Corporate Presentation
Released
Released
Announcement PDF
February 2026
Corporate Presentation
www.boabmetals.com
Sorby Hills SILVER - LEAD PROJECT
Fully-funded, near-term Australian silver - lead producer
2
1 13.7m Performance rights
Boab Metals
Investment Thesis
2
Boab Metals Limited ASX: BML
# Holder Name 25 Dec 2025
1 Citicorp Nominees Pty Limited 17.87%
2 JP Morgan Nominees Australia PL 7.10%
3 BNP Paribas Nominees Pty 4.56%
4 Buttonwood Nominees Pty Ltd 2.72%
5 Villiers Queensland PL 2.41%
Capital Structure 25/02/2026
Shares on Issue1 576m
Share Price 64.5cps
Market Capitalisation $372m
Cash Position $101m
Debt Outstanding Nil
Enterprise Value $271m
Top Five Shareholders
• ASX-listed base and precious
metals developer and explorer.
• Advancing toward production
at Sorby Hills following FID (Dec 25)
• Board & Management team
with a proven track record
in development.
• Top 20 shareholders hold
52% of issued capital.
# Holder Name 5 February 2026
1 Franklin Resources Inc. 7.12%
Substantial Shareholders
3
Boab Metals
Investment Thesis
3
Boab Metals Limited ASX: BML
Jurisdiction & orebody
✓ Tier 1 jurisdiction in WA, 150km from port.
✓ Low-risk open pit mining operation.
✓ Stage 1 production, 8.5 years: ~2.2Moz silver and 68kt lead per year1.
Funding & commercial de-risking
✓ Long-term offtake agreement with Trafigura
over 50% of silver-lead concentrate.
✓ A$236m binding debt commitment secured.
✓ 100% project ownership recently secured.
✓ All equity secured to build the project and reach production.
Execution status
✓ Acquisition of the DeGrussa processing plant executed.
✓ Final Investment Decision made.
✓ On-site Early Works commenced.
✓ First Concentrate Production due in H2 2027.
The fully funded Sorby Hills Project is a near-term production asset in a tear 1 jurisdiction
Figure: DeGrussa
Processing Plant
1. ASX Release 6 June 2024
4
Boab Metals
Investment Thesis
4
✓ Industrial demand: Unmatched conductivity make silver critical for solar panels, EV electronic and
central to the global energy transition.
✓ Supply squeeze: With primary mine output declining, most silver now coming only as a by-product, and
recycling stuck at ~20%, supply cannot keep pace - entrenching a structural deficit.
✓ Value storage & safe-haven: As a monetary metal, silver is a store of value, moving with gold during
inflationary or geopolitical uncertainty.
✓ Speculative kicker: Gold–silver ratio, investor flows to silver EFTs, and leveraged futures trading all
leading to amplified volatility - giving silver greater upside torque in bull markets.
Boab Metals Limited ASX: BML
SILVER SNAPSHOT:
THE CROSSROADS OF INDUSTRY AND INVESTMENT
The Sorby Hills Project provides investors with exposure to attractive near-term
silver production in Australia.
Source: Silver Institute Nov 2025 Interim / World Silver Survey 2025
5
Boab Metals
Investment Thesis
5
✓ Enduring Demand: A lead-acid battery is typically replaced two to three times in a Light Vehicle's average lifetime of
around 12 years supporting a demand tail that will stretch decades.
✓ Indian Lead Demand: Indian consumption of refined lead is forecast to grow 5% YOY through to 2030.
✓ Silver Lining: High demand for silver bearing lead concentrates is delivering record low Concentrate Treatment
Charges (negative US$65/t)
✓ Price Stability: A mature secondary market provides a buffer against price shocks, limiting the Lead price to a relative
tight and predictable range.
Boab Metals Limited ASX: BML
LEAD SNAPSHOT:
THE ORIGINAL BATTERY METAL
Sorby Hills provides investors with exposure to rising silver prices leveraging off robust
project economics underpinned by a historically stable lead price.
