Corporate Presentation
Released
Released
Announcement PDF
BUILDING AUSTRALIA’S
NEXT SILVER-LEAD PRODUCER
29 SEPTEMBER 2026
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
Boab Metals
Disclaimer
Boab Metals
Disclaimer
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and represent
the Company’s intentions, projections, expectations or beliefs concerning, among other things,
future operating and exploration results or the Company’s future performance. These forward-
looking statements speak, and the presentation generally speaks, only at the date hereof. The
projections, estimates and beliefs contained in such forward-looking statements necessarily
involve known and unknown risks and uncertainties, and are necessarily based on assumptions,
which may cause the Company’s actual performance and results in future periods to differ
materially from any express or implied estimates or projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This presentation
may contain information (including information derived from publicly available sources) that has
not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian law. The
presentation does not constitute or form part of any invitation, offer for sale or subscription or any
solicitation for any offer to buy or subscribe for any shares in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the time of
preparation. No representation or warranty, express or implied is made as to the fairness, accuracy
or completeness of the information, opinions and conclusions contained in this presentation. To
the maximum extent permitted by law, Boab Metals Limited, its related bodies corporate and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility
or liability for any loss arising from the use of the presentation or its contents or otherwise arising in
connection with it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been extracted from
the Mineral Resource Estimate dated 29 July 2026, available to view at boabmetals.com. The
Company confirms that it is not aware of any new information that materially affects the
information included in the Mineral Resource Estimate and that all material assumptions and
technical parameters underpinning the estimates, continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study, FEED
Study and Project Delivery Plan dated 19 January 2023, 6 June 2024 and 29 September 2026
respectively, available to view at www.boabmetals.com. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been extracted from
the ASX Announcements titled “KEEP confirmed as a Target for Further Exploration” dated 22
October 2024, “Significant Intercepts at Sorby Hills” dated 8 November 2023, “Amended Drilling
Announcement” dated 4 September 2023”, “Assays Confirm Further Positive Outcome for Sorby”
dated 23 January 2023, “High-Grade Lead-Silver Confirmed at Beta Deposit” dated 1 February 2022
available to view at www.boabmetals.com. The Company confirms that it is not aware of any new
information or data that materially affects the information included in these announcements. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the form in which they were first presented.
2
Boab Metals
ABOUT US
Boab Metals
ABOUT US
Boab Metals Limited (ASX:BML) is an Australian
resources company specialising in the exploration,
development, and production of base and precious
metals. Boab, via its flagship Sorby Hills Project located in
Western Australia, is positioning to become a significant
new producer of silver and lead, capitalising on strong
silver and lead market fundamentals to deliver long-term
shareholder value.
Boab also holds a portfolio of near mine and regional
exploration assets with the potential to support future
resource growth and mine life extensions.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
3
AUSTRALIA’S NEXT
SILVER-LEAD PRODUCER
Boab Metals
Discover Sorby Hills
Boab Metals
DISCOVER SORBY HILLS
Boab's flagship Sorby Hills silver-lead project in the
East Kimberley is Australia’s largest undeveloped,
near-surface silver-lead deposit.
This 100% owned project is fully funded and under
construction, targeting first production in the
second half of 2027.
Boab is taking a capital efficient approach to
developing Sorby Hills, leveraging existing regional
infrastructure and repurposing major assets to
reduce capital costs, construction timeline and the
need for new infrastructure.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
4
Strength Detail
Ownership 100%
Jurisdiction Tier-1 Western Australia
Mining
Method
Near-surface open-pit – low
complexity
Funding
>A$350M secured
(A$236M debt + A$117M equity)
Offtake Binding agreement with Trafigura
Plant
DeGrussa processing plant acquired
from Sandfire Resources
Timeline First concentrate H2 2027
Boab Metals
CORPORATE SNAPSHOT
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Capital Structure 27/09/2026
Shares on Issue 1 578 m
Share Price 40 cps
Market Capitalisation $231m
Cash Position $49m (31 August 2026)
Debt Outstanding Nil
Enterprise Value $182m
ASX-listed base and precious metals developer and explorer.
Final Investment Decision achieved on Sorby Hills.
Board &Management team with proven track record in development.
Top 20 shareholders hold 46% of issued capital.
