Corporate Presentation
Released
Released
Announcement PDF
Sorby Hills Project
US$40/oz
Lead Pays,, Silver Plays
US$35/oz
US$30/oz
US$25/oz
September 2025
Corporate Presentation
boabmetals.com.au
2
Disclaimer
Forward-Looking Statements
Compliance Statement
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning,
among other things, future operating and exploration results or the Company’s future
performance. These forward-looking statements speak, and the presentation generally
speaks, only at the date hereof. The projections, estimates and beliefs contained in such
forward-looking statements necessarily involve known and unknown risks and
uncertainties, and are necessarily based on assumptions, which may cause the
Company’s actual performance and results in future periods to differ materially from any
express or implied estimates or projections.
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and
guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources
and Ore Reserves.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly
available sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian
law. The presentation does not constitute or form part of any invitation, offer for sale or
subscription or any solicitation for any offer to buy or subscribe for any shares in Boab
Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the
time of preparation. No representation or warranty, express or implied is made as to the
fairness, accuracy or completeness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Boab Metals
Limited, its related bodies corporate and the officers, directors, employees, advisers and
agents of those entities do not accept any responsibility or liability for any loss arising
from the use of the presentation or its contents or otherwise arising in connection with it.
Boab Metals Limited ASX: BML
Information included in this presentation relating to Mineral Resources has been
extracted from the Mineral Resource Estimate dated 17 December 2021, available to view
at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Mineral
Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets
and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility
Study and FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning
the estimates, production targets and financial forecasts continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been
extracted from the ASX Announcements titled “KEEP confirmed as a Target for Further
Exploration” dated 22 October 2024, “Significant Intercepts at Sorby Hills” dated 8
November 2023, “Amended Drilling Announcement” dated 4 September 2023”, “Assays
Confirm Further Positive Outcome for Sorby” dated 23 January 2023, “High-Grade LeadSilver Confirmed at Beta Deposit” dated 1 February 2022 available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in these
announcements. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
form in which they were first presented.
2
3
Boab Metals
Investment Thesis
The Sorby Hills Project provides investors development ready exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
SILVER SNAPSHOT: THE CROSSROADS OF INDUSTRY AND INVESTMENT
✓
Industrial demand: Unmatched conductivity make silver critical for solar
panels, EV electronic and central to the global energy transition.
✓
Supply squeeze: With primary mine output declining, most silver now
coming only as a by-product, and recycling stuck at ~20%, supply cannot
keep pace - entrenching a structural deficit.
1,164Moz Demand in 2024
• 58% Industrial Demand
• 23% Jewellery & Silverware
• 16% Coins and Bars
✓
Value storage & safe-haven: As a monetary metal, silver is a store of
value, moving with gold during inflationary or geopolitical uncertainty.
1,015Moz Supply in 2024
• 22% Primary Silver Mines
• 58% as a by-product metal
• 19% Recycled Silver
✓
Speculative kicker: gold–silver ratio, investor flows to silver EFTs, and
leveraged futures trading all leading to amplified volatility — giving
silver greater upside torque in bull markets.
Added to the U.S Government
draft Critical Minerals List
(August 25)
Source: Silver Institute 2025 Survey
Boab Metals Limited ASX: BML
3
4
Boab Metals
Investment Thesis
The Sorby Hills Project provides investors development ready exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
LEAD SNAPSHOT: THE ORIGINAL BATTERY METAL
✓
Enduring Demand: A lead-acid battery is typically replaced two to three
times in a Light Vehicle's average lifetime of around 12 years supporting a
demand tail that will stretch decades.
✓
Indian Lead Demand: Indian consumption of refined lead is forecast to
grow 5% YOY through to 2030.
✓
Silver Lining: High demand for silver bearing lead concentrates is
delivering record low Concentrate Treatment Charges (negative US$65/t)
✓
Price Stability: A mature secondary market provides a buffer against price
shocks, limiting the Lead price to a relative tight and predictable range.
