Progress Update on Sorby Hills Drilling Program
Released
Released
Announcement PDF
12 July 2023
Progress Update on Phase VII Drilling Program
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to announce a successful
start and an above target progress rate for its Phase VII drilling program at its 75% owned Sorby
Hills Lead-Silver-Zinc Project (“Sorby Hills” or “the Project”), located in the Kimberley Region of
Western Australia.
HIGHLIGHTS
•
60% of the Phase VII drill program completed:
o
Exploration drill holes targeting extension to mineralisation adjacent to the
proposed Norton open pit show encouraging visual results.
o
Metallurgical drill holes within the proposed Norton open pit confirm the
reliability of current geological and mineralisation models.
• Drilling progress ahead of schedule and below budget.
•
Based on current projections, the program budget will permit additional exploration
drill holes, including the Keep Seismic Target located 1km south of the A deposit and
within the current Sorby Hills mining leases.
•
The Phase VII drilling program is expected to be completed by the end of July with assay
results targeted for late Q3 2023.
Boab Managing Director and CEO, Simon Noon, stated:
“We are pleased with the progress rate we are achieving and the positive impact the sonic drilling
has on penetrating the unconsolidated material near the surface.
Early indication of mineralisation intercepts in exploration and metallurgical drill holes at Norton
are encouraging.
Assuming the excellent productivity we’ve seen from the program so far continues, the Company
will complete additional drill holes within its original budget. These additional holes will include
the seismic target identified in 2022, as well as extended step out drilling.
In conjunction with our 2023 drill program, Boab continues to advance toward a final investment
decision on the Sorby Hills Project with preferred EPC contractor GRES firming up Front End
Engineering & Design work and discussions with financiers progressing well.”
Background
The current Phase VII drilling program to be completed during the 2023 field season comprises 19
diamond drill holes for about 2,000m with the objective of targeting opportunities to increase the
Sorby Hills Reserve base via additional metallurgical testwork, extensional and in-fill drilling.
Collar locations for the planned drill holes are shown in Figure 1.
Figure 1: Plan view of the Sorby Hills Project showing the locations of completed and remaining drill holes for
Phase VII drill hole collars with respect to previous drilling, the Mineral Resource and DFS open pit outlines.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 2
Program Progress
The current Phase VII work program has so far progressed according to plan. To date, 10 drill holes
have been completed for about 60% of the planned meters.
The utilisation of sonic drilling method to penetrate the unconsolidated cover rocks has had a
favourable impact on productivity. If this continues, Boab will complete additional exploration drill
holes within the original budget.
Drilling at Norton
Metallurgical drilling
Out of 10 holes completed, 5 holes were drilled for metallurgical purposes. A further 6 metallurgical
holes are planned.
Drill core logging confirms the intersection of mineralisation at Norton at a depth and over a width
as indicated by the current Resource model.
Metallurgical drilling at Norton will aim to determine whether there is a spatial constraint on the
poorer performing material and provide additional core upon which further metallurgical testwork
can be undertaken. A positive result could lead to a material increase in the overall metal recovered
from the Norton deposit.
Extensional drilling
Out of 10 holes completed, 5 holes were completed with the objective of extending the Norton open
design and consequently, the quantity of Resource tonnes converted to Ore Reserves.
This includes the follow up of SHMR_149 which was stopped in high-grade mineralisation (2m @
10.9% Pb) in 2023 due to technical issues with the drill rig. The follow up test hole in Phase VII
intersected mineralisation at the target depth approximately 12 m to the north. Other exploration
drill holes have intersected strong mineralised intercepts on the periphery of the ore body.
Three extensional drill holes remain to be drilled from the original Phase VII plan, however, it is likely
that additional extensional drilling will be added to the program.
Drilling the Keep Seismic Target
As announced in July 2022, the interpretation of historic seismic data across the Burt Range SubBasin has resulted in a conceptual drill target – the Keep Seismic Target – located 1km southeast of
the A Deposit and within the current Sorby Hills Mining Leases.
Seismic line WP96-08 which traverses the project area south of A-Deposit shows that the basement
rocks of the Pincombe Inlier gradually plunge to the northeast and that its eastern flank subsides
across a series of extensional faults to the southeast (Figure 2). The seismic data is interpreted to
show that additional carbonate build-ups are buried below a thick pile of Carboniferous sediments
to the east within the Burt Range Sub-basin.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 3
The Pincombe No1 petroleum well drilled in 1996, intersected the Knox Formation – Sorby Dolomite
contact horizon at a depth of about 530 m below surface. The gamma data from the hole
demonstrates similar stratification in the Sorby Dolomite and Knox Formation interval to that seen
in the Sorby Hills area. The well log refers to abundant iron sulphides at the contact but notes a lack
of dolomitization.
Assuming that efficiency and productivity is maintained in the current program, Boab intends to
drill the Keep Seismic Target as part of the phase VII work program. The target is an extensional
graben setting up-dip in the hinge zone of a major half-graben down dip. The target falls within the
license area and is estimated to be between 200 and 400 m deep.
Figure 2 - Interpreted NE-SW trending seismic line WP_96-08 image showing the location of the Pincombe No1
oil well and the conceptual structural target within M80/287 & 289.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@BoabMetals.com
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 4
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by HenanYuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this Announcement relating to Exploration Results has been extracted
from the ASX Announcements titled “Assays Confirm Further Positive Outcome for Sorby” dated
23 January 2023, “Sorby Hills DFS Metallurgical Testwork Results” dated 19th November 2021
available to view at www.boabmetals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in these announcements.
The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the form in which they were first presented.
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Information included in this Quarterly Report relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and dated
19 January 2023, available to view at www.boabmetals.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Ore
Reserve Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.