Top Five Shareholders
# Holder Name 04/09/2026
1 Citicorp Nominees Pty Limited 14.60%
2 JP Morgan Nominees Australia PL 7.45%
3 BNP Paribas Nominees Pty 6.37%
4 HSBC Custody Nominees 2.94%
5 Villiers Queensland PL 2.21%
113.7m Performance rights
Substantial Shareholders
# Holder Name (Last Notice) 5 February 2026
1 Franklin Resources Inc. 7.12%
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
6
Boab Metals
INVESTMENT THESIS
Unlocking value through systematic Project derisking
Resource Definition Project Studies
and Permitting
Construction Phase Operations Phase/ Mine Life
Extension Drilling
BML acquires Sorby
Hills in 2018
Completion of Project
Feasibility Studies and
receipt of EPBC and EPA
Approvals
BML increase the Sorby
Hills Resource by 2.8x
Q4 – 2025, Boab Raises
+A$350M Debt and Equity
to Fully Fund Sorby Hills
development
Relative
Value
On Track for first
Production in H2 2027
Source, Lassonde Curve: Adapted from Lassonde, P. – Franco-Nevada Corporation
Release of Project
Delivery Plan NPV8
A$1,061Bn, IRR 97%
SILVER SNAPSHOT:
AT T H E CROSSROADS OF INDUSTRY & INVESTMENT
Ag
Silver
47
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Boab Metals
OUR COMMODITIES - SILVER
7
Unmatched conductivity makes silver
critical for solar panels, EV electronics and
central to the global energy transition.
INDUSTRIAL
DEMAND
As a monetary metal, silver is a store of
value, moving with gold during
inflationary or geopolitical uncertainty.
VALUE STORAGE
& SAFE HAVEN
With primary mine output declining, most
silver now coming only as a by-product,
and recycling stuck at ~20%, supply
cannot keep pace – entrenching a
structural deficit.
SUPPLY
SQUEEZE
Gold-silver ratio, investor flows to silver
EFTs, and leveraged futures trading all
leading to amplified volatility – giving silver
greater upside torque in bull markets.
SPECTULATIVE
KICKER
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Boab Metals
OUR COMMODITIES - LEAD
8
A led-acid battery is typically replaced two
to three times in a light vehicle's average
lifetime of around 12 years, supporting a
demand tail that will stretch decades.
ENDURING
DEMAND
Indian consumption of refined lead is
forecast to grow 5% YOY through to 2030.
INDIAN LEAD
DEMAND
High demand for silver bearing lead
concentrate is delivering record low
Concentrate Treatment Charges (negative
US$65/t).
SILVER
LINING
A Mature secondary market provides a
buffer against price shocks, limiting the
lead price to a relative tight and
predictable range.
PRICE
STABILITY
Pb
Lead
82
LEAD SNAPSHOT:
T H E ORIGINAL BATTERY METAL
Source: ILZSG Statistical Bulletin Oct 2025
SORBY HILLS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
9
PROVIDING INVESTORS WITH EXPOSURE TO RISING SILVER PRICES WHILE LEVERAGING
ROBUST PROJECT ECONOMICS UNDERPINNED BY A HISTORICALLY STABLE LEAD PRICE
The fully funded Sorby Hills Project is a near-term production asset in a Tier 1 jurisdiction.
Boab Metals
INVESTMENT THESIS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
10
Funding & Commercial
De-risking
Execution
Status
1. ASX Release 29 September 2026
Jurisdiction, Orebody
& Processing
• Low-risk Shallow open
pit mining operation
• Stage 1 mining
production, 10.5 years,
~2.2Moz silver and 68kt
lead per year1
• Conventional flotation
processing, delivering
strong recoveries in both
silver and lead.
• Offtake agreement with
Trafigura over 50% of
silver-lead concentrate
• ~A$350m funding
package secured to fully
fund the Project through
to production
• 100% project ownership
secured
• DeGrussa processing plant
acquisition completed
• Final investment decision
made
• Construction underway
• Binding Mining Services
Agreement Executed
• First concentrate targeted
H2 2027
Sorby Hills Project
PROJECT DELIVERY PLAN 1
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
11
NPV8 A$1.06B
IRR 97%
Strong pre-tax economics
A$205M pre-production Cost to
Complete Capex
(Cost incurred to Aug’26 of $56M and
$205M remaining to completion = Total
CAPEX $261.5M)
Average Annualised Production
93kt Silver-Lead concentrate 2.1Moz Silver
and 60kt Lead
C1 cash cost US$2.8/oz
payable Ag
Incl. net Lead credit of
US$55.6/oz payable Ag
A$184M p.a. Average EBITDA
2.25Mtpa
Optimised 10.5
Year Mine Life
A$1.7B Operating Cash Flow
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
Project Delivery Plan Highlights
SORBY HILLS REVENUE SPLIT
599kt Payable Lead A$1.7b revenue
Silver is expected to contribute over 55% of
forecast revenue.