Source: ILZSG Statistical Bulletin Oct 2025
6
0
20
40
60
80
100
120
Jan-24 Apr-24 Jul-24 Oct-24 Jan-25 Apr-25 Jul-25 Oct-25
Silver
Price
(A$/oz)
Boab Metals
Investment Thesis
6
Boab Metals Limited ASX: BML
6 June 2024
Sorby Hills FEED Study1
NPV8 A$411M, IRR 37%
Assumed Silver Price A$40/oz
17 December 2025
Final Investment Decision
Silver Price +A$100/oz
14 Oct 2025
A$50M
Equity Raise
27 Nov 2025
A$236M
Debt Facility
A$ Silver Price
SILVER LEVERAGE
Sensitivity analysis in the FEED Study
demonstrates that a A$1 increase in
the silver price increases Project NPV
by approximately A$10m¹,².
Silver price is currently trading
~A$65/oz above the price assumed in
the FEED Study3
1. ASX Release 6 June 2024
2. See Appendix for FEED Study sensitivity analysis
3. A$ Silver Price of 104.7/oz 22 December 2025
On track for production in 2027.
15 Dec 2025
A$60M
Equity Raise
7
7
Boab Metals Limited ASX: BML
Sorby Hills Project
Feasibility Study Complete
NPV8 A$411M
IRR 37%
Strong pre-tax economics
A$264M pre-production Capex
(material cost reduction
anticipated resulting from
DeGrussa acquisition)
C1 cash cost US$0.36/lb payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
A$126M p.a. Average EBITDA
2.25Mtpa
Initial 8.5 Year Mine Life
A$1.1B Operating Cash Flow
Shallow high grade and Low Strip Ore delivering strong
low risk early cashflows and rapid payback
SORBY HILLS REVENUE SPLIT
Based on FEED Study Assumptions
including Silver @ US27.4/oz
546kt Payable Lead
A$1.8B Revenue
Assuming a spot silver price² of US$90/oz,
silver is expected to contribute the majority
of forecast revenue
1. ASX Release 6 June 2024
2. As at 26 February 2026
17.2Moz Payable Silver
A$0.7B Revenue
FEED Study Macroeconomic Assumptions
Ag: US$27.4/oz (A$40.4/oz), Pb: US$2,252/t (A$3,312/t), FX: 0.68, Lead TC: US$125/t
Average Annualised Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
Front end engineering and design study1 highlights.
8
8
Sorby Hills Project
Cost structure delivering ‘free silver’
*Based on Spot Price of US$90/oz Ag
Sorby Hills FEED
Study AISC
ex-Silver Credits
US$0.81/lb Pb
US$/lb Pb
1.0
2.0
0
10-Year average
Lead Price1
US$0.94/lb Pb
+/-US$0.10/lb Pb
standard deviation
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
Sorby Hills AISC
ex Lead “Credits”
US$51/oz Ag
US$/oz Ag
0
50
-50
Sorby Hills
Net Lead
“Credits”
US$65/oz Ag
AISC = negative US$14/oz Ag
Sorby Hills – A low-cost Silver Producer
63% Margin
AISC = All in Sustaining Cost or “Breakeven” cost
Project Costs Project Revenue
Increasing Silver Price
1 As at 26 Feb 2026
Boab Metals Limited ASX: BML
Sorby Hills Project
is a low-cost silver producer
AISC = negative US$14/oz Ag
Operating costs covered by a non-volatile lead price.
Operating margin fully leveraged to silver price movements.
Sorby Hills Net
Silver Credits*
US$1.27/lb Pb
9
9
Sorby Hills Project
Set to be a major silver producer in 2027
Boab Metals Limited ASX: BML
Company Asset Silver Production (koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2,414
Boab Metals Sorby Hills 2,191
Average annualised production
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
*Source FY24 and FY25 Annual Reports. List is not exhaustive
The Sorby Hills project is set to becoming one of the heavy weights in Australian silver mining.