13,185kt Demand in 2024
• 41% Replacement batteries
• 13% New batteries
• 34% Industrial batteries
• 12% Non-battery uses
13,141kt Supply in 2024
• 32% Primary Lead
• 68% Recycled Lead
Market to remain tight as
growth in production slows by
more than in consumption
Source: CRU 2023-2025
Boab Metals Limited ASX: BML
4
5
Sorby Hills Project
Cost structure delivering “free Silver”
Operating Costs covered by a non-volatile Lead Price
Operating margin fully leveraged to Silver price movements.
US$/oz Ag
US$/lb Pb
2.0
Increasing Silver Price
47% Margin
1.0
Sorby Hills FEED
Study AISC
ex-Silver Credits
US$0.81/lb Pb
0
Project Costs
Sorby Hills Net
Silver Credits*
US$0.58/lb Pb
10-Year average
Lead Price1
US$0.94/lb Pb
50
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
+1 Std
AISC = negative US$14/oz Ag
Sorby Hills
Net Lead “Credits”
US$65/oz Ag
0
-1 Std
AISC = negative US$14/oz Ag
+/-US$0.10/lb Pb
standard deviation
-50
Project Revenue
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
*Based on Spot Price of US$41/oz Ag
Viewed differently, the Sorby
Hills Project may be considered
a low-cost silver producer
Sorby Hills – A low-cost Silver Producer?
AISC = All in Sustaining Cost or “Breakeven” cost
1 As at 12 September 2025
Boab Metals Limited ASX: BML
5
6
Sorby Hills Project
Delivering leveraged Silver exposure
to Boab’s Investors
Rolling 30-day average daily % changes in USD Silver price & BML share price
4.00%
30 Day Average Daily Return
▪ Since the acquisition of the
Sorby Hills Project in June
2018, Boab’s share price has
exhibited a strong
correlation with movements
in the price of Silver.
2.00%
USD Silver 30-day
Avg Daily % Change
6.00%
2.00%
1.50%
1.00%
0.50%
0.00%
-6.00% -4.00% -2.00% 0.00%
0.00%
-0.50%
2.00%
4.00%
6.00%
BML 30-day Avg
Daily % Change
▪ Significant positive
movements in Silver price
correspond to leveraged
positive movements in the
Boab share price
-1.00%
-2.00%
-1.50%
-4.00%
Oct-18
Oct-19
Oct-20
Oct-21
ASX:BML
Boab Metals Limited ASX: BML
Oct-22
Oct-23
Oct-24
Oct-25
-2.00%
US$ Silver
6
7
Sorby Hills Project
Development Ready
•
Tier-1 Jurisdiction, Located 50km northeast of Kununurra,
Western Australia, sealed road to Wyndham Port (150 km)
•
Large scale and well defined 47.3Mt Silver-Lead Resource
(123g/t AgEq)1 including 53Moz contained Silver
•
DFS & FEED Studies Complete for stage 1 Operations NPV8
A$705M and IRR >53% at current macroeconomics2
•
High-Quality Processing Plant secured from Sandfire
Resources DeGrussa project for use at Sorby Hills
•
All significant Environmental Approvals received
•
Forecast annual Silver production of ~2.2Moz, positioning
Sorby Hills among the top silver producers in Australia
•
Exceptional Silver Exposure – Operating costs covered by
lead revenue delivering an AISC negative US$14/oz Ag
•
Strong Financing & Partnerships – Trafigura offtake
agreement in place with US$30M prepayment. Advanced
discussions with debt financiers progressing
•
Targeting a Final Investment Decision (“FID”) Q4 2025
•
Significant Growth & Exploration Upside – Resource
expansion and Mine life extension at Sorby Hills in addition
to 100% owned regional strategic projects
Figure: Location of the Sorby Hills Project
1.
2.
