Testwork Improves Metal Recovery & Concentrate Grades
Released
Released
Announcement PDF
22 May 2024
Metallurgical Testwork Improves Metal Recovery and
Concentrate Grades at the Norton Deposit
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to announce interim
results of additional metallurgical testwork at its 75% owned Sorby Hills Lead-Silver-Zinc Project
(“Sorby Hills” or “the Project”), located in the Kimberley Region of Western Australia. These
results augment and enhance the Sorby Hills Definitive Feasibility Study (“DFS”) released by the
Company in January 2023, and will be used in the current front end engineering and design
study (“FEED Study”).
HIGHLIGHTS
•
Incorporating the interim results of flotation variability tests from additional post DFS
drill core samples delivers a 5% increase in Norton Deposit lead recovery from 78% to 83%
and confirms silver recovery at 78%, together with an improvement in concentrate grade
from 56.9% Pb to 59.5%Pb.
•
Results to be included in the soon to be released FEED Study.
•
Improved metallurgy confirms the merit of a future reassessment the Ore Reserve at
Norton Deposit via rerunning pit optimisations and open pit design.
Boab Managing Director and CEO, Simon Noon, stated:
“Due to limited sample availability during the DFS, we were unable to fully complete the desired
volume of metallurgical testwork on the Norton deposit. Consequently, a conservative approach
to metal recovery was adopted resulting in approximately 500kt of ore being removed from the
Norton mining inventory compared with the Sorby Hills PFS.
The Phase VII drilling program completed in 2023 provided an opportunity to collect further
samples for metallurgical testwork. This testwork has been ongoing during 2024 and the results
support the case for higher recoveries at Norton and the potential to improve mine life via a
future reassessment of pit optimisations and pit designs associated with the deposit.
We look forward to incorporating the updated recoveries and concentrate grades into our
upcoming FEED Study and subsequently exploring further enhancements to the mine plan.”
Background
Metallurgical testwork conducted during the DFS returned concentrate grade and recoveries
for the Norton deposit that were unexpectedly lower than those achieved on samples from the
other Sorby Hills deposits. While historic testwork had suggested higher recoveries were
achievable at Norton, there was insufficient core available to undertake further testwork at the
time therefore the reduced recoveries were adopted for the DFS. The reduced recoveries
resulted in approximately 500kt of ore dropping out of the Norton mining inventory compared
with the Sorby Hills Pre-Feasibility Study.
During 2023, the Company undertook a Phase VII diamond drilling campaign of which 13 holes
were dedicated to the collection of metallurgical core samples from the Norton deposit. The
new metallurgical drill holes were spaced evenly across the deposit in order to determine if any
spatial variation was present. Twenty samples were composited for testwork.
Batch flotation testwork based on the Sorby Hills process flowsheet and fresh ore reagent
regime was undertaken on the 20 samples. For this interim estimate, two samples were
excluded due to the head grade being below the cut-off (<1% Pb) and a further two samples
were excluded due to their classification as oxidised ore based on their sulphur deficiency,
leaving 16 new sample results combined with the original five DFS samples.
Table 1: DFS and Interim Updated Metallurgical Testwork Programs - Sample Summary.
Test Type
Variability Tests
Composites Tests
DFS Metallurgical Testwork
Flotation
34 (5 Norton)
3 x Schedule and 3 Master
for each of Fresh, Oxidised and Blend
Comminution
18
3 x Schedule
HLS
13
2
Interim Updated Metallurgical Testwork
Flotation
16
Nil
Inclusive of the 5 fresh ore samples tested as part of the DFS, the average recovery for fresh ore
at the Norton deposit, including adjustment for previous locked-cycle testwork, increases from
78.2% to 82.8% and the silver recovery remains at 78% (Table 2). Concentrate grade also increases
from 56.9 to 59.5% Pb. Fresh ore comprised 99% of the ore mined from Norton in the DFS. The
updated results will be incorporated into the upcoming FEED Study results.
Table 2: DFS versus updated recoveries at the Norton Deposit
Deposit
Average Lead Recovery
%
Average Silver
Recovery %
Norton Deposit - DFS
78%
78%
Other Deposits - DFS
93%
83%
Overall Average – DFS
91%
82%
Norton Deposit – Updated
83%
78%
Overall Average - Updated
92%
82%
This updated Norton metallurgical performance estimate is an interim estimate conducted
mid-way through the ongoing Norton metallurgical testwork program. A final revision of the
Norton deposit metallurgical performance is expected to be released by end of the September
quarter 2024.
ASX Announcement
Page 2
Further Opportunities
Further analysis of Norton metal recoveries – The additional metallurgical testwork on Norton
has improved average lead recoveries from ore sourced at that deposit. Further analysis will be
aimed at gaining a clear understanding of the geological controls on recoveries and therefore
the ability to selectively mine the deposit.
