Annual Report
Released
Released
Announcement PDF
ANNUAL REPORT
2024
ABN 43 107 159 713
ASX Code: BML
CORPORATE DIRECTORY
________________________________________________________
DIRECTORS
Gary Comb (Chairman)
Simon Noon (Managing Director & CEO)
Richard Monti (Non-Executive Director)
Andrew Parker (Non-Executive Director)
COMPANY SECRETARY
Jerry Monzu
REGISTERED OFFICE
4 Clive Street
WEST PERTH WA 6005
SHARE REGISTRY
Automic Group Pty Ltd
Level 5
191 St Georges Terrace
PERTH WA 6000
Tel: 1300 288 664
BANKERS
Australian and New Zealand Banking Group Limited
239 Murray Street
PERTH WA 6000
AUDITORS
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
SECURITIES EXCHANGE LISTING
Boab Metals Limited shares are listed on the
Australian Securities Exchange (Home Branch - Perth)
ASX Code: BML
WEBSITE ADDRESS
www.boabmetals.com
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
1
TABLE OF CONTENTS
________________________________________________________
Chairman’s Report
3
Managing Director’s Report
4
Review of Operations
6
Directors’ Report
16
Auditor’s Independence Declaration
31
Consolidated Statement of Profit or Loss & Other Comprehensive Income
32
Consolidated Statement of Financial Position
33
Consolidated Statement of Changes in Equity
34
Consolidated Statement of Cash Flows
35
Notes to the Financial Statements
36
Consolidated Entity Disclosure Statement
61
Directors’ Declaration
62
Independent Auditor’s Report
63
Shareholder Information
67
FORWARD LOOKING STATEMENTS
This Annual Report may contain forward looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties, and other factors, many of which are beyond the
Company’s control. Actual events or results may differ materially from the events or results expected or implied in any
forward-looking statement. The inclusion of such statements should not be regarded as a representation, warranty, or
prediction with respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or
are likely to be fulfilled. The Company undertakes no obligation to update any forward-looking statement to reflect events
or circumstances after the date of this document (subject to securities exchange disclosure requirements). The
information in this document does not consider the objectives, financial situation or needs of any person. Nothing
contained in this document constitutes investment, legal, tax, or other advice.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
2
CHAIRMAN’S REPORT
________________________________________________________
Dear Shareholders,
On behalf of your Board of Directors, I am pleased to present the 2024 Annual Report and recap on
the progress that Boab Metals Limited has made over the past financial year at our flagship Sorby Hills
Lead-Silver Project.
Following the completion of our Definitive Feasibility Study at Sorby Hills 2023, our stated objective
was to reach a Final Investment Decision on the Project during the 2024 Financial Year. Whilst we are
disappointed to have not achieved that objective in the set timeframe, Simon and the team have
continued to meaningfully advance the Project.
The completion of Front-End Engineering & Design (FEED) on our process plant, together with a range
of other project improvement workstreams completed over the past 12 months, have been
encapsulated in the Sorby Hills FEED Study, the results of which materially improve upon those of the
Sorby Hills Definitive Feasibility Study (DFS) and further derisk project execution.
Importantly, we have seen capital costs remain stable and forecast cashflows improve during the initial
years of production – both important criteria in the context of enhancing shareholder returns from the
Project and attracting project financiers.
Once again, our objective over the coming 12 months will be to reach a fully funded Final Investment
Decision at Sorby Hills. The recent option agreement executed with Yuguang to acquire their 25%
interest in the Project provides us with a clear runway to present Sorby Hills to project financiers on
the basis that it will be 100% owned by Boab Metals. To this end, the Company looks forward to
closing out our Offtake negotiations, finalising ongoing approvals workstreams, securing project
financing, and subsequently commencing construction at Sorby Hills during the 2025 Financial Year.
The Board is grateful for the patience and support of all shareholders and would like to thank our staff
for their hard work during the year.