Boab Metals Limited ASX: BML
See Appendix for Resource breakdown and Metal
Equivalent Assumptions
See Slide 4 for current macroeconomic assumptions
7
8
Sorby Hills Project
Front-End Engineering & Design
FEED Study Highlights
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
Average Annualised Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
NPV8 A$411M
IRR 37%
Strong pre-tax
economics
2.25Mtpa
Initial 8.5 Year
Mine Life
A$1.1B Operating Cash Flow
A$126M p.a. Average EBITDA
Spot Macroeconomics
As at 12 September 2025
• Lead: A$2,997/t
• Silver: A$63.1/oz
• FX: 0.66 AUD:USD
• Spot Lead TC: minus US$65/t1
NPV8 = A$705M
IRR = 53%
1. Average of Spot TCs published by CRU and WoodMac for May 2025
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
Boab Metals Limited ASX: BML
8
Sorby Hills Project
A head start on project delivery
Acquisition of the DeGrussa Processing Plant from Sandfire Resources
significantly reduces and derisks project execution timeline
10
Sorby Hills Project
A standout investment among peers
Project
Sorby Hills
Bowdens
Wonawinta
Paris
Jervois
Location
Western Australia
New South Wales
New South Wales
South Australia
Northern Territory
Company
Boab Metals
Silver Mines
Manuka Resources
Investigator Resources
KGL Resources
ASX: BML
ASX: SVL
ASX: MKR
ASX: IVR
ASX: KGL
A$78M
A$314M
A$36M
A$52M
A$111M
Resource
47.3Mt @ 35g/t Ag,
3.1% Pb, 0.4%Zn
(123g/t AgEq.)
179Mt @ 31g/t Ag,
0.4% Zn, 0.3%Pb
(58g/t AgEq.)
38.5Mt @
41g/t Ag, 0.5%Pb
24Mt @
73g/t Ag 0.4% Pb
29.0Mt @ 25g/t Ag,
1.8% Cu, 0.2g/t Au
Reserves
15.2Mt @ 39g/t Ag,
3.5%Pb
32.8Mt @ 68g/t Ag,
0.4%% Zn, 0.3%Pb
6.4Mt @ 57g/t Ag
Nil
14.4Mt @ 28g/t Ag,
1.8% Cu, 0.3g/t Au
Silver Reserves
19.1Moz
71.1Moz
11.6Moz
Nil
12.8Moz
Latest Study
FEED Study
(June 2024)
Optimised Feas. Study
(December 2024)
Restart Study
(May 2025)
Pre-Feasibility Study
(November 2021)
Feasibility Study Update
(February 2025)
Project Status
FID pending Finance
Progressing Approvals
Restart pending Finance
Undertaking DFS
FID pending Finance
Offtake Status
Awarded to Trafigura +
US$30M Prepay
Not yet awarded
Sales direct to Refinery
Sales direct to Refinery
Awarded to Glencore
Process Plant
2nd Hand Plant Acquired
Not yet built
Existing Processing Plant
Not yet built
Not yet built
Environmental
Approvals received
Development
Application pending
Approvals in place
Mining Lease
Application Pending
Approvals in place
Ticker
Market Cap
(12-Sep-25)
Approvals Status
See Appendix for supporting information and BML Metal Equivalent Calculations
Boab Metals Limited ASX: BML
10
11
Sorby Hills Project
Poised to be a Major Silver Producer
Sorby Hills Revenue Split
Forecast Sorby Hills silver production versus
established silver producers within Australia
A$2,997/t Pb and A$63.1/oz Ag
Asset
S32
Cannington
10,292
MMG
Rosebery
2,414
Boab Metals
Sorby Hills
2,191
Glencore
Mt Isa, George Fisher
2,189
MMG
Dugald River
1,853
Glencore
McArthur River
1,760
BHP
South Australia
913
29 Metals
Golden Grove
882
Evolution
All Assets
827
Boab Metals Limited ASX: BML
546kt Payable Lead
A$1.6B Revenue
Silver Production
(koz)*
Company
Avg annualised production
*Source FY24 and FY25 Annual Reports
List is not exhaustive
60%
40%
17.2Moz Payable Silver
A$1.1B Revenue
11
12
Sorby Hills Project
Progressing toward a Final Investment Decision
Recent achievements provide Boab with significant momentum heading into FID
2022 - 2023
2024 - 2025
✓ Completion of the Sorby Hills Definitive
Feasibility Study (“DFS”)1.
✓ Completion of a Front-End Engineering & Design Study
(“FEED Study”) delivering improved project economics1.
✓ Heads of Agreement to source power
from the Ord-River Hydroelectric
Plant executed with Horizon Power2.
✓ Executed Agreement to acquire 100% Sorby Hills upon
Final Investment Decision2.