Ongoing early works at Sorby Hills
10
10
Sorby Hills Project
47.3Mt @ 123g/t Silver Equivalent
Boab Metals Limited ASX: BML
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag PbEq1 Pb Zn Ag
% % g/t % kt kt koz
A 0.6 5.3% 0.1% 23 6.1% 31 6 427
B 2.7 3.6% 0.3% 20 4.3% 97 8 1,720
Omega 17.2 3.3% 0.4% 34 4.5% 566 71 18,948
Norton 21.1 2.8% 0.4% 34 4.0% 590 96 24,090
Alpha 1.5 3.1% 0.9% 64 5.3% 45 13 2,975
Beta 4.2 3.6% 0.4% 43 5.1% 151 17 5,856
Measured 12.6 3.5% 0.4% 43 5.0% 444 45 17,521
Indicated 11.0 3.4% 0.4% 34 4.6% 377 46 12,114
Inferred 23.6 2.7% 0.5% 31 3.8% 645 117 23,406
Total 47.3 3.1% 0.4% 35 4.3% 1,465 207 53,042
See ASX announcement 17 Dec 2021 1. See Appendix for Lead & Silver Equivalent calculation method Figure: Location of the Sorby Hills Resources
11
11
Sorby Hills Project - Stage 1
Low Risk Open Pit Ore Reserve
Boab Metals Limited ASX: BML
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A 4.1 3.7 0.5 3.7 16.4 4.3% 8.1
Pit B 14.8 12.6 2.3 3.2 17.4 3.8% 5.5
Omega South 21.1 18.3 2.8 2.9 29.5 3.9% 6.5
Omega Main 57.7 50.3 7.4 3.6 38.7 5.0% 6.8
Norton 21.4 19.5 1.9 4.0 78.5 6.8% 10.0
Beta 35.6 32.2 3.4 3.3 41.5 4.8% 9.5
Total Production 154.8 136.5 18.3 3.4 38.8 4.8% 7.5
FEED Study Production Target
1. See Appendix for Lead Equivalent calculation method
Figure: DFS pit shells with respect to the Resource block model
Production Target
underpinned 83% by
Measured and
Indicated Resources.
Including 95%
Measured and
Indicated Resources
over the first 7 years
of production.
57%
26%
17%
Measured Indicated Inferred
Ore Reserve Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz)
Proved 10.4 3.5% 42 358 14.1
Probable 4.9 3.5% 32 172 5.0
Total Ore Reserve 15.2 3.5% 39 531 19.1
Ore Reserve Statement
12
12
Sorby Hills Project – Growth Potential
Positioned for Long-Term Value Creation
Boab Metals Limited ASX: BML
✓ Current Mine Plan represents only 37% of the
defined Resource at Sorby Hills
✓ Large shallow deposit allowing for efficient and
effective Resource growth
✓ Structural change in silver pricing allowing for
re-optimisation of open pit designs and
potential growth in the Production Target.
✓ Current open pit designs are based on a
US$21.1/oz Silver Price
✓ Near-pit Resource extensions and defined
regional strategic exploration targets
Production Target and Strategic
Growth Opportunities
Eight Mile Creek
(Pb-Ag-Zn)
Keep Zn-Pb Target
Boab Metals 100% owned Silver-Lead-Zinc assets in the Kimberley
13
13
Sorby Hills Project
DeGrussa Process Plant: An Ideal Fit
Boab Metals Limited ASX: BML
See ASX announcement 19 January 2023
SAG Mill
Ball Mill
Tailings Thickener
Concentrate
Thickening
& Filtration
Flotation Circuit
Primary Crusher
Crushed Ore Storage Bin
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES
during FEED showing key components of the design that have been
secured via the acquisition of the DeGrussa Processing Plant.
All major components for the Sorby Hills Process Plant
have been secured via acquisition of the DeGrussa
Process Plant from Sandfire Resources
Extensive list of spares included in the acquisition.
Acquisition of the DeGrussa Processing Plant
significantly reduces and derisks project execution
timeline. Tender process has indicated
▪ A$20M saving in Processing Plant capital cost
▪ 6 months reduction in construction timeline
DeGrussa Processing Plant
14
14
Sorby Hills Project
Loading at nearby Wyndham Port
Boab Metals Limited ASX: BML
Wyndham Port located just 150km from
Sorby Hills by existing sealed road.
Port Access Agreement executed
with port operators Cambridge Gulf.
