AGM Presentation
Released
Released
Announcement PDF
A near-term producer in Australia with a margin
highly leveraged to the Silver Price
2024 Annual General Meeting Presentation
26 November 2024
ASX: BML
boabmetals.com
Delivering metals for a sustainable future
2
Disclaimer
Forward-Looking Statements
Compliance Statement
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning,
among other things, future operating and exploration results or the Company’s future
performance. These forward-looking statements speak, and the presentation generally
speaks, only at the date hereof. The projections, estimates and beliefs contained in such
forward-looking statements necessarily involve known and unknown risks and
uncertainties, and are necessarily based on assumptions, which may cause the
Company’s actual performance and results in future periods to differ materially from
any express or implied estimates or projections.
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and
guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources
and Ore Reserves.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly
available sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise
a prospectus, product disclosure statement or other offering document under
Australian law. The presentation does not constitute or form part of any invitation, offer
for sale or subscription or any solicitation for any offer to buy or subscribe for any shares
in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the
time of preparation. No representation or warranty, express or implied is made as to the
fairness, accuracy or completeness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Boab Metals
Limited, its related bodies corporate and the officers, directors, employees, advisers and
agents of those entities do not accept any responsibility or liability for any loss arising
from the use of the presentation or its contents or otherwise arising in connection with
it.
Information included in this presentation relating to Mineral Resources has been
extracted from the Mineral Resource Estimate dated 17 December 2021, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Mineral
Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets
and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility
Study and FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning
the estimates, production targets and financial forecasts continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
Ore Reserves Statement.
3
2024 Year in Review
Progress toward a Final Investment Decision at Sorby Hills
✓ Completion of a Front-End Engineering &
Design Study (“FEED Study”) delivering
improved project economics1.
✓ Agreement to acquire 100% of Sorby Hills
upon Final Investment Decision2.
✓ Opportunity to acquire DeGrussa Process
Plant and significantly reduce project Capex3.
11% - FEED vs DFS NPV
Based on the same macroeconomic assumptions
Past 12 Months
10% - Boab Share Price1
30% - Median ASX Materials2
9% - Lead Price1
34% - Silver Price1
1.
2.
3.
ASX Release 6 June 2024
ASX Release 23 September 2024
ASX Release 25 October 2024
Boab Metals Limited ASX:BML
1. Bloomberg: Bloomberg: 26 November 2023 – 25 November 2024
2. www.marketindex.com.au 25 November 2024
3
4
Sorby Hills Project
FEED Study completed June 2024
FEED Study Highlights
A$264m preproduction Capex
underpinned 75%
by tendered
pricing
C1 cash cost
US$0.36/lb payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
Average Annual Production
103kt Lead-Silver concentrate
64kt Lead and 2.0Moz Silver
NPV8 A$411m
IRR 37%
Strong pre-tax
economics
1.
2.
2.25Mtpa
8.5 Year
Mine Life
A$1.1bn Operating Cash Flow
A$126m p.a. Average EBITDA
See Appendix for Revenue Assumptions
See Appendix for Annual Physical and Cash flow summary together with Capital and Operating Cost breakdowns
Boab Metals Limited ASX: BML
Lead
546 thousand payable tonnes
A$1,803 Million Revenue
Silver
17.2 million payable ounces
A$693 Million Revenue
5
Sorby Hills Project
Project Sensitivities
Macroeconomics
1,000
As at 25 November 2024
900
800
• Lead: US$2,022/t
• Silver: US$30.6/oz
• FX: 0.65 AUD:USD
• Spot Lead TC: US$30/t1
Project NPV8
700
600
500
400
NPV8 = A$493m
300
200
100
-30% -25% -20% -15% -10%
Lead
Silver
-5%
FX
0%
5%
Lead TC
10%
15%
Opex
20% 25%
30%
1. Source: What do the record low base metal concs TCs have in
common? – Fastmarkets 28 June 2024
Capex
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t, Ag: US$27.4/oz, FX: 0.68, Lead TC: US$125/t
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
5
6
Sorby Hills Project
Agreement to acquire 100% Interest
Terms of the Agreement
+218kt Concentrate
12-month option for Boab to acquire remaining 25% interest
in Sorby Hills existing JV partner.