✓ Port Access Agreement executed with
port operators Cambridge Gulf3.
✓ 178-person Accommodation Facility
acquired and relocated to site4.
1.
2.
3.
4.
ASX Release 19 January 2023
ASX Release 22 April 2022
ASX Release 31 March 2022
ASX Release 15 September 2022
Boab Metals Limited ASX: BML
✓ Executed Binding Offtake and US$30 Million
Prepayment Facility with Trafigura3.
✓ EPA Part IV and EBPC approvals recieved4,6.
✓ Executed Agreement to Purchase the DeGrussa
Processing Plant from Sandfire Resources5.
1.
2.
3.
4.
5.
6.
ASX Release 6 June 2024
ASX Release 23 September 2024
ASX Release 10 December 2024
ASX Release 23 December 2024
ASX Release 30 April 2025
ASX Release 3 September 2025
12
13
Sorby Hills Project
Project Financing
Positive Project progress has supported meaningful progress with financiers
• Boab have executed a US$30M Prepayment Facility
terms sheet with Trafigura1.
• Additionally, non-binding terms sheets2 have been
received from domestic and international financiers.
• Based on the terms sheets received, Boab is confident of
securing a financing solution for Sorby Hills that
achieves the level of gearing targeted by the Company.
• The Company is targeting FID in H2 2025.
1.
ASX Release 10 December 2024, Financial Close and drawdown of the Prepayment Facility are subject to, amongst other things, the
execution of definitive agreements, the finalisation of due diligence to Trafigura’s satisfaction and the Project being fully funded.
2.
Terms sheets are non-binding, discussions remain preliminary and there is no certainty that a binding agreement will be reached."
Boab Metals Limited ASX: BML
13
14
Sorby Hills Project
Acquisition of the DeGrussa Processing Plant
Derisking Project Execution from both a procurement and capital cost perspective
Acquisition Terms
Total price of A$10M, comprising:
•
Deposit paid: A$0.5M cash and A$1.0M shares
issued to Sandfire Resources
•
Tranche 1 Payment: A$6.0M paid upon
completion (incl. Final Investment Decision)
and funded from proceeds of the Sorby Hills
project construction financing.
•
Tranche 2 Payment: A$2.5M paid within 12
months of first sale of concentrate from the
Sorby Hills Project.
ASX Release 30 April 2025
Boab Metals Limited ASX: BML
14
15
Sorby Hills Project
DeGrussa Process Plant: An Ideal Fit
Primary Crusher
Crushed Ore Storage Bin
All major components for the
Sorby Hills Process Plant have
been secured via the DeGrussa
Process Plant acquisition
Flotation Circuit
SAG Mill
Concentrate
Thickening
& Filtration
Ball Mill
Tailings Thickener
Fit for purpose specifications to
deliver the targeted 2.25Mtpa
throughput with minimal changes
Extensive list of new spares
included in the acquisition.
Boab commenced a competitive
tender process to price the
relocation, reconstruction and
refurbishment during Q3 2025 with
tender completion expected Q4
2025
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES during FEED showing key components of the
design that have been secured via the acquisition of the DeGrussa Processing Plant.
Boab Metals Limited ASX: BML
15
16
Sorby Hills Project
High Quality Concentrate
Wyndham Port located just 150km from
Sorby Hills by existing sealed road.
Port Access Agreement executed with
port operators Cambridge Gulf
Concentrate to be transported from site
to Wyndham in sealed containers.
873kt of Concentrate shipped at an
average 103kt per annum.
•
Average 65.8% Lead.
•
Average 664 g/t Silver.
Highly competitive process including
global traders and smelters has
demonstrated the attractiveness of the
Sorby Hills concentrate product.
Boab Metals Limited ASX: BML
Figure: Loading at Wyndham Port
16
17
Sorby Hills Project
Offtake and Prepayment Agreement
Terms of the Agreement with Trafigura
Binding Prepayment Term Sheet
•
US$30M for the development and construction of Sorby Hills.
•
5 Year Term, 18 Month repayment grace period.
•
Interest Rate of Term SOFR + 5%.
•
Repaid via monthly instalments following the grace period.