Concentrate to be transported from site to
Wyndham in sealed containers.
873kt of Concentrate shipped at an average 103kt pa.
• Average 664 g/t Silver
• Average 65.8% Lead
Spot Treatment Charges currently priced
at minus US$135/t1 - versus positive US$125/t
benchmark assumed in the Sorby Hill FEED Study
Highly competitive offtake process including
global traders and smelters has demonstrated the
attractiveness of the Sorby Hills concentrate product.
1. Zinc/Lead Market Weekly Updates - 2025/11/28 | SMM
15
15
Sorby Hills Project
Ongoing Early Works at Sorby Hills
Boab Metals Limited ASX: BML
The Early Works Program encompasses
a range of critical preparatory activities
essential to enable future operations.
Initial works include:
• Construction of site access roads;
• Establishment of foundations
for the processing plant and
accommodation camp;
A$5M in cost reductions compared to the
FEED Study have been realised to date.
16
16
Sorby Hills Project
Construction Timeline
Boab Metals Limited ASX: BML
First Production scheduled to occur in H2 2027
✓
2025 2026 2027
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FID
Early Works
Camp Refurbishment
Bulk Earthworks
Pre-Strip Mining
DeGrussa Disassembly
Process Plant Reconstruction
Commissioning & Ramp Up
Full Production
17
Boab Metals
Near Term Share Price Catalysts
17
Q1 2026
• Completion of on-site Early Works
• Award of Processing Plant Contract
• Final Regulatory Mining Approvals
Q2 2026
• Commencement of Processing Plant dismantling and
relocation from DeGrussa to Sorby Hills
• Commencement of mine life extension and exploration
drilling at both Sorby Hills and Manbarrum projects
• Award of Mining Contract
• Project Delivery Plan (updated Study) incorporating
contracted costs and revised macroeconomic assumptions
Boab Metals Limited ASX: BML
18
Boab Metals
Summary: Fully Funded. High Margin. Australian Silver.
18
Boab Metals Limited ASX: BML
“Zero-Cost” Silver Strategy
Lead Credit covers the operating costs,
silver revenue straight to the bottom line.
Pure Upside of Silver
~2 Moz silver p.a. at steady state, providing delivers pure profit
and leverage to the silver price.
Every A$1/oz increase in the silver price adds roughly A$10m
to Project NPV, highlighting powerful silver leverage.
Strong Project Economics
FEED Study base case (2024): NPV8 A$411m, IRR 37%,
average EBITDA A$126m p.a., upfront capex A$264m.
Fully funded, FID made, first production of Silver-Lead
concentrate targeted for H2 2027.
19
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Thank You
19
Boab Metals Limited ASX: BML
20
20
Sorby Hills Project
Excellence in Project Delivery
Boab Metals Limited ASX: BML
A Board and Management team with a proven track record in project development.
Engineer with over 30 years’
experience in the Australian
mining industry, with a strong
track record in successfully
commissioning and operating
base metal mines.
Gary Comb
Chairman
Lawyer with significant
experience in the exploration
and mining industry. Wealth of
expertise in corporate advisory,
strategic consultancy and
raising capital.
Andrew Parker
Non-Exec. Director
Geologist with over 30 years’
experience in technical,
commercial, marketing and
finance within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Experienced mining executive
with a strong background in
management, capital raising
and operating joint ventures
with mid to top tier miners in a
variety of commodities.
Simon Noon
Managing Director & CEO
Mining executive with 30+ years’
experience in large-scale mining.
Held senior leadership roles with
major resources companies including
BHP, Peabody, Mineral Resources and
Downer Mining.
Russell Taylor
Project Director
21
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning, among
other things, future operating and exploration results or the Company’s future performance.
These forward-looking statements speak, and the presentation generally speaks, only at the
date hereof. The projections, estimates and beliefs contained in such forward-looking
statements necessarily involve known and unknown risks and uncertainties, and are
necessarily based on assumptions, which may cause the Company’s actual performance and
results in future periods to differ materially from any express or implied estimates or
projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly available
sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian law.