+137kt Payable Lead
Full control over joint venture budgets and work programs
during the Option Period.
+4.3Moz Payable Silver
Should the Option be exercised, Boab will pay:
+A$103M NPV
•
Tranche 1: A$12.5M upon reaching a Final
Investment Decision at Sorby Hills
Attributable to Boab based on
the Sorby Hills FEED Study
•
Tranche 2: A$5.5M payable within 12 months
following first concentrate production; and
ASX Release 6 June 2024
•
Tranche 3: A$5.0M payable within 18 months
following first concentrate production.
Importantly, the option agreement requires no immediate
payment and provides a new basis on which to engage
potential Offtakers and Financiers.
Boab Metals Limited ASX: BML
7
Sorby Hills Project
Capital Cost Reduction Initiative
Boab is assessing multiple opportunities to reduce
the capital expenditure for Sorby Hills.
Potential purchase of the DeGrussa Process Plant
from Sandfire Resources has been identified as highly
prospective and fit-for-purpose opportunity.
Currently located 900km northeast of Perth
Part of the world-class DeGrussa Copper mine that
was built and operated by Sandfire between 2011-2023
Boab is working with EPC Contractor GR Engineering
Service (“GRES”) to undertake a thorough review of the
plant and assess the technical and economic benefit
of its incorporation into the Sorby Hills Project.
Should an acquisition proceed, it has the potential
to materially reduce project capital costs and
shorten project construction time frames.
Boab Metals Limited ASX: BML
Figure: Recent site Visit to the DeGrussa Process Plant
8
Boab Metals
Corporate Summary
Share Price History
10
Capital Structure (25 November 2024)
8
Debt
Nil
Cash
A$3.9 million1
0.20
7
6
0.15
5
4
0.10
3
2
Market Cap
A$30 million
Performance Rights
7,600,000
Share Price (A$/sh)
Shares on Issue
233 million shares
9
Volume (M Sahres)
Share Price
A$0.13 /share
0.25
0.05
1
0
0.00
Top 5 Shareholders
#
Holder Name
1
Villiers Queensland PL
7.82%
2
Zero Nominees Pty Ltd
4.11%
3
Citicorp Nominees Pty Limited
3.33%
4
Acuity Capital Investment
3.33%
5
BNP Paribas Nominees Pty Ltd
2.21%
24 October 2024
1. $4.8m At the market (ATM) Facility available for use at the company’s absolute discretion
Volume
Price
• ASX-listed base and
precious metals
developer and explorer.
• Board & Management
team with a proven track
record in development.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Top 20 shareholders hold
35% of issued capital.
9
Sorby Hills Project
Final Investment Decision Milestones
✓ Completed Project FEED Study
✓ Secured option to acquire 100% of the Project
✓ Identified material capital reduction opportunity
•
Q4/2024: Secure cornerstone Offtake and Financing
•
Q1/2025: Complete due diligence on the potential
acquisition of the DeGrussa Process Plant and incorporate
the results into a project execution plan and financial
model for comparison with a new process plant build.
•
Through H1 2025:
•
•
Secure additional non-dilutive debt finance
support funding of the Sorby Hills project; and
•
Finalise regulatory approvals required to commence
construction at Sorby Hills
Mid 2025: Final Investment Decision
Boab Metals Limited ASX: BML
to
Recent achievements
provide Boab with
significant momentum
heading into 2025 and
a refreshed pathway to
a Final Investment
Decision
10
Thank You
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Boab Metals Limited ASX:BML
10
11
Appendix
Appendix
Boab Metals Limited ASX:BML
11
12
Board and
Technical Team
Gary Comb
Board and Management
with a proven track
record in exploration and
development
Technical Team
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
Simon Noon
Richard Monti
Andrew Parker
Chairman
Managing Director
and CEO
Non-Exec. Director
Non-Exec. Director
Engineer with over 30
years’ experience in the
Australian mining
industry, with a strong
track record in
successfully
commissioning and
operating base metal
mines.
Experienced mining
executive with a strong
background in
management, capital
raising and operating
JV’s with mid to top tier
miners in a variety of
commodities.
Geologist with over 30
years’ experience in
technical, commercial,
marketing and finance
within the exploration
and mining industry.
Lawyer with significant
experience in the
exploration and mining
industry. Wealth of
expertise in corporate
advisory, strategic
consultancy and raising
capital.