Binding Offtake Agreement
•
75% of the lead-silver Concentrate produced at Sorby Hills.
•
Minimum Quantity of 531kt (~7 years based on the FEED Study).
•
Market standard metal pricing and metal payabilities.
•
Ability for Boab to scale back Offtake Percentage and
Minimum Quantity should the Prepayment Facility not
proceed or Boab’s sources alternative financing.
Attractive and flexible
offtake terms from
global commodities
trader Trafigura
US$30M Prepayment
represents a
cornerstone element of
targeted financing plan
for Sorby Hills.
ASX Release 10 December 2024
Boab Metals Limited ASX: BML
17
18
Sorby Hills Project
Agreement to acquire 100% Interest
Terms of the Agreement
12-month option for Boab to acquire remaining 25% interest in
Sorby Hills from existing JV partner.
Full control over joint venture budgets and work programs
during the Option Period.
Should the Option be exercised, Boab will pay:
Further Project value
attributable to Boab
upon acquisition
+218kt Concentrate
•
Tranche 1: A$12.5M upon reaching a Final Investment
Decision at Sorby Hills;
+137kt Payable Lead
•
Tranche 2: A$5.5M payable within 12 months following first
concentrate production; and
+4.3Moz Payable Silver
•
Tranche 3: A$5.0M payable within 18 months following first
concentrate production.
+A$103M NPV
Importantly, the Option Agreement requires no immediate
payment and provides a new basis on which to engage potential
financiers.
based on the Sorby Hills FEED Study - ASX
Release 6 June 2024
ASX Release 23 September 2024
Boab Metals Limited ASX: BML
18
19
Sorby Hills Project
Potential Share Price Catalysts
Q4 2025
• Complete competitive contract tender to
relocate, reconstruct and refurbish the
DeGrussa Processing Plant at Sorby Hills.
• Commencement of early site works.
• Secure additional non-dilutive debt finance to
support funding of the Sorby Hills Project.
• Finalise regulatory approvals required to
commence construction at Sorby Hills.
• Final Investment Decision at Sorby Hills.
• Potential mine life extensional drilling1
1 Subject to drilling approvals being received with sufficient time remaining to mobilise drilling rig and complete
the program before the seasonal wet weather arrives.
Boab Metals Limited ASX: BML
19
20
Board and
Project
Delivery Team
Board and Management
with a proven track
record in project
development
Gary Comb
Simon Noon
Richard Monti
Andrew Parker
Chairman
Managing Director & CEO
Non-Exec. Director
Non-Exec. Director
Engineer with over 30 years’
experience in the Australian
mining industry, with a strong
track record in successfully
commissioning and operating
base metal mines.
Experienced mining executive
with a strong background in
management, capital raising
and operating JV’s with mid to
top tier miners in a variety of
commodities.
Geologist with over 30 years’
experience in technical,
commercial, marketing and
finance within the exploration
and mining industry.
Lawyer with significant
experience in the exploration
and mining industry. Wealth of
expertise in corporate advisory,
strategic consultancy and
raising capital.
Russell Taylor
Project Director
Seasoned mining executive with over 28 years’ experience in the
development and operation of large-scale mining projects
across Australia and internationally. He has held senior executive
and project leadership roles with leading resources companies
including BHP, Peabody, Mineral Resources, Downer Mining,
and Thiess, as well as board positions with ASX-listed companies.
Boab Metals Limited ASX: BML
20
21
Boab Metals
Corporate Snapshot
Share Price History
9.0
Capital Structure (12 September 2025)
8.0
Share Price
A$0.28
7.0
0.30
Shares on Issue
279 million shares
Cash
A$7.2 million1
Market Cap
A$78 million
Performance Rights
7,600,000
6.0
5.0
0.15
4.0
3.0
#
Holder Name
1
Villiers Queensland PL
5.67%
2
Citicorp Nominees Pty Limited
4.84%
3
BNP Paribas Nominees Pty Ltd
4.00%
4
Zero Nominees Pty Ltd
3.44%
5
Sandfire Resources Ltd
2.98%
12 Sep 2025
0.10
2.0
0.05
1.0
0.0
Sep-24
Top 5 Shareholders
0.20
Share Price (A$/sh)
Debt
Nil
Volume (M Shares)
0.25
Dec-24
Mar-25
Volume
Jun-25
0.00
Sep-25
Share Price
• ASX-listed base and
precious metals
developer and explorer.