Gary Comb
Chairman
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
3
MANAGING DIRECTOR’S REPORT
__________________________________________________________
Throughout the 2024 financial year, the Boab team has focused on workstreams required to bring about
a Final Investment Decision on our 75% owned Sorby Hills Lead-Silver Project located in the east
Kimberley Region of Western Australia.
The standout achievement of the year has been the delivery of the Sorby Hills Front-End Engineering and
Design (“FEED”) Study. Following the Definitive Feasibility Study (“DFS”), we identified clear opportunities
to optimise and derisk the Project both technically and economically. Over the past year, we have
successfully pursued these opportunities in conjunction with completing Front-End Engineering & Design
on our Process Plant with GR Engineering Services (“GRES”) and delivered a material improvement to
the Project.
Key highlights of the FEED study Base Case included:
• upfront Capital Expenditure of A$264M;
• average C1 Cost of US$ 0.36/lb payable Lead (including silver credits);
• pre-tax NPV8 of A$411M, pre-tax IRR of 37%; and
• average annual EBITDA of A$126M.
The Base Case metrics were the result of Project updates alone (i.e. excluding any change in
macroeconomic assumptions) and delivered an increase of +A$73M Net Cash Flow and +A$41M NPV8
compared to the DFS. Importantly, the net change to pre-production Capital Expenditure was limited
compared to the DFS and project pre-tax cash flows over the initial 5 years of production have improved
by +A$150M providing a stronger profile to support debt financing.
Our decision to present our base case scenario using the same macroeconomic assumptions as the DFS
was important to demonstrate the material impact of project enhancements alone. Assuming spot metal
prices and exchange rates at the time of release results in a pre-tax NPV8 of A$596M, pre-tax IRR of 47%
and average annual EBITDA of A$160M demonstrating the Project’s leverage to metal prices including
silver.
In the first half of the year, we completed our Phase VII drilling program at Sorby Hills. In addition to
recovering samples for additional metallurgical testwork that resulted in improved lead recoveries for the
Norton Deposit, the program delivered an exciting intersection of mineralisation in the first and only hole
drilled at the Keep Seismic Target located 2km south of the existing Sorby Hills deposits. Accordingly, we
have followed up this result with an additional four drill holes as part of our ongoing Phase VIII drill
program.
With respect to progress toward a Final Investment Decision, negotiation with shortlisted Offtakers for the
Sorby Hills concentrate continues to advance and the process of re-engaging with project financiers off
the back of the FEED Study is well underway with the completion of an updated Independent Technical
Review of the Project. Furthermore, the Company continues to work diligently through Environmental
approval amendments required as a result of the increase in Project size and scope.
Boab’s proud support of the local community continued throughout the period with our ongoing
sponsorship of the renowned Ord Valley Muster held in May 2024.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
4
MANAGING DIRECTOR’S REPORT
__________________________________________________________
I’d like to take this opportunity to acknowledge all of our staff and their families for their continued hard
work. I would like to also extend my appreciation to my fellow Board members for their invaluable
guidance over the 2024 financial year.
Lastly, a big thank you to our shareholders, both new and old, for their confidence in Boab Metals. We
look forward to rewarding your support over the coming year.
Simon Noon
Managing Director & CEO
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
5
REVIEW OF OPERATIONS
__________________________________________________________
OVERVIEW
During the Financial Year to 30 June 2024, Boab Metals Ltd (“Boab”) has continued to focus on reaching
a Final Investment Decision at its 75% owned Sorby Hills Project (“Sorby Hills” or “the Project”), located
within the Kimberley Region of Western Australia. Sorby Hills is the largest undeveloped, near-surface
Lead-Silver-Zinc deposit in Australia.
The year was highlighted by the completion of the Sorby Hills Front-End Engineering and Design
(“FEED”) Study 1. Key results for the FEED Study included:
•
Project updates (excluding any change in macroeconomic assumptions) delivering an increase of
+A$73M Net Cash Flow and +A$41M NPV8 compared to the January 2023 Sorby Hills Definitive
Feasibility Study (“DFS”).