The presentation does not constitute or form part of any invitation, offer for sale or subscription
or any solicitation for any offer to buy or subscribe for any shares in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the time of
preparation. No representation or warranty, express or implied is made as to the fairness,
accuracy or completeness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Boab Metals Limited, its related bodies
corporate and the officers, directors, employees, advisers and agents of those entities do not
accept any responsibility or liability for any loss arising from the use of the presentation or its
contents or otherwise arising in connection with it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for
Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
boabmetals.com.au. The Company confirms that it is not aware of any new information that
materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the
Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and
FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Ore Reserve Statement and that all
material assumptions and technical parameters underpinning the estimates, production
targets and financial forecasts continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been extracted
from the ASX Announcements titled “KEEP confirmed as a Target for Further Exploration”
dated 22 October 2024, “Significant Intercepts at Sorby Hills” dated 8 November 2023,
“Amended Drilling Announcement” dated 4 September 2023”, “Assays Confirm Further
Positive Outcome for Sorby” dated 23 January 2023, “High-Grade Lead-Silver Confirmed at Beta
Deposit” dated 1 February 2022 available to view at www.boabmetals.com.au. The Company
confirms that it is not aware of any new information or data that materially affects the
information included in these announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially
modified from the form in which they were first presented.
Disclaimer
21
Boab Metals Limited ASX: BML
22
Appendix
22
23
Sorby Hills Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the
east Kimberley Region
Figure:
Location of the
Manbarrum
Project, Eight
Mile Creek
Project and
Keep n-Pb
Target relative
to Sorby Hills.
Manbarrum Zn-Pb-Ag Project
▪ located 25km east of the Sorby Hills Project.
▪ 175km2 of prospective tenements (including two
granted mining leases) covering geology related
to that found at Sorby Hills.
▪ Mineral Resources declared at two prospects
which are zinc and silver dominated.
▪ Conceptual open pit mining studies completed
by CSA Global in 2018.
Keep Zinc Lead Target
▪ New Zinc-Lead mineralisation recently discovered
via greenfield exploration within the existing Sorby
Hills mining leases.
▪ Ore grade intercepts include:
▪ SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb &
2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪ SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb &
5.86% Zn) and 36.7 g/t Ag from 303.0 m
Eight Mile Creek Project
▪ 30km of along-strike geology, highly prospective
for deposits similar to Sorby Hills.
▪ The exploration success based on seismic data at
the Keep Zinc-Lead Target has opened the door
for more bold exploration at Eight Mile Creek.
Eight Mile Creek
(Pb-Ag-Zn)
Keep Zn-Pb Target
Boab Metals Limited ASX: BML
23
ASX Release 22 October 2024
24
Boab Metals Limited ASX: BML
24
✓ Binding Commitment for a A$236M Debt Facility executed with
Merricks Capital and Davidson Kempner
Facility inclusive of Cost Overrun Tranche (drawn if required) and
funding of Interest and Fees incurred during construction period.
✓ Clean Debt Structure - No warrants, no royalties, no production linked
payments or equity-like features
Limits shareholder dilution and allows investors to retain exposure
to further silver price upside and associated cashflow.
✓ 5 Year Loan Tenor from First Drawdown
First drawdown expected to occur in the second half of 2026.
✓ Light touch amortisation profile
Six months interest only from Project Completion followed by
quarterly repayments, each equating to 5% of the debt facility,
with the remaining amount paid as a bullet at maturity.
✓ Flexible hedging requirements
Allows the Company to develop a risk management strategy
utilising lead or silver hedging , or a combination of both, to optimise
risk management whilst retaining price upside.
