6 - 3.8 11.7 14.3 25.7 25.4 21.0 17.3 13.0 4.2 0.2 -
% Measured % 56.7% - 67.3% 91.7% 64.7% 72.0% 89.7% 71.8% 47.7% 16.6% - - -
% Indicated % 26.5% - 32.7% 8.3% 35.3% 27.2% 8.9% 26.7% 49.7% 30.6% 31.1% - -
% Inferred % 16.8% - - - - 0.9% 1.4% 1.5% 2.7% 52.8% 68.9% 100.0% -
Lead Grade % 3.4% - 3.8% 4.1% 3.2% 3.8% 3.3% 3.1% 3.1% 3.6% 3.4% 2.9% -
Silver Grade g/t 39 - 24 39 28 60 50 22 27 42 41 50 -
Processed Tonnes Mt 18.3 - - 1.39 2.25 2.26 2.25 2.25 2.25 2.26 2.25 1.11 -
Lead Grade % 3.4% - - 5.5% 3.4% 4.0% 3.5% 3.1% 3.0% 2.5% 3.5% 3.0% -
Silver Grade g/t 39 - - 47 30 59 54 24 27 30 41 41 -
Lead Recovery % 91.6% - - 90.9% 94.1% 90.0% 88.0% 92.7% 94.7% 93.8% 90.3% 90.3% -
Silver Recovery % 81.7% - - 87.2% 86.2% 82.2% 81.4% 86.9% 86.9% 85.7% 70.4% 70.3% -
Concentrate Produced kt 873 - - 109 110 126 112 99 98 80 97 42 -
Lead Grade % 65.8% - - 64.2% 65.6% 63.5% 62.4% 65.9% 66.0% 65.7% 72.2% 72.3% -
Silver Grade g/t 664 - - 529 532 860 878 479 535 730 677 770 -
Payable Lead kt 546 - - 61 69 79 65 63 63 50 68 30 -
Payable Silver Moz 17.2 - - 1.5 1.7 3.2 3.0 1.4 1.5 1.8 2.0 1.0 -
Sorby Hills Feed Study
Life of Mine Physicals
Boab Metals Limited ASX: BML
13
Boab Metals Limited ASX:BML 14
FINANCIAL SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Lead Revenue A$M 1,803 - - 198 225 260 215 207 208 165 226 98 1,803
Silver Revenue A$M 693 - - 59 69 131 121 57 62 71 82 40 693
Total Revenue A$M 2,496 - - 257 295 392 337 264 269 236 308 138 -
TR/RCs A$M (191) - - (21) (23) (30) (26) (21) (21) (18) (22) (10) -
Royalties A$M (95) - - (10) (11) (14) (12) (10) (10) (9) (12) (5) -
Net Revenue A$M 2,209 - - 227 260 347 299 233 238 210 274 123 -
Logistics A$M (117) - - (14) (15) (17) (15) (13) (13) (11) (13) (6) -
Mining A$M (547) - - (51) (62) (94) (93) (81) (71) (54) (36) (4) -
Processing A$M (388) - - (38) (47) (47) (47) (47) (47) (47) (47) (24) -
G & A A$M (88) - - (10) (10) (10) (10) (10) (10) (10) (10) (5) -
Operating Cash Flow A$M 1,069 - - 114 126 180 134 81 96 88 167 84 -
Pre-production Capex A$M (264) (131) (133) - - - - - - - - - -
Sustaining Capex A$M (26) - - (12) (1) (3) (1) (0) - - - (5) (4)
Project Cash Flows A$M 778 (131) (133) 101 125 177 133 81 96 88 167 78 (4)
NPV8 A$M 411
IRR % 37
Average EBITDA A$M 126
Sorby Hills Feed Study
Life of Mine Cashflows
Boab Metals Limited ASX: BML
14
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
Boab Metals Limited ASX:BML 15
Sorby Hills FEED Study
Capital Cost Breakdown
Item
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract 134.9 - 134.9
Site Est / Bulk Earthworks 31.9 4.9 36.9
Water Management 8.1 11.7 19.8
Accommodation Village 11.5 - 11.5
Other Infrastructure 8.5 0.6 9.1
Owners Costs 32.0 - 32.0
Contingency 22.7 - 22.7
Pre-Production Opex 15.0 - 15.0
Closure Costs - 9.3 9.3
Total Capital Costs 264.5 26.5 290.9
Total upfront capital cost of A$264M
including A$22.7M contingency.
~66% of capital costs underpinned by
tendered pricing, including an updated
Process Plant EPC pricing following the
completion of Front-End Engineering &
Design by GRES.
A$32M Owner Costs including
operational readiness items such as
critical spares and owner’s team.
Opportunities being explored to further
reduce upfront capital costs and project
implementation risk.
Boab Metals Limited ASX: BML
15
Boab Metals Limited ASX:BML 16
Sorby Hills FEED Study
Operating Cost Breakdown
Unit Operating Costs based on 18.3Mt of Ore, 546kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Item
Total
(A$M)
Unit Costs
A$/t ore US$/lb payable Pb
Logistics 117 6.4 0.07
Mining 547 30.0 0.31
Processing 388 21.3 0.22
G & A 88 4.8 0.05
Lead Treatment 160 8.8 0.09
C1 Costs (ex-Credits) 1,300 71.2 0.74
Net Silver Credits (661) (36.2) (0.37)
C1 Costs 639 35.0 0.36
Royalties 95 5.2 0.05
Sustaining Capital 26 1.4 0.01
AISC 760 41.6 0.43
Competitive C1 cash cost of US$0.36/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Boab Metals Limited ASX: BML
16
Share your feedback