Updated Production Target and Ore Reserve – Improved metallurgical results for the Norton
deposit present an opportunity to increase the volume of economic ore at Norton by rerunning
pit optimisations and open pit designs incorporating the latest recovery results and updated
operating costs / cut-off grades.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@BoabMetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest
held by Henan Yuguang Gold & Lead Co. Ltd. Sorby Hills is located 50km from the regional centre
of Kununurra in the East Kimberley and has existing sealed roads to transport concentrate from
site to the facilities at Wyndham Port, a distance of 150km. Established infrastructure and
existing permitting allows for fast-track production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information
prepared by Dr Simon Dorling. Dr Dorling is a member of the Australasian Institute of
Geoscientists (Member Number: 3101). Dr Dorling has sufficient experience which is relevant to
the style of mineralization and type of deposit under consideration and to the activity which
they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
JORC Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Dr Dorling consents to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
ASX Announcement
Page 3
APPENDIX A: Metallurgical Testwork on Norton deposit Samples – Additional Information
The Phase VII drilling program concluded with the completion of 22 drill holes for 2,634 (an
additional 24% of metres than originally planned). Of the total program, 1,433 m across 13 holes
were drilled for metallurgical purposes, with another 1,200m across 9 holes drilled for
resource/reserve expansion and exploratory objectives (Table A1).
The metallurgical portion of the program was underpinned by the prospect of spatially
restricting or revising upwards the recovery factors of ore from Norton and to provide additional
core upon which further test work can be undertaken.
Table A1: Drill Collars from the Phase VII Drilling campaign.
ASX Announcement
Page 4
Table A2: Drill core samples from the Norton Deposits for updated Metallurgical testwork.
Sample ID
Drill Hole
From Intercept (m)
To Intercept (m)
Interval Section
Interval Weight
%Pb
%Zn
%Fe
%S
Agppm
%SD
FR165A
FR165B
FR167A
FR167B
FR168A
FR168B
FR169A
FR169B
FR174A
FR174B
FR174C
FR176A
FR176B
FR176C
FR177A
FR177B
FR177C
FR178A
FR179A
FR180A
SHSD_165
SHSD_165
SHSD_167
SHSD_167
SHSD_168
SHSD_168
SHSD_169
SHSD_169
SHSD_174
SHSD_174
SHSD_174
SHSD_176
SHSD_176
SHSD_176
SHSD_177
SHSD_177
SHSD_177
SHSD_178
SHSD_179
SHSD_180
99.15
103.70
93.50
96.10
96.10
101.50
88.75
94.60
67.80
72.35
78.00
70.80
75.30
81.50
73.45
81.70
86.00
53.00
53.50
45.20
103.70
108.85
96.10
100.50
101.50
106.00
94.60
99.75
72.35
78.00
82.85
75.30
81.50
85.30
77.90
86.00
89.70
59.00
56.50
50.75
4.55
5.15
2.60
4.40
5.40
4.50
5.85
5.15
4.55
5.65
4.85
4.50
6.20
3.80
4.45
4.30
3.70
6.00
3.00
5.55
24.88
29.30
15.22
30.06
32.10
25.04
35.48
31.06
24.06
30.28
27.66
23.16
35.96
21.96
25.42
25.38
20.96
34.96
16.00
29.96
1.26
1.07
4.89
1.21
3.10
1.88
1.28
0.86
0.60
2.85
13.50
3.23
1.22
7.19
1.91
1.15
2.50
1.80
5.02
2.94
0.06
0.41
0.03
0.02
1.75
0.02
0.02
0.08
0.09
0.27
0.07
0.25
0.02
0.07
0.11
0.03
0.03
0.29
0.85
0.55
2.19
6.34
2.76
2.84
4.35
7.01
4.36
5.59
3.09
3.21
2.59
4.54
3.20
3.14
3.91
2.25
2.13
2.67
2.55
3.88
1.01
6.29
1.75
1.34
4.56
6.94
3.16
4.84
1.97
1.11
2.42
3.54
1.70
3.29
2.70
0.59
1.16
1.19
1.85
3.28
7.9
11.4
25.4
9.9
42.0
24.8
20.3
16.6
9.0
56.6
539.0
25.8
14.3
53.2
32.3
19.5
27.1
26.2
47.0
77.6
63
18
56
61
28
17
39
26
46
74
52
39
56
31
44
79
59
66
55
37
•
•
•
Note 1: FR169B and FR174A data excluded due to below cut-off head grade.
Note 2: FR174B and FR174C data excluded due to high %Sulphur Deficiency and suspected high cerussite to tailings (to be retested using NaSH).
Note 3: FR168A and FR178A used sphalerite depression due to high Zn.