Based on Forward Curve Assumptions:
Silver @ US$75/oz, Lead @ US$0.91/lb
20.3Moz Payable Silver A$2.2b revenue
1 ASX Announcement 29 September 2026
2 Forward curve Silver Price and exchange rate at 10 September 2026 and CRU lead prices at 30 June 2026 (as required by the Syndicated Facility Agreement)
Sorby Hills Project
FROM FEED TO DELIVERY
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Metric
FEED
STUDY
(June 2024)
PROJECT
DELIVERY PLAN1 CHANGE
Pre-Tax NPV8 A$411 Million A$1.06 Billion ↑ 158%
Pre-Tax IRR 37% 97% ↑ 59% pts
Mine Life 8.5 years 10.5 years ↑ 2 years
Payable Silver 17.2 Moz 20.1 Moz ↑ 18%
Payable Lead 546 kt 599 kt ↑ 10%
Free Cash Flow A$1.1 Billion A$1.7 Billion ↑ 55%
Average Annual EBITDA A$118 Million A$184 Million ↑ 56%
Project Status Study Phase
Construction
Underway
-
The Project has transitioned from development planning
into execution while simultaneously increasing value
1 ASX Announcement 29 September 2026
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
13
Sorby Hills Project
WHY ECONOMICS IMPROVED
MINERAL RESOURCE INCREASED
Mineral Resource increases to approximately 50.6Mt, a 7%
increase in total Mineral Resource tonnes
MINE LIFE EXTENDED
Updated drilling and reserve growth have extended
mine life to 10.5 years.
HIGHER COMMODITY VALUE
Silver price had increased significantly since the original
FEED Study was conducted
PROCESSING OPTIMISATION
Improved metallurgical recoveries from the Norton deposit
increase payable metal production
INFRASTRUCTURE ADVANTAGE
The DeGrussa Process Plant acquisition reduces capital
Intensity and execution risk
See ASX announcement 29 September 2026
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag AqEq Pb Zn Ag Ag Eq
% % g/t g/t kt kt koz koz
Aprilia 0.6 5.3% 1.0% 23 72.0 31 6 422 1,357
Bimota 3.2 3.4% 0.3% 18.8 49.8 106 10 1,920 5,077
Omega 18.4 3.2% 0.4% 32.9 62.3 585 73 19,412 36,772
Norton 22.8 2.5% 0.5% 32.8 56.3 582 108 24,069 41,338
Alpha Pb 1.4 3.1% 0.9% 64.0 92.7 45 13 2,974 4,314
Beta 4.2 3.6% 0.4% 43.0 76.3 151 17 5,856 10,335
Measured 13.1 3.4% 0.4% 42.0 73.7 450 48 17,562 30,928
Indicated 12.7 3.2% 0.4% 31.0 60.9 405 51 12,784 24,809
Inferred 24.9 2.6% 0.5% 30.0 54.3 645 128 24,315 43,455
Total1 50.6 3.0% 0.4% 34.0 60.9 1,500 226 54,660 99,192
Sorby Hills Project
MINERAL RESOURCE ESTIMATE
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
14
Alpha Zn 4.2 0.5% 2.5% 22 27 15 107 2,971 3,594
Measured - - - - - - - - -
Indicated 2.1 0.3% 2.8% 22.0 24.8 6 59 1,485 1,672
Inferred 2.1 0.4% 2.3% 21.0 24.7 8 48 1,418 1,667
Total2 4.2 0.5% 2.5% 22.0 26.6 15 107 2,971 3,594
1. Pb & NSR Domains, 1% Pb Cut-Off
2. Zn Domains only, 1% Zn Cut-Off
57%
Measured
17%
Inferred
PROJECT DELIVERY PLAN PRODUCTION TARGET
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
Strip
Ratio
Aprilia 4.2 3.9 0.3 4.4 19.3 11.9
Bimota 16.0 13.6 2.5 3.0 18.5 5.5
Omega South 27.4 23.4 4.0 2.5 28.3 5.8
Omega Main 59.1 51.1 8.0 3.3 37.0 6.4
Norton 39.7 36.1 3.6 3.2 57.6 10.0
Beta 40.1 36.5 3.6 3.2 41.4 10.1
Total Production 186.5 164.5 22.0 3.1 37.2 7.5
ORE RESERVE STATEMENT
Ore Reserve
Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz)
Proved 11.6 3.3% 41 378 15.2
Probable 6.7 3.0% 31 204 6.7
Total Ore Reserve 18.3 3.2% 37 582 22.0
Sorby Hills Project
LOW RISK OPEN PIT ORE RESERVE
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
1
See ASX announcement 28September2026
15
Production Target and Ore Reserve Growth Opportunities
✓Large shallow deposit allowing for efficient and effective Resource definition
✓Near-pit Resource extensions and defined strategic exploration targets
✓Structural change in Silver pricing allowing for larger open pit designs
Production Target underpinned 84% by Measured and Indicated Resources.