•
Importantly, the net change to pre-production Capital Expenditure is limited compared to the DFS
and project pre-tax cash flows over the initial 5 years of production have improved by +A$150M
providing a stronger profile to support debt financing.
•
Key Project Metrics include upfront Capital Expenditure of A$264M and an average C1 Cost of
US$ 0.36/lb payable Lead (including silver credits).
•
Assuming spot pricing for Lead, Silver, Exchange Rate and current Benchmark Lead Treatment
and Silver Refining Charges at the time of the study’s release resulted in an NPV8 of A$596M, pretax IRR of 47% and average annual EBITDA of A$160M.
Key Project updates incorporated into the FEED Study included:
•
Updated post FEED pricing for the Process Plant EPC Contract provided by GR Engineering
Service (“GRES”).
•
Updated mining schedule bringing forward mining of the high-grade Norton Deposit.
•
Updated metal recovery and concentrate grades for the Norton Deposit based on new
metallurgical testwork on core recovered during the Phase VII drilling program.
•
Updated pricing for the Mining and Earthworks Contracts provided on a bundled basis and based
on the optimised site layout and mining schedule.
•
Updated tailings strategy with above-ground tailings disposal being employed for the Life of Mine
as opposed to in-pit deposition previously adopted in the DFS
Results from the Phase VII Drilling Program 2 at Sorby Hills were received during the Financial Year.
Highlights from the program included:
1
2
•
SHSD_171: 11.05m @ 17.63% PbEq (10.98% Pb & 189 g/t Ag) from 81.95m
•
SHSD_174: 11.60m @ 20.23% PbEq (8.78%Pb & 325 g/t Ag) from 74.40m
•
Assays confirmed a significant Intercept of 9.55m @ 5.1% PbEq from 243m from the first drill hole
completed at the Keep Seismic Target, located approximately 2km from the existing Sorby Hills
Reserves.
ASX Release 6 June 2024
ASX Release 8 November 2023
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
6
REVIEW OF OPERATIONS
__________________________________________________________
SORBY HILLS FEED STUDY
Project Summary
Sorby Hills is the largest undeveloped, near-surface Lead-Silver-Zinc deposit in Australia. The Project
comprises granted mining leases covering six known Lead-Silver-Zinc deposits in the Kimberley Region
of Western Australia, 50km northeast of Kununurra and 90km east of Wyndham Port (Figure 1). Boab
holds a 75% interest in the Project. Boab’s Joint Venture partner in the Project is Henan Yuguang Gold
& Lead Co. Ltd, China’s largest Lead smelters ad silver producer.
On 19 January 2023, Boab released a DFS for the Project 3. Over the initial 8.5-year processing period
contemplated by the DFS, 18.3Mt of ore was proposed to be mined and processed through the Sorby
Hills process plant to deliver an average 103ktpa of concentrate containing 64ktpa of payable lead and
2Mozpa of payable silver to generate a pre-tax NPV8 of A$370M and IRR of 35%. The DFS economics
were underpinned by Ore Reserves of 15.2Mt at 3.5% Pb and 39g/t Ag, and a large, well-defined Mineral
Resource of 47.3Mt at 3.1% Pb, 35g/t Ag and 0.4% Zn 4.
The FEED Study released by the Company on 6 June 2024 augments and enhances the Sorby Hills DFS
via various specific updates to the Project.
Figure 1: Location of the Sorby Hills Project with respect to Boab’s other 100% owned
Lead-Silver-Zinc exploration assets in the region.
3
4
ASX Release 19 January 2023
ASX Release 17 December 2021
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
7
REVIEW OF OPERATIONS
__________________________________________________________
FEED Study Results Summary
A high-level comparison of the DFS and FEED Study base case results and the impact of adopting current
macroeconomics (“Spot Case”) is shown in (Table 1).