A total of 20 new samples were composited and subjected to flotation testwork. Four of these
samples have rejected from this interim performance analysis; two due to low (<1%Pb) head
grade, and two due to high sulphur deficiency indicating significant cerussite lead present. Of
the 16 included samples, two used ZnSO4 for sphalerite depression. The remaining samples used
the standard reagent regime developed in the DFS. The limited application of sphalerite
suppression is expected to have negligible impact on project operating costs.
The recovery estimate includes the original five DFS Norton flotation variability sample results
and the sixteen new sample results. The overall average result is calculated is a “metal weighted
average” taking account of the sample intercept width and head grade, as was used in the DFS.
The performance of the individual samples and the overall weighted average are shown in Table
2. The direct comparison to the DFS estimate is shown in Table 3.
Table A3: Comparison of Norton Fresh Ore Metallurgical Results - DFS versus Updated.
DFS
Batch Test Recleaner
Batch Test Interpreted
LCT Correction
LCT Corrected Value
Updated Results
Batch Test Recleaner
Batch Test Interpreted
LCT Correction
LCT Corrected Value
ASX Announcement
Concentrate Grade
%Pb
g/t Ag
Recovery %
Pb
Ag
59.7
56.9
1003
956
73.7
75.2
3.0
72.9
74.3
3.8
56.9
966
78.2
78.1
62.3
59.5
846
815
78.3
72.4
73.8
3.8
77.6
59.5
826
3.0
82.8
Page 5
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
•
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
The DD core was logged at the temporary work site at Sorby Hills. The core
was geotechnically, geologically, structurally and mineralogically logged on
site and photographed.
The core logging was guided by separation geological intervals on the basis
of the state of oxidation, mineralogy, stratigraphy, depositional facies,
alteration, deformation and mineralisation so that informed geotechnical
and metallurgical domains could be segregated.
•
If core, whether cut or sawn and whether quarter, half or all core taken.
•
•
•
•
Drilling
techniques
•
Drill sample
recovery
•
•
•
Logging
•
•
Sub-sampling
techniques and
Commentary
ASX Announcement
•
The sampling of the metallurgical drill holes followed in 2 stages: First, ¼
core samples were collected for all intervals of mineralisation including a at
Page 6
Criteria
JORC Code explanation
sample
preparation
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
•
•
•
•
•
•
•
•
•
•
•
•
ASX Announcement
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their derivation,
etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
least 2 m of barren halos and submitted for analysis by ALS Laboratories,
Perth. Following the receipt of the ¼ results, composite sample intervals
were determined based on state of oxidation, host rock type, grade range
and sulphur deficiency estimation. The metallurgical samples were
composited using HQ size ½ cores. The composites ranged in length
between 3 – 6 m of true thickness and weighted between 20 and 30kg.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
The drill hole collars were placed in consideration of exiting metallurgical drill
holes and in order to achieve optimal special coverage across the deposit.
•
Not applicable to this release.
Page 7
Criteria
JORC Code explanation
Commentary
Sample
security
•
The measures taken to ensure sample security.
•
Not applicable to this release.
Audits or
reviews
•
The results of any audits or reviews of sampling techniques and data.
•
Not applicable to this release.
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.)
Criteria
JORC Code explanation
Mineral
Resource
estimate for
conversion to
Ore Reserves
•
Site visits
•
Study status
•
•
•
•
Cut-off
parameters
•
Mining factors
or assumptions
•
•
•
•
•
ASX Announcement
Commentary
Description of the Mineral Resource estimate used as a basis for the
conversion to an Ore Reserve.
Clear statement as to whether the Mineral Resources are reported additional
to, or inclusive of, the Ore Reserves.
•
Not applicable to this release.
Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.
If no site visits have been undertaken indicate why this is the case.
The type and level of study undertaken to enable Mineral Resources to be
converted to Ore Reserves.
The Code requires that a study to at least Pre-Feasibility Study level has been
undertaken to convert Mineral Resources to Ore Reserves. Such studies will
have been carried out and will have determined a mine plan that is
technically achievable and economically viable, and that material Modifying
Factors have been considered.
The basis of the cut-off grade(s) or quality parameters applied.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
The method and assumptions used as reported in the Pre-Feasibility or
Feasibility Study to convert the Mineral Resource to an Ore Reserve (i.e.
either by application of appropriate factors by optimisation or by preliminary
or detailed design).
The choice, nature and appropriateness of the selected mining method(s)
and other mining parameters including associated design issues such as
pre-strip, access, etc.
The assumptions made regarding geotechnical parameters (eg pit slopes,
stope sizes, etc), grade control and pre-production drilling.
The major assumptions made and Mineral Resource model used for pit and
stope optimisation (if appropriate).
The mining dilution factors used.
•
Not applicable to this release.
Page 8
Criteria
JORC Code explanation
•
•
•
Metallurgical
factors or
assumptions
•
•
•
•
•
•
•
Environmental
•
Infrastructure
•
Costs
•
•
•
•
•
•
Revenue
factors
•
•
•
ASX Announcement
The mining recovery factors used.