Including 97% Measured and Indicated Resources over the first 7 years of production.
Sorby Hills Project
GROWTH POTENTIAL
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
16
o Current Mine Plan represents only 37% of the
defined Resource at Sorby Hills
o Large shallow Resource allowing for efficient
and effective Reserve growth
o Near-pit Resource extensions and defined
regional strategic exploration targets
o Recent drill results have confirmed
mineralization well beyond current pit designs
(see ASX announcement 22 July 2026)
16
Figure: DFS pit shells with respect to the Resource block model
Production Target and
Strategic Growth Opportunities
Resource to
Reserve
Ongoing conversion
drilling, focused on
upgrading portions of
the existing Mineral
Resource to support
mine life extension.
Resource
Expansion
Targeting extensions to
known mineralisation
and previously excluded
silver-rich zones, with
potential to grow the
Mineral Resource.
Exploration
Drilling within the
broader Sorby Hills
tenure, testing targets
identified from
geological interpretation
and historical datasets.
Current Pit Designs
2.0
0
1.0
US$/lb Pb
Sorby Hills Project
Delivery Plan AISC ex-
Silver Credits
US$0.95/lb Pb
CRU long term Lead Price**
US$0.91/lb Pb
Sorby Hills Net
Silver Credits*
US$1.15/lb Pb
INCREASING SILVER PRICE
* Based on forward price of US$75/oz Ag at 10 September 2026
**CRU lead price as at June 2026
50%
MARGIN
Operating costs covered by a non-volatile lead price.
Operating margin fully leveraged to silver price movements.
Sorby Hills Project Costs are covered by Lead Revenues providing full exposure to Silver price movements
60
-50
0
US$/oz Ag
Sorby Hills AISC
ex Lead “Credits”
US$64/oz Ag
Sorby Hills Net
“Lead Credits”
US$56/oz Ag
The Sorby Hills Project is a
low-cost silver producer
Sorby Hills Project
COST STRUCTURE DELIVERING ‘FREE SILVER’
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Opex Revenue
17
AISC = US$8.7/oz Ag
Crushed Ore Storage Bin
Figure: 3D Model of the Sorby Hills
Process Plant produced by GRES during
FEED showing key components of the
design that have been secured via the
acquisition of the DeGrussa Processing
Plant.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
18
Sorby Hills Project
DEGRUSSA PROCESSING PLANT
All major processing plant components, together with an extensive
spares inventory, have been secured through the acquisition of the
DeGrussa Processing Plant from Sandfire Resources.
The acquisition materially reduces capital costs, shortens the
construction schedule and lowers project execution risk.
• A$20M Saving in Processing Plant Capital Costs
• 6-Month Reduction in Construction Timeline
DeGrussa Plant Acquisition – Lower Cost, Faster Delivery
Sorby Hills Project MINE TO MARKET
Sorby Hills Project
MINE TO MARKET
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
19
Wyndham Port located just 150km from Sorby Hills
by existing sealed road.
Port access Agreement executed with port operators
Cambridge Gulf. Concentrate to be transported from site to
Wyndham in sealed containers.
955kt of Concentrate shipped at an average 93kt pa.