✓ Project Finance Debt Facility replaces Trafigura Prepayment thus
delivering material upside in the form of improved offtake terms
A$236M Project
Finance Debt Facility1
A transformative
milestone for the
Company and a strong
endorsement of the
Sorby Hills Project
The debt facility commitment is subject to conditions
precedent which are expected to be completed in Q1 2026
1. ASX Release 27 November 2025
Sorby Hills Project
Debt Finance Secured
25
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster
• Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
• The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
• Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
25
Boab Metals Limited ASX: BML
Sorby Hills Project
Establishing Deep Roots within Local Community
26
PHYSICALS SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
ROM Mined Mt 18.3 - 0.4 2.1 2.3 2.4 2.5 2.3 2.0 1.1 3.0 0.3 -
Waste Mined Mt 134.6 - 3.8 11.7 14.3 25.7 25.4 21.0 17.3 13.0 4.2 0.2 -
% Measured % 56.7% - 67.3% 91.7% 64.7% 72.0% 89.7% 71.8% 47.7% 16.6% - - -
% Indicated % 26.5% - 32.7% 8.3% 35.3% 27.2% 8.9% 26.7% 49.7% 30.6% 31.1% - -
% Inferred % 16.8% - - - - 0.9% 1.4% 1.5% 2.7% 52.8% 68.9% 100.0% -
Lead Grade % 3.4% - 3.8% 4.1% 3.2% 3.8% 3.3% 3.1% 3.1% 3.6% 3.4% 2.9% -
Silver Grade g/t 39 - 24 39 28 60 50 22 27 42 41 50 -
Processed Tonnes Mt 18.3 - - 1.39 2.25 2.26 2.25 2.25 2.25 2.26 2.25 1.11 -
Lead Grade % 3.4% - - 5.5% 3.4% 4.0% 3.5% 3.1% 3.0% 2.5% 3.5% 3.0% -
Silver Grade g/t 39 - - 47 30 59 54 24 27 30 41 41 -
Lead Recovery % 91.6% - - 90.9% 94.1% 90.0% 88.0% 92.7% 94.7% 93.8% 90.3% 90.3% -
Silver Recovery % 81.7% - - 87.2% 86.2% 82.2% 81.4% 86.9% 86.9% 85.7% 70.4% 70.3% -
Concentrate Produced kt 873 - - 109 110 126 112 99 98 80 97 42 -
Lead Grade % 65.8% - - 64.2% 65.6% 63.5% 62.4% 65.9% 66.0% 65.7% 72.2% 72.3% -
Silver Grade g/t 664 - - 529 532 860 878 479 535 730 677 770 -
Payable Lead kt 546 - - 61 69 79 65 63 63 50 68 30 -
Payable Silver Moz 17.2 - - 1.5 1.7 3.2 3.0 1.4 1.5 1.8 2.0 1.0 -
Boab Metals Limited ASX: BML
26
Sorby Hills Project
Life of Mine Physicals
27
FINANCIAL SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Lead Revenue A$M 1,803 - - 198 225 260 215 207 208 165 226 98 1,803
Silver Revenue A$M 693 - - 59 69 131 121 57 62 71 82 40 693
Total Revenue A$M 2,496 - - 257 295 392 337 264 269 236 308 138 -
TR/RCs A$M (191) - - (21) (23) (30) (26) (21) (21) (18) (22) (10) -
Royalties A$M (95) - - (10) (11) (14) (12) (10) (10) (9) (12) (5) -
Net Revenue A$M 2,209 - - 227 260 347 299 233 238 210 274 123 -
Logistics A$M (117) - - (14) (15) (17) (15) (13) (13) (11) (13) (6) -
Mining A$M (547) - - (51) (62) (94) (93) (81) (71) (54) (36) (4) -
Processing A$M (388) - - (38) (47) (47) (47) (47) (47) (47) (47) (24) -
G & A A$M (88) - - (10) (10) (10) (10) (10) (10) (10) (10) (5) -
Operating Cash Flow A$M 1,069 - - 114 126 180 134 81 96 88 167 84 -
Pre-production Capex A$M (264) (131) (133) - - - - - - - - - -
Sustaining Capex A$M (26) - - (12) (1) (3) (1) (0) - - - (5) (4)
Project Cash Flows A$M 778 (131) (133) 101 125 177 133 81 96 88 167 78 (4)
NPV8 A$M 411
IRR % 37
Average EBITDA A$M 126
Boab Metals Limited ASX: BML
27
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
Sorby Hills FEED Study
Life of Mine Cashflows
28
Item
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract 134.9 - 134.9
Site Est / Bulk Earthworks 31.9 4.9 36.9
Water Management 8.1 11.7 19.8
Accommodation Village 11.5 - 11.5
Other Infrastructure 8.5 0.6 9.1
Owners Costs 32.0 - 32.0
Contingency 22.7 - 22.7
Pre-Production Opex 15.0 - 15.0
Closure Costs - 9.3 9.3
Total Capital Costs 264.5 26.5 290.9
Total upfront capital cost of A$264M
including A$22.7M contingency.