Any minimum mining widths used.
The manner in which Inferred Mineral Resources are utilised in mining
studies and the sensitivity of the outcome to their inclusion.
The infrastructure requirements of the selected mining methods.
The metallurgical process proposed and the appropriateness of that process
to the style of mineralisation.
Whether the metallurgical process is well-tested technology or novel in
nature.
The nature, amount and representativeness of metallurgical test work
undertaken, the nature of the metallurgical domaining applied and the
corresponding metallurgical recovery factors applied.
Any assumptions or allowances made for deleterious elements.
The existence of any bulk sample or pilot scale test work and the degree to
which such samples are considered representative of the orebody as a
whole.
For minerals that are defined by a specification, has the ore reserve
estimation been based on the appropriate mineralogy to meet the
specifications?
The status of studies of potential environmental impacts of the mining and
processing operation. Details of waste rock characterisation and the
consideration of potential sites, status of design options considered and,
where applicable, the status of approvals for process residue storage and
waste dumps should be reported.
The existence of appropriate infrastructure: availability of land for plant
development, power, water, transportation (particularly for bulk
commodities), labour, accommodation; or the ease with which the
infrastructure can be provided, or accessed.
The derivation of, or assumptions made, regarding projected capital costs in
the study.
The methodology used to estimate operating costs.
Allowances made for the content of deleterious elements.
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment and refining charges,
penalties for failure to meet specification, etc.
The allowances made for royalties payable, both Government and private.
The derivation of, or assumptions made regarding revenue factors including
head grade, metal or commodity price(s) exchange rates, transportation and
treatment charges, penalties, net smelter returns, etc.
The derivation of assumptions made of metal or commodity price(s), for the
principal metals, minerals and co-products.
Commentary
•
•
•
•
Froth flotation, standard practice for lead sulphide ores. Tested via bench
flotation tests.
A total of 21 spatially representative “Norton Fresh Ore” samples tested, with
an overall average performance calculated taking account of the individual
sample drill interval lengths, head grade, concentrate grade and metal
recovery.
Batch flotation test results corrected to represent closed circuit plant
performance by reference to a standard ore locked cycle test.
No metallurgical domaining applied across “Norton Fresh Ore” for this
interim performance assessment. Ore domaining is expected to be applied
in the final assessment.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
Page 9
Criteria
JORC Code explanation
Market
assessment
•
•
•
•
Economic
•
•
Social
•
Other
•
•
•
•
Classification
•
•
•
Audits or
reviews
•
Discussion of
relative
accuracy/
confidence
•
ASX Announcement
Commentary
The demand, supply and stock situation for the particular commodity,
consumption trends and factors likely to affect supply and demand into the
future.
A customer and competitor analysis along with the identification of likely
market windows for the product.
Price and volume forecasts and the basis for these forecasts.
For industrial minerals the customer specification, testing and acceptance
requirements prior to a supply contract.
The inputs to the economic analysis to produce the net present value (NPV)
in the study, the source and confidence of these economic inputs including
estimated inflation, discount rate, etc.
NPV ranges and sensitivity to variations in the significant assumptions and
inputs.
The status of agreements with key stakeholders and matters leading to
social licence to operate.
To the extent relevant, the impact of the following on the project and/or on
the estimation and classification of the Ore Reserves:
Any identified material naturally occurring risks.
The status of material legal agreements and marketing arrangements.
The status of governmental agreements and approvals critical to the viability
of the project, such as mineral tenement status, and government and
statutory approvals. There must be reasonable grounds to expect that all
necessary Government approvals will be received within the timeframes
anticipated in the Pre-Feasibility or Feasibility study. Highlight and discuss
the materiality of any unresolved matter that is dependent on a third party
on which extraction of the reserve is contingent.
The basis for the classification of the Ore Reserves into varying confidence
categories.
Whether the result appropriately reflects the Competent Person’s view of the
deposit.
The proportion of Probable Ore Reserves that have been derived from
Measured Mineral Resources (if any).
The results of any audits or reviews of Ore Reserve estimates.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
•
Not applicable to this release.
Where appropriate a statement of the relative accuracy and confidence level
in the Ore Reserve estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative accuracy of the
reserve within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors which could
affect the relative accuracy and confidence of the estimate.
•
Not applicable to this release.
Page 10
Criteria
JORC Code explanation
•
•
•
ASX Announcement
Commentary
The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.
Accuracy and confidence discussions should extend to specific discussions of
any applied Modifying Factors that may have a material impact on Ore
Reserve viability, or for which there are remaining areas of uncertainty at the
current study stage.
It is recognised that this may not be possible or appropriate in all
circumstances. These statements of relative accuracy and confidence of the
estimate should be compared with production data, where available.
Page 11