• Average 711 g/t silver
• Average 66.0% lead
Spot Treatment Charges currently priced at minus US$300/t1 – versus
positive US$85/t benchmark average assumed in the Sorby Hills
Project Delivery Plan
Very positive reception to Expressions of Interest issued for
remaining 50% offtake for the first two years of production
2. Shanghai Metals Market – 7 September t2026
Sorby Hills Project Development on Track
Sorby Hills Project
DEVELOPMENT ON TRACK
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
20
Dismantling of the DeGrussa Processing Plant almost
completed
Long term Diesel Supply Contract executed with
Cambridge Gulf
100% of the Phase IX drilling program completed
Clearing of ROM Pad, Tailings Storage Facility and Haul
Road corridors completed ahead of schedule
Construction of the Evaporation Pond on track and topsoil
removal from Tailings Storage Facility has commenced
Company Asset Silver Production (koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2414
Boab
Metals
Sorby Hills
2,062
(Average annualised production)
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
Sorby Hills Project
A NEW FORCE IN SILVER
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
*Source FY24 and FY25 Annual Reports. List is not exhaustive
21
Figure: Location of the Sorby Hills Project
The Sorby Hills Project is set to become one of
the heavyweights in Australian silver mining.
M I N I N G C O N T R A C T H E A D S O F A G R E E M E N T S I G N E D 1
ReGroup selected for Sorby Hills Mine Services delivery
Full scope of mining services and plant feed
T H E R M O P O W E R P L A N T & S W I T C H R O O M O R D E R E D
Supply and Installation agreements in place
Engineering and manufacturing underway
D E G R U S S A P L A N T R E L O C A T I O N
Plant being dismantled and refurbished
Reconstruction at Sorby Hills
P R O J E C T W O R K S U N D E R W A Y
Early engineering underway and long-lead orders placed
Construction teams mobilised
D E V E L O P M E N T P R O G R E S S
On-site construction activity ramping up
Production remains on track for H2 2027
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
22
Sorby Hills Project
CONSTRUCTION UPDATE
1 See ASX announcement 28 September 2026
First production from Sorby Hills is scheduled to occur in H2 2027.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Sorby Hills Project
CONSTRUCTION TIMELINE
23
FUTURE GROWTH OPPORTUNITIES
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
24
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Sorby Hills Project
UNLOCKING PRODUCTION
GROWTH
25
Manbarrum Project
▪ located 25km east of the Sorby Hills Project.
▪ 175km2 of prospective tenements (including two granted mining leases) covering
geology related to that found at Sorby Hills.
▪ Mineral Resources declared at two prospects which are zinc and silver dominated.
▪ Conceptual open pit mining studies completed by CSA Global in 2018.
Eight Mile Creek
(Pb-Ag-Zn)
Keep Zn-Pb Target
Eight Mile Creek Project
▪ 30km of along-strike geology, highly prospective for deposits similar to Sorby Hills.
▪ The exploration success based on seismic data at the Keep Zinc-Lead Target has
opened the door for more bold exploration at Eight Mile Creek.
Keep Zinc Lead Target
▪ New Zinc-Lead mineralisation recently discovered via greenfield exploration within
the existing Sorby Hills mining leases.
▪ Ore grade intercepts include:
▪ SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb & 2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪ SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb & 5.86% Zn) and 36.7 g/t Ag from 303.0 m
Sorby Hills Project
A RECAP ON THE PROJECTS STRONG ECONOMICS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
26
1 Spot prices as at 10 September 2026 (Ag $65/oz, Pb $1,880/tn, Fx AUD/USD 0.715)
2 Forward curve Silver Price and exchange rate at 10 September 2026 and
CRU lead prices at 30 June 2026 (as required by the Syndicated Facility Agreement)
3 ASX Announcement 29 September 2026
Item Spot Prices1
Pre-Tax NPV8 A$821 Million
Pre-Tax IRR 86%
Cost to Complete A$205 Million
Average Annual EBITDA A$145 Million
Free Cash Flow A$1.3 Billion
C1 Cash Cost ex Lead Credits US$59.5/oz payable
C1 Cash Cost US$5.2/oz payable
Mine Life Increased to 10.5 years
First Production target Q2 2027
Item Base Case2
Project Delivery Plan3
Pre-Tax NPV8 A$1.06 Billion
Pre-Tax IRR 97%
Cost to Complete A$205 Million
Average Annual EBITDA A$184 Million
Free Cash Flow A$1.7 Billion
C1 Cash Cost ex Lead Credits US$58.4/oz payable
C1 Cash Cost US$2.8/oz payable
Mine Life Increased to 10.5 years
First Production target Q2 2027
A Fully Funded Silver-Lead Project
Generating Significant Value
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Sorby Hills Project
NEAR TERM CATALYSTS
27
Project delivery, construction progress and resource growth
Resource/Reserve Growth
Results from exploration and mine-life
extensional drilling
Competitive Tender
Tender process for the remaining concentrate
production. 50% of production available to
optimise value
Favourable Market Conditions
Opportunity to capture exceptionally low
treatment charges
Bulk and Ring Main Earthworks
Bulk Earthworks and Ring Main packages completion, providing
water management infrastructure for operations.
