Phase VII Drilling Program Completed
with Exciting Result at the Keep Seismic Target
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) wishes to advise that it has amended
its announcement of 29 August 2023 relating to the Phase VII Drilling program at its 75% owned
Sorby Hills Lead-Silver-Zinc Project (“Sorby Hills” or “the Project”).
The announcement now incorporates a table 2 “Drill hole mineralisation descriptions and mineral
estimates”, which includes estimates (in % terms ) of abundances of mineralisation and also
includes a cautionary statement.
The Company believes that all other requirements regarding visual estimates were included in
the original announcement or have now been satisfied in accordance with AIG guidelines.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 8 6268 0449
Email: info@BoabMetals.com
4 September, 2023
Phase VII Drilling Program Completed
with Exciting Result at the Keep Seismic Target
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to announce the successful
completion and potential discovery of a new zone of mineralisation during its Phase VII drilling
program at its 75% owned Sorby Hills Lead-Silver-Zinc Project (“Sorby Hills” or “the Project”),
located in the Kimberley Region of Western Australia.
HIGHLIGHTS
• All Program objectives achieved with 24% more metres drilled within planned budget:
o
2,634m completed for 22 drill holes.
o
One new target tested.
•
Drilling of the “Keep Seismic Target” delivered an intercept of visual mineralisation over a
15m interval from 242m including intervals of massive sphalerite (ZnS).
•