Bill Darcey – Project Manager
Simon Dorling - Exploration Manager
Mining professional with over 40 years of experience and a proven Geologist with more than 26 years’ experience in exploration,
track record of successfully managing, optimising, and developing development and the mining of base metals, precious metals,
mining operations. Bill was previously Operations Manager at the Mt energy minerals and industrial minerals.
Garnet copper-lead-zinc operation, where he oversaw the successful
start-up and management of an 800,000 TPA zinc-lead operation in
China. Bill holds degrees in both mining engineering and metallurgy.
12
13
Sorby Hills Project
High Quality Resource Estimate
Deposit
Tonnes
(Mt)
Grade
Contained Metal
Pb
%
Zn
%
Ag
g/t
PbEq1
%
Pb
kt
Zn
kt
Ag
koz
A
0.6
5.3%
0.1%
23
6.1%
31
6
427
B
2.7
3.6%
0.3%
20
4.3%
97
8
1,720
Omega
17.2
3.3%
0.4%
34
4.5%
566
71
18,948
Norton
21.1
2.8%
0.4%
34
4.0%
590
96
24,090
Alpha
1.5
3.1%
0.9%
64
5.3%
45
13
2,975
Beta
4.2
3.6%
0.4%
43
5.1%
151
17
5,856
Measured
12.6
3.5%
0.4%
43
5.0%
444
45
17,521
Indicated
11.0
3.4%
0.4%
34
4.6%
377
46
12,114
Inferred
23.6
2.7%
0.5%
31
3.8%
645
117
23,406
Total
47.3
3.1%
0.4%
35
4.3%
1,465
207
53,042
See ASX announcement 17 December 2021
1. See Appendix for Lead & Silver Equivalent calculation method
Figure: Location of the Sorby Hills Resources
A different perspective - 47.3Mt @ 123g/t Silver Equivalent
14
Sorby Hills Project
Low Risk Open Pit Ore Reserve
FEED Study Production Target
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A
4.1
3.7
0.5
3.7
16.4
4.3%
8.1
Pit B
14.8
12.6
2.3
3.2
17.4
3.8%
5.5
Omega South
21.1
18.3
2.8
2.9
29.5
3.9%
6.5
Omega Main
57.7
50.3
7.4
3.6
38.7
5.0%
6.8
Norton
21.4
19.5
1.9
4.0
78.5
6.8%
10.0
Beta
35.6
32.2
3.4
3.3
41.5
4.8%
9.5
Total Production
154.8
136.5
18.3
3.4
38.8
4.8%
7.5
Ore Reserve
Category
Ore
(Mt)
Proved
Grade
Contained Metal
Pb (%)
Ag (g/t)
Pb (kt)
Ag (Moz)
10.4
3.5%
42
358
14.1
Probable
4.9
3.5%
32
172
5.0
Total Ore Reserve
15.2
3.5%
39
531
19.1
See ASX announcement 19 January 2023
Production Target
underpinned 83% by
Measured and Indicated
Resources.