• Board & Management
team with a proven track
record in development.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Top 20 shareholders hold
36% of issued capital.
1. As at 11 September 2025. In addition to the $7.3m existing cash reserves the company has a $4.1m
At the market (ATM) Facility available for use at the company’s absolute discretion
Boab Metals Limited ASX: BML
21
22
Thank You
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
22
23
Appendix
Appendix
23
24
Sorby Hills Project
Manbarrum Zn-Pb-Ag Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the east
Kimberley Region
Figure:
Location of the
Manbarrum
Project, Eight
Mile Creek
Project and
Keep n-Pb
Target relative
to Sorby Hills.
▪
located 25km east of the Sorby Hills Project.
▪
175km2 of prospective tenements (including two
granted mining leases) covering geology related
to that found at Sorby Hills.
▪
Mineral Resources declared at two prospects
which are zinc and silver dominated.
▪
Conceptual open pit mining studies completed
by CSA Global in 2018.
Keep Zinc Lead Target
▪
New Zinc-Lead mineralisation recently discovered
via greenfield exploration within the existing Sorby
Hills mining leases.
▪
Ore grade intercepts include:
▪
SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb &
2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪
SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb &
5.86% Zn) and 36.7 g/t Ag from 303.0 m
Keep Zn-Pb Target
Eight Mile Creek
(Pb-Ag-Zn)
Eight Mile Creek Project
Boab Metals Limited ASX: BML
▪
30km of along-strike geology, highly prospective
for deposits similar to Sorby Hills.
▪
The exploration success based on seismic data at
the Keep Zinc-Lead Target has opened the door
for more bold exploration at Eight Mile Creek.
ASX Release 22 October 2024
24
25
Boab Metals
Establishing Deep Roots within the Local Community
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster
•
Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
•
The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
•
Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Boab Metals Limited ASX: BML
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
25
26
Sorby Hills Project
High Quality Resource
Deposit
Tonnes
(Mt)
Grade
Contained Metal
Pb
%
Zn
%
Ag
g/t
PbEq1
%
Pb
kt
Zn
kt
Ag
koz
A
0.6
5.3%
0.1%
23
6.1%
31
6
427
B
2.7
3.6%
0.3%
20
4.3%
97
8
1,720
Omega
17.2
3.3%
0.4%
34
4.5%
566
71
18,948
Norton
21.1
2.8%
0.4%
34
4.0%
590
96
24,090
Alpha
1.5
3.1%
0.9%
64
5.3%
45
13
2,975
Beta
4.2
3.6%
0.4%
43
5.1%
151
17
5,856
Measured
12.6
3.5%
0.4%
43
5.0%
444
45
17,521
Indicated
11.0
3.4%
0.4%
34
4.6%
377
46
12,114
Inferred
23.6
2.7%
0.5%
31
3.8%
645
117
23,406
Total
47.3
3.1%
0.4%
35
4.3%
1,465
207
53,042
See ASX announcement 17 December 2021
Figure: Location of the Sorby Hills Resources
1. See Appendix for Lead & Silver Equivalent calculation method
A different perspective - 47.3Mt @ 123g/t Silver Equivalent
Boab Metals Limited ASX: BML
26
27
Sorby Hills Project
Low Risk Open Pit Ore Reserve
FEED Study Production Target
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A
4.1
3.7
0.5
3.7
16.4
4.3%
8.1
Pit B
14.8
12.6
2.3
3.2
17.4
3.8%
5.5
Omega South
21.1
18.3
2.8
2.9
29.5
3.9%
6.5
Omega Main
57.7
50.3
7.4
3.6
38.7
5.0%
6.8
Norton
21.4
19.5
1.9
4.0
78.5
6.8%
10.0
Beta
35.6
32.2
3.4
3.3
41.5
4.8%
9.5
Total Production
154.8
136.5
18.3
3.4
38.8
4.8%
7.5
Figure: DFS pit shells with respect to the Resource block model
1. See Appendix for Lead Equivalent calculation method
Ore Reserve Statement
Ore Reserve
Category
Ore
(Mt)
Proved
Grade
Contained Metal
Pb (%)
Ag (g/t)
Pb (kt)
Ag (Moz)
10.4
3.5%
42
358
14.1
Probable
4.9
3.5%
32
172
5.0
Total Ore Reserve
15.2
3.5%
39
531
19.1
Production Target
underpinned 83% by
Measured and Indicated
Resources.