Table 1: Comparison of FEED Study Result with the DFS
Item
Macroeconomics
Unit
DFS
FEED
Variance
Pb = US$2,253/t, Ag = US$27.4/oz; A$:US = $0.68,
Pb TC = US$125/t conc., Ag RC = US$1.25/oz paid
Mining Inventory
“Spot Case”
See
Footnote 5
18.3 Mt at 3.4% Lead and 39g/t Silver
Recovered Lead
kt
571
575
1%
575
Recovered Silver
Moz
18.6
18.6
(0%)
18.6
Upfront Capital Cost
A$M
245
264
8%
264
C1 Cost (incl. credits)
US$/lb Pb
0.39
0.36
(8%)
0.25
Net Cash Flow
A$M
705
778
10%
1,067
LOM Average EBITDA
A$M
119
126
5%
160
Pre-Tax NPV8
A$M
370
411
11%
596
Pre-Tax IRR
%
35%
37%
3%
47%
Figure 2: 3D Model of the Sorby Hills Process Plant produced by GRES during FEED.
Based on spot prices as at 28 May 2024: US$2,344/t Lead, US$32.1/oz Silver, A$:US$0.66, Benchmark Lead Treatment Charge of US$98/t and Silver
Refining Charge of US$0.95/oz
5
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
8
REVIEW OF OPERATIONS
_________________________________________________________
Operating Cost Summary
The DFS forecast a C1 unit operating cost of US$0.39/lb payable lead including silver credits. An
independent review by CRU Global confirmed Sorby Hills as a 1st quartile lead producer on an ex-works
(i.e. excluding credits and selling costs) 6.
Through a combination of operational optimisations including updated mining contract pricing and
enhanced recoveries at Norton, the FEED study delivered unit operating costs of US$0.36/lb payable lead
(Table 2). Key Operation improvements included:
•
Reversion to a wholly above ground tailings storage facility relaxing the need for the lower grade
Omega South deposit to be mined earlier in the schedule for the purpose of providing an in-pit
tailings depository.
•
Updated mining schedule bringing forward the mining of the high-grade Norton Deposit.
•
Updated Tendered Pricing for the Mining Contract on the basis on bundling it with the Bulk
Earthworks Contract;
•
Improved metallurgical recoveries for lead in fresh ore at the Norton Deposit based on new
testwork undertaken on samples collected during the Phase VII drilling program.
•
Concessional Loading allowing Boab to transport approximately 20% more concentrate per road
train making for a more efficient logistics chains.
Table 2: Operating Cost Summary
Operating Costs
6
FEED Study
DFS
Variance
Unit
A$M
A$/t
US$/lb paid Pb
US$/lb paid Pb
%
Logistics
117
6.40
0.07
0.07
(4%)
Mining
547
29.96
0.31
0.34
(8%)
Processing
388
21.27
0.22
0.22
(1%)
G&A
88
4.80
0.05
0.05
(1%)
Lead Treatment
160
8.76
0.09
0.09
-
C1 Costs (ex. Credits)
1,300
71.19
0.74
0.77
(5%)
Net Silver Credits
(661)
(36.21)
(0.37)
(0.38)
(1%)
C1 Costs
639
34.98
0.36
0.39
(8%)
Royalties
95
5.20
0.05
0.05
-
Sustaining Capital
26
1.45
0.01
0.03
(52%)
AISC
760
41.63
0.43
0.48
(10%)
ASX Release 6 November 2023
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
9
REVIEW OF OPERATIONS
_________________________________________________________
Capital Cost Summary
The DFS estimated a pre-production capital cost of A$245M. The FEED Study resulted in a modest
increase in the pre-production capital cost to A$264M but a reduction in the Life Of Mine capital cost
(Table 3). Key Capital cost changes included:
•
Pricing for the process plant EPC contract in the DFS was A$130.6M based on tenders received
at the time. Following the conclusion of FEED, the EPC contract has been repriced by GRES at
A$134.9M representing a 3% increase over the DFS pricing.