17%
1. See Appendix for Lead Equivalent calculation method
Ore Reserve Statement
Boab Metals Limited ASX: BML
Figure: DFS pit shells with respect to the Resource block model
26%
57%
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
Measured
Indicated
Inferred
15
Sorby Hills Feed Study
Life of Mine Physicals
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
18.3
-
0.4
2.1
2.3
2.4
2.5
2.3
2.0
1.1
3.0
0.3
-
Mt
134.6
-
3.8
11.7
14.3
25.7
25.4
21.0
17.3
13.0
4.2
0.2
-
% Measured
%
56.7%
-
67.3%
91.7%
64.7%
72.0%
89.7%
71.8%
47.7%
16.6%
-
-
-
% Indicated
%
26.5%
-
32.7%
8.3%
35.3%
27.2%
8.9%
26.7%
49.7%
30.6%
31.1%
-
-
% Inferred
%
16.8%
-
-
-
-
0.9%
1.4%
1.5%
2.7%
52.8%
68.9%
100.0%
-
Lead Grade
%
3.4%
-
3.8%
4.1%
3.2%
3.8%
3.3%
3.1%
3.1%
3.6%
3.4%
2.9%
-
Silver Grade
g/t
39
-
24
39
28
60
50
22
27
42
41
50
-
Processed Tonnes
Mt
18.3
-
-
1.39
2.25
2.26
2.25
2.25
2.25
2.26
2.25
1.11
-
Lead Grade
%
3.4%
-
-
5.5%
3.4%
4.0%
3.5%
3.1%
3.0%
2.5%
3.5%
3.0%
-
Silver Grade
g/t
39
-
-
47
30
59
54
24
27
30
41
41
-
Lead Recovery
%
91.6%
-
-
90.9%
94.1%
90.0%
88.0%
92.7%
94.7%
93.8%
90.3%
90.3%
-
Silver Recovery
%
81.7%
-
-
87.2%
86.2%
82.2%
81.4%
86.9%
86.9%
85.7%
70.4%
70.3%
-
Concentrate Produced
kt
873
-
-
109
110
126
112
99
98
80
97
42
-
Lead Grade
%
65.8%
-
-
64.2%
65.6%
63.5%
62.4%
65.9%
66.0%
65.7%
72.2%
72.3%
-
Silver Grade
g/t
664
-
-
529
532
860
878
479
535
730
677
770
-
Payable Lead
kt
546
-
-
61
69
79
65
63
63
50
68
30
-
Payable Silver
Moz
17.2
-
-
1.5
1.7
3.2
3.0
1.4
1.5
1.8
2.0
1.0
-
PHYSICALS SUMMARY
Unit
Total
ROM Mined
Mt
Waste Mined
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
15
16
Sorby Hills Feed Study
Life of Mine Cashflows
FINACIAL SUMMARY
Unit
Total
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
Lead Revenue
A$M
1,803
-
-
198
225
260
215
207
208
165
226
98
1,803
Silver Revenue
A$M
693
-
-
59
69
131
121
57
62
71
82
40
693
Total Revenue
A$M
2,496
-
-
257
295
392
337
264
269
236
308
138
-
TR/RCs
A$M
(191)
-
-
(21)
(23)
(30)
(26)
(21)
(21)
(18)
(22)
(10)
-
Royalties
A$M
(95)
-
-
(10)
(11)
(14)
(12)
(10)
(10)
(9)
(12)
(5)
-
Net Revenue
A$M
2,209
-
-
227
260
347
299
233
238
210
274
123
-
Logistics
A$M
(117)
-
-
(14)
(15)
(17)
(15)
(13)
(13)
(11)
(13)
(6)
-
Mining
A$M
(547)
-
-
(51)
(62)
(94)
(93)
(81)
(71)
(54)
(36)
(4)
-
Processing
A$M
(388)
-
-
(38)
(47)
(47)
(47)
(47)
(47)
(47)
(47)
(24)
-
G&A
A$M
(88)
-
-
(10)
(10)
(10)
(10)
(10)
(10)
(10)
(10)
(5)
-
Operating Cash Flow
A$M
1,069
-
-
114
126
180
134
81
96
88
167
84
-
Pre-production Capex
A$M
(264)
(131)
(133)
-
-
-
-
-
-
-
-
-
-
Sustaining Capex
A$M
(26)
-
-
(12)
(1)
(3)
(1)
(0)
-
-
-
(5)
(4)
Project Cash Flows
A$M
778
(131)
(133)
101
125
177
133
81
96
88
167
78
(4)
NPV8
A$M
411
IRR
%
37
A$M
126
Average EBITDA
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
16
17
Sorby Hills Project
Continuing to Deliver Silver Exposure
to Investors
▪ Since the acquisition of the
Sorby Hills Project in June
2018, Boab’s share price has
exhibited a strong
correlation with movements
in the price of Silver.
Rolling 30-day average daily % changes in USD Silver price & BML share price since June 2018
2.00%
USD Silver 30-day
Avg Daily % Change
6.00%
30 Day Average Dailty Return
4.00%
2.00%
-6.00%
-4.00%
1.50%
1.00%
0.50%
0.00%
-2.00%
0.00%
2.00%
4.00%
6.00%
0.00%
-0.50%
-1.00%
-2.00%
-1.50%
-4.00%
Jun-18
Dec-18
Jun-19
Dec-19
Jun-20
Dec-20
BML
Boab Metals Limited ASX: BML
Jun-21
Dec-21
Silver
Jun-22
Dec-22
Jun-23
Dec-23
Jun-24
-2.00%
BML 30-day Avg
Daily % Change
▪ Significant positive
movements in Silver price
correspond to significant
positive movements in the
Boab share price
18
Sorby Hills Project
Exposure to Silver Price
Operating Costs covered by a historically non-volatile
Lead Price leaves the Operating margin fully leveraged
to Silver price movements.