17%
26%
57%
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
Measured
Indicated
Inferred
See ASX announcement 19 January 2023
Boab Metals Limited ASX: BML
27
28
Sorby Hills Feed Study
Life of Mine Physicals
PHYSICALS SUMMARY
Unit
Total
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
ROM Mined
Mt
18.3
-
0.4
2.1
2.3
2.4
2.5
2.3
2.0
1.1
3.0
0.3
-
Waste Mined
Mt
134.6
-
3.8
11.7
14.3
25.7
25.4
21.0
17.3
13.0
4.2
0.2
-
% Measured
%
56.7%
-
67.3%
91.7%
64.7%
72.0%
89.7%
71.8%
47.7%
16.6%
-
-
-
% Indicated
%
26.5%
-
32.7%
8.3%
35.3%
27.2%
8.9%
26.7%
49.7%
30.6%
31.1%
-
-
% Inferred
%
16.8%
-
-
-
-
0.9%
1.4%
1.5%
2.7%
52.8%
68.9%
100.0%
-
Lead Grade
%
3.4%
-
3.8%
4.1%
3.2%
3.8%
3.3%
3.1%
3.1%
3.6%
3.4%
2.9%
-
Silver Grade
g/t
39
-
24
39
28
60
50
22
27
42
41
50
-
Processed Tonnes
Mt
18.3
-
-
1.39
2.25
2.26
2.25
2.25
2.25
2.26
2.25
1.11
-
Lead Grade
%
3.4%
-
-
5.5%
3.4%
4.0%
3.5%
3.1%
3.0%
2.5%
3.5%
3.0%
-
Silver Grade
g/t
39
-
-
47
30
59
54
24
27
30
41
41
-
Lead Recovery
%
91.6%
-
-
90.9%
94.1%
90.0%
88.0%
92.7%
94.7%
93.8%
90.3%
90.3%
-
Silver Recovery
%
81.7%
-
-
87.2%
86.2%
82.2%
81.4%
86.9%
86.9%
85.7%
70.4%
70.3%
-
Concentrate Produced
kt
873
-
-
109
110
126
112
99
98
80
97
42
-
Lead Grade
%
65.8%
-
-
64.2%
65.6%
63.5%
62.4%
65.9%
66.0%
65.7%
72.2%
72.3%
-
Silver Grade
g/t
664
-
-
529
532
860
878
479
535
730
677
770
-
Payable Lead
kt
546
-
-
61
69
79
65
63
63
50
68
30
-
Payable Silver
Moz
17.2
-
-
1.5
1.7
3.2
3.0
1.4
1.5
1.8
2.0
1.0
-
Boab Metals Limited ASX: BML
28
29
Sorby Hills Feed Study
Life of Mine Cashflows
FINANCIAL SUMMARY
Unit
Total
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
Lead Revenue
A$M
1,803
-
-
198
225
260
215
207
208
165
226
98
1,803
Silver Revenue
A$M
693
-
-
59
69
131
121
57
62
71
82
40
693
Total Revenue
A$M
2,496
-
-
257
295
392
337
264
269
236
308
138
-
TR/RCs
A$M
(191)
-
-
(21)
(23)
(30)
(26)
(21)
(21)
(18)
(22)
(10)
-
Royalties
A$M
(95)
-
-
(10)
(11)
(14)
(12)
(10)
(10)
(9)
(12)
(5)
-
Net Revenue
A$M
2,209
-
-
227
260
347
299
233
238
210
274
123
-
Logistics
A$M
(117)
-
-
(14)
(15)
(17)
(15)
(13)
(13)
(11)
(13)
(6)
-
Mining
A$M
(547)
-
-
(51)
(62)
(94)
(93)
(81)
(71)
(54)
Share your feedback
Discover