~66% of capital costs underpinned by
tendered pricing, including an updated
Process Plant EPC pricing following the
completion of Front-End Engineering &
Design by GRES.
A$32M Owner Costs including
operational readiness items such as
critical spares and owner’s team.
Opportunities being explored to
further reduce upfront capital costs
and project implementation risk.
Boab Metals Limited ASX: BML
28
Sorby Hills FEED Study
Capital Cost Breakdown
29
Unit Operating Costs based on 18.3Mt of Ore, 546kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Item
Total
(A$M)
Unit Costs
A$/t ore US$/lb payable Pb
Logistics 117 6.4 0.07
Mining 547 30.0 0.31
Processing 388 21.3 0.22
G & A 88 4.8 0.05
Lead Treatment 160 8.8 0.09
C1 Costs (ex-Credits) 1,300 71.2 0.74
Net Silver Credits (661) (36.2) (0.37)
C1 Costs 639 35.0 0.36
Royalties 95 5.2 0.05
Sustaining Capital 26 1.4 0.01
AISC 760 41.6 0.43
Competitive C1 cash cost of US$0.36/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Boab Metals Limited ASX: BML
29
Sorby Hills FEED Study
Operating Cost Breakdown
30
Boab Metals Limited ASX: BML
30
-
100
200
300
400
500
600
700
800
900
1,000
-30% -25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25% 30%
Project
NPV8
(A$M)
Lead Silver FX Lead TC Opex Capex
Assumption Unit FEED Spot1 Change
Lead Price U$/t 2,252 1,990 (12%)
Silver Price US$/oz 27.4 93.1 240%
FX A$:US$ 0.68 0.71 (4%)
Lead TC US$/t 125 (135)2
(208%)
1 As at 26 February 2026
2. Zinc/Lead Market Weekly Updates - 2025/11/28 | SMM
A 30% increase in Silver price increases NPV from A$411m to A$540m = delta of A$129m
A 30% increase in A$ Silver Price of A$40.3/oz = A$52.4/oz = delta of A$12.1/oz
Change in NPV vs Change in A$ Silver Price = A$129m / A$12.1/oz = A$10.7m/oz
Sorby Hills FEED Study
Project Sensitivity Analysis
31
1st Quartile 2nd Quartile 3rd Quartile 4th Quartile
Sorby Hills Project
2027 Lead Cost Curve (ex-works basis)
US$/t
Lead
Low risk open cut
mining and high
process plant
throughput drives
low operating cost
relative to global
peers.
CRU, Independent Market Consultant Report for Boab Metals’ Sorby Hills Pb-Ag Project (Sept 2023).
Independently confirmed as a 1st Quartile Project
on the Global Lead cost curve
Boab Metals Limited ASX: BML
31
Sorby Hills FEED Study
Confirmed Low-Cost Producer
32
Feed Study Macroeconomic Assumptions
The contained metal equivalence formula is
based on the Sorby Hills FEED Study including:
• Lead Price US$2,253/t; and
• Silver Price US$27.4/oz.
Lead Equivalent Calculations
• Silver recovery of 82% (weighted
average of oxide and fresh Ag
recoveries); and
• Silver Payability rate of 95%.
Silver Equivalent Calculations
• Lead recovery of 91% (weighted
average of oxide and fresh Pb
recoveries); and
• Lead Payability rate of 95%.
Pb
Ag
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return
rate, V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the DFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
Assumption Unit 2025 2026 2027 2028 2029+
Lead Price US$/t 2,259 2,268 2,269 2,254 2,251
Silver Price US$/oz 24.8 25.8 26.4 27.3 27.5
Exchange Rate A$:US$ 0.70 0.70 0.70 0.69 0.68
32
Boab Metals Limited ASX: BML
Metal Equivalent Calculations