2.0
Viewed differently, the Sorby
Hills Project may be considered
a low-cost silver producer
US$/oz
US$/lb
Increasing Silver Price
50
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
1.0
38% Margin
Sorby Hills AISC
ex-Silver Credits
US$0.81/lb Pb
0
Project Costs
Sorby Hills Net
Silver Credits*
US$0.37/lb Pb
AISC = negative US$14/oz Ag
Sorby Hills
Net Lead “Credits”
US$65/oz Ag
0
10-Year average
Lead Price
US$0.93/lb Pb
AISC = negative US$14/oz Ag
-50
Project Revenue
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
*Based on FEED Study Price of US$27/oz Ag
Sorby Hills – A low-cost Silver Producer?
AISC = All in Sustaining Cost or “Breakeven” cost
1 As at 5 August 2024
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
18
19
Sorby Hills FEED Study
Capital Cost Breakdown
Total upfront capital cost of A$264M
including A$22.7M contingency
~66% of capital costs underpinned by
tendered pricing, including an updated
Process Plant EPC pricing following the
completion of Front-End Engineering &
Design by GRES.
A$32M Owner Costs including
operational readiness items such as
critical spares and owner’s team
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract
134.9
-
134.9
Site Ests/ Bulk Earthworks
31.9
4.9
36.9
Water Management
8.1
11.7
19.8
Accommodation Village
11.5
-
11.5
Other Infrastructure
8.5
0.6
9.1
Owners Costs
32.0
-
32.0
Contingency
22.7
-
22.7
Pre-Production Opex
15.0
-
15.0
-
9.3
9.3
264.5
26.5
290.9
Item
Closure Costs
Total Capital Costs
Opportunities being explored to
further reduce upfront capital costs
and project implementation risk.
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
19
20
Sorby Hills FEED Study
Operating Cost Breakdown
Competitive C1 cash cost of US$0.36/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Unit Costs
Total
(A$M)
A$/t ore
US$/lb payable Pb
Logistics
117
6.4
0.07
Mining
547
30.0
0.31
Processing
388
21.3
0.22
G&A
88
4.8
0.05
Lead Treatment
160
8.8
0.09
C1 Costs (ex-Credits)
1,300
71.2
0.74
Net Silver Credits
(661)
(36.2)
(0.37)
C1 Costs
639
35.0
0.36
Royalties
95
5.2
0.05
Sustaining Capital
26
1.4
0.01
AISC
760
41.6
0.43
Item
Unit Operating Costs based on 18.3Mt of Ore, 546kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Boab Metals
Limited ASX:BML
Boab Metals Limited
ASX: BML
20
21
Boab Metals
Establishing Deep Roots within the Local Community
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster for
2023 and beyond.
•
Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
•
The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
•
Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
21
22
Metal Equivalent
Calculations
The contained metal equivalence formula is
based on the Sorby Hills FEED Study including:
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
• Lead Price US$2,253/t; and
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
• Silver Price US$27.4/oz.
Pb
Ag
Lead Equivalent Calculations
where R is the respective metallurgical metal recovery rate, S is the respective smelter return
rate, V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary metal (pri).
• Silver recovery of 82% (weighted
average of oxide and fresh Ag
recoveries); and
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the DFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
• Silver Payability rate of 95%.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
Feed Study Macroeconomic Assumptions
Silver Equivalent Calculations
• Lead recovery of 91% (weighted
average of oxide and fresh Pb
recoveries); and
• Lead Payability rate of 95%.
Boab Metals Limited ASX: BML
Assumption
Unit
2025
2026
2027
2028
2029+
Lead Price
US$/t
2,259
2,268
2,269
2,254
2,251
Silver Price
US$/oz
24.8
25.8
26.4
27.3
27.5
Exchange Rate
A$:US$
0.70
0.70
0.70
0.69
0.68
22
Share your feedback
Discover