DeGrussa Plant Relocation
DeGrussa process plant relocation complete. Reconstruction at
Sorby Hills nearing completion.
Ore Body Exposure
Omega Pit ore body exposure continuing to deliver first ore to the
ROM in Q2 2027.
Q1 – 2027
Q4 – 2026
ASX: BML
Construction underway and advancing toward first production in 2027, with
multiple near-term catalysts to drive further project and shareholder value.
Simon Noon, Managing Director &CEO
www.boabmetals.com
info@boabmetals.com
+61 8 6268 0449
Facebook.com/boabmetalsltd
linkedin.com/company/boab-metals
@BoabMetals
Boab Metals
Thank you
Boab Metals
THANK YOU
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
28
Experienced mining
executive with a
strong track record in
project development,
capital raising,
corporate growth and
creating shareholder
value.
Simon Noon
Managing Director
& CEO
Sorby Hills Project
Excellence in project delivery
Sorby Hills Project
EXCELLENCE IN PROJECT DELIVERY
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
29
A Board and Management team with a proven track record in project development.
Engineer with over 30
years’ experience in the
Australian mining
industry, with a strong
track record in
successfully
commissioning and
operating base metal
mines.
Gary Comb
Chairman
Lawyer with significant
experience in the
exploration and mining
industry. Wealth of
expertise in corporate
advisory, strategic
consultancy and raising
capital.
Andrew Parker
Non-Exec. Director
Geologist with over 30
years’ experience in
technical, commercial,
marketing and finance
within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Mining executive with
30+ years’ experience in
large-scale mining.
Held senior leadership
roles with major
resources companies
including BHP,
Peabody, Mineral
Resources and Downer
Mining.
Russell Taylor
Project Director
Sorby Hills Project
PROJECT DELIVERY PLAN SENSITIVITY ANALYSIS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Assumption Unit Spot
Prices1
Base
Case2
Change
Silver Price US$/oz 65.0 75.1 16%
Lead Price US$/t 1,880 1,980 5%
FX A$:US$ 0.715 0.710 (1%)
Lead TC US$/t (170) 85 (150%)
1 Spot prices as at 10 September 2026, TC’s Shanghai Metals Market – 7 September t2026
2 Forward curve Silver Price and exchange rate at 10 September 2026 and CRU lead prices at 30 June
2026 (as required by the Syndicated Facility Agreement)
30
ASX 29 September 2026
Sorby Hills Project
Metal Equivalent Calculations
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Base Case Macroeconomic Assumptions
The contained metal equivalence formula is based on
o Lead Price US$2009/t; and
o Silver Price US$75/oz.
Lead Equivalent Calculations
• Silver recovery of 83.3% (weighted average of oxide and fresh
Ag recoveries); and
• Silver Payability rate of 95%.
Silver Equivalent Calculations
• Lead recovery of 88.4% (weighted average of oxide and fresh
Pb recoveries); and
• Lead Payability rate of 95%.
Pb
Ag
It is Boab’s opinion that all elements included in the metal
equivalent calculation have a reasonable potential to be recovered
and sold. The formula used to calculate equivalent grade is:
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
where R is the respective metallurgical metal recovery rate, S is
the respective smelter return rate, V is metal price/tonne or
ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary
metal (pri).
Metal equivalents are highly dependent on the metal prices used
to derive the formula. Boab notes that the metal equivalence
method used above is a simplified approach.
Owing to limited metallurgical data, zinc grades are not included at
this stage in the lead equivalent grade calculation.
Assumption Unit 2027 2028 2029 2030 2031+
Lead Price US$/t 1,980 1,976 1,966 1,981 2,021
Silver Price US$/oz 71.1 68.0 71.0 76.0 76.0
Exchange Rate A$:US$ 0.71 0.71 0.71 0.70 0.70
Share your feedback
Discover