•
Bundling the Earthwork Contract with the Mining Contract resulted in significant savings,
particularly in respect to the construction and management of haul roads.
•
A Heads of Agreement 7 was executed on 19 July, 2023 between Sorby Management Pty Ltd and
the Shire of Wyndham and East Kimberley for the construction and long-term lease of a new 180person accommodation Facility located in Kununurra.
For the purpose of the FEED Study, provision was made to fully refurbish and upgrade the secondhand camp previously purchased by Boab in order to house the workforce during the construction
and operations phase of the Project.
•
Additional capital provisions were made for owner’s spares (+A$3.0M). Upfront Capital
Contingency has increased from A$20.9M to A$22.7M.
Table 3: Capital Cost Summary
Capital Costs
FEED Study
DFS
Variance
A$M
A$M
A$M
-
134.9
130.5
4.3
31.9
4.9
36.9
54.5
(17.6)
Water Management
8.1
11.7
19.8
24.8
(5.0)
Accommodation Village
11.5
-
11.5
4.1
7.4
Other Infrastructure
8.5
0.6
9.1
10.1
(1.0)
Owners Costs
32.0
-
32.0
31.0
0.9
Contingency
22.7
-
22.7
20.9
1.8
Pre-Production Opex
15.0
-
15.0
14.6
0.4
-
9.3
9.3
9.3
-
264.5
26.5
290.9
299.8
(8.8)
Pre-Production
Sustaining
Total
Unit Cost
A$M
A$M
EPC Contract
134.9
Site Est./Bulk Earthworks
Closure Costs
Total Capital Expenditure
PHASE VII DRILLING PROGRAM
The Phase VII drilling program was conducted at Sorby Hills during the first half of the Financial Year and
concluded with the completion of 22 drill holes for 2,634 (an additional 24% of metres than originally
planned). Of the total program, 1,433 m across 13 holes were drilled for a metallurgical purpose with
another 1,200m across 9 holes drilled for Resource/Reserve expansion and exploratory objectives
(Figure 5).
7
ASX Release 19 July 2023
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
10
REVIEW OF OPERATIONS
_________________________________________________________
Figure 3 (above) and Figure 4 (below) - Phase VII drilling at Sorby Hills Project
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
11
REVIEW OF OPERATIONS
_________________________________________________________
Figure 5: Plan view of the Sorby Hills Project showing the locations of completed drill holes for
Phase VII with respect to previous drilling, the Mineral Resource and the proposed Sorby Hills
open pit outlines.
A highlight of the Phase VII program included a significant intercept from the maiden hole drilled at the
Keep Seismic Target located ~2km from the existing Sorby Hills Reserves. As announced in August 2023,
the interpretation of seismic data from petroleum exploration across the Burt Range Sub-Basin resulted
in a conceptual drill target – the Keep Seismic Target.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
12
REVIEW OF OPERATIONS
__________________________________________________________
SHSD_185 was aimed at testing the potential for a mineralised feeder fault system, which can be seen in
the seismic data, and the potential for stratiform mineralisation at the Knox Formation/Sorby Dolomite
interface (Figure 6). Assay results confirmed the significance of the observed mineralisation:
•
SHSD_185: 9.55m @5.10% PbEq (2.59% Pb & 2.26% Zn) from 242.55m (Incl. 3.12m @ 13.43%
PbEq (6.37%) Pb & 6.36% Zn) and 26.5 g/t Ag from 245.36m.)
The Company is of the view that the initial analytical and geological results at the Keep Seismic Target are
a major exploration success proving up concept but most importantly the potential of several kilometres
of thick sedimentary rocks of the Burt Range Basin to be the source of significantly more base metal
mineralisation.
Figure 6: Sectional view and geological interpretation of seismic line WP_96-08 overlain with assay results
from SHSD_185.
Metallurgical portion of the program was underpinned by the prospect of spatially restricting or revising
upwards the recovery factors of ore from Norton and to provide additional core upon which further test
work can be undertaken. The ore grade intervals encountered testified to the robustness of the Norton
mineralisation with its clean low-iron and high silver values within the mineralisation envelope.
Flotation variability tests from undertaken on drill core samples collected from the Phase VII program
delivered a 5% increase in Norton Deposit lead recovery from 78% to 83% and confirmed silver recovery
at 78%, together with an improvement in concentrate grade from 56.9% Pb to 59.5% Pb 8. The improved
metallurgical results were incorporated into FEED Study.
APPROVALS
The Project has previously received clearance under the Environmental Protection and Biodiversity
Conservation Act (‘EPBC’) act in 2013. However, given the increased scale the Company deemed it
prudent to seek reconfirmation.
8
ASX Release 22nd May 2024
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
13
REVIEW OF OPERATIONS
__________________________________________________________
In a request for further information received during the December quarter, the Department of Climate
Change, Energy, the Environment and Water (‘DCCEEW’) confirmed the project is now considered a
“controlled action” under the EPBC act, however, can be assessed with only preliminary documentation
required. The Company secured the services of a specialist consultant to commence surveying in the
March quarter.
OFFTAKE AND PROJECT FINANCE
The Company has held positive discussions with Offtakers dating back prior to the DFS and during the
Financial Year continued to negotiate terms with short-listed parties.
It is proposed that the Project will be funded via a combination of debt and equity contributed by the
Sorby Hills Joint Venture partners in proportion to their interest in the Joint Venture. Assessment of the
debt-carrying capacity of the Project based on indicative commercial bank project financing terms and
the FEED Study project cashflows demonstrate that the Project can support up to 60% gearing at a Debt
Service Coverage Ratios typical of those required to support project financing. Following release of the
FEED Study, the Company finalised an update of the Independent Technical Review required by financiers
to assess the Project.
CORPORATE ACTIVITIES
Completion of Placement and Fully Underwritten Entitlement Offer
On 3 May 2024, the company announced a fully underwritten A$5.0 million capital raising at A$0.10/share
to progress the Sorby Hills Project. The capital raise comprised:
•
A$1.7M share placement to institutional investors; and
•
A$3.3M Non-Renounceable Entitlement Offer to eligible shareholders.
Pursuant to the capital raising, 49,932,336 new shares were issued to new and existing shareholders.
Boab’s Board all participated in the entitlement offer. Funds raised will be used to finalise workstreams
required to support project financing, advance an exploration drilling campaign during the coming dry
season, ramp up the Sorby Hills project team and early site establishment works.
At-the-market (ATM) Facility
On 22 December 2023, the Company established an At-the-market subscription with Acuity Capital. The
ATM provides Boab with up to $5,000,000 of standby equity capital over the 38-month period to 31
January 2027. As security for the ATM, the Company placed 9,000,000 fully paid ordinary BML shares
from its LR7.1 capacity at nil cash consideration to Acuity Capital.
During May 2024, the ATM Facility was activated and used to raise $185,000 (inclusive of costs) through
the set-off of 1,230,000 Company collateral shares previously issued to Acuity Capital). The Set-off Shares
had a deemed price of $0.15 per share, being a premium of 6.3% to the Company’s 15 trading day volume
weighted average Share price of $0.1411 to 30 April 2024 (inclusive).
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
14
REVIEW OF OPERATIONS
__________________________________________________________
COMPLIANCE STATEMENTS
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the
‘JORC Code”) sets out minimum standards, recommendations and guidelines for Public Reporting in
Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this activities report relating to Exploration Results has been extracted from the
ASX Announcements titled “Significant Intercepts at Sorby Hills” dated 8 November 2023. Information
included in this report relating to Mineral Resources has been extracted from the Mineral Resource
Estimate dated 17 December 2021 Information included in this report relating to Ore Reserves, Production
Targets and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and
FEED Study and dated 19 January 2023 and 6 June 2024 respectively.
In each case, the respective announcements are available to view at www.boabmetals.com.au and the
Company confirms that it is not aware of any new information or data that materially affects the information
included and that all material assumptions and technical parameters underpinning the estimates,
production targets and financial forecasts continue to apply and have not materially changed. The
Company further confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
15
DIRECTORS’ REPORT
________________________________________________________
FINANCIAL AND OPERATING REVIEW
FINANCIAL REVIEW
The Group began the financial year with a cash reserve of $4,578,654. During the year, total
exploration expenditure incurred by the Group amounted to $1,771,174 (2023: $4,185,218). In line
with the Group’s accounting policies, all exploration expenditure incurred in the ordinary course of
operations was expensed. The result for the year was an operating loss after income tax of $3,321,974
(2023: $5,917,433). As at 30 June 2024, available cash funds totalled $5,663,582 (2023: $4,578,654).
OPERATING RESULTS
Summarised operating results for the year are as follows:
2024
Geographic Segments
Australia
Revenues and (loss) from ordinary activities before income tax
expense
Colombia
Revenues and profit from ordinary activities before income tax
expense
Revenue/(Loss before income tax)
Shareholder Returns
Basic Loss per share (cents per share)
Revenues
$
Results
$
237,784
(3,316,658)
-
(5,316)
237,784
(3,321,974)
2024
(1.80)
2023
(3.58)
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
During the year there were no significant changes in the state of affairs of the Group other than as
disclosed in this report.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2024
16
DIRECTORS’ REPORT
________________________________________________________
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL YEAR
Subsequent to the financial year end, Boab executed an option agreement with joint venture partner
Henan Yuguang Gold & Lead Co. Ltd (“Yuguang”) to acquire their 25% interest Sorby Hills Lead-SilverZinc Project.
Terms of the Agreement included:
•
12-month option for Boab to acquire Yuguang’s 25% interest in Sorby Hills,
increasing Boab’s current 75% interest in the Project to 100%.
•
During the option period, Boab will carry Yuguang’s joint venture expenses and in
turn, will have full control over joint venture budgets and work programs.
•
Should the option be exercised, Boab will pay Yuguang:
o
Tranche 1: A$12.5M upon exercise of the option and the concurrent
acquisition of Yuguang’s 25% Joint Venture interest;
o
Tranche 2: A$5.5M payable no later than 12 months from the commencement
of concentrate production at Sorby Hills; and
o
Tranche 3: A$5.0M payable no later than 18 months from the commencement
of concentrate production at Sorby Hills.
The ability to exercise the option is subject to Boab reaching a Final Investment Decision (FID) on the
Sorby Hills Project within the next 12 months.
The agreement provides Boab with the opportunity to present the Project to potential offtakers and
project financiers on the on the basis of having the option to acquire 100% ownership of the Project
and the Sorby Hills concentrate.
There were no other matters subsequent to the end of the financial year that materially affected the
financial accounts and required separate disclosure.
LIKELY DEVELOPMENTS AND EXPECTED RESULTS
The Group will continue exploration and development activities and to assess commercial
opportunities for corporate growth, including the acquisition of interests in projects, as they arise. Due
to the unpredictable nature of these opportunities, developments may occur at short notice.
ENVIRONMENTAL REGULATION AND PERFORMANCE
The Group is subject to substantial environmental regulation regarding its exploration activities. The
Group endeavours to maintain an appropriate standard of environmental care through awareness of,
and compliance with, new and existing environmental legislation. The Directors are not aware of any
breach of environmental legislation for the year under review.
RISK MANAGEMENT
The Board is responsible for ensuring that risks and opportunities are identified on a timely basis and
that activities are aligned with these. At this stage of the Company’s development the Board has not
established a separate risk management committee under the belief that it is crucial for all Board
mem
Share your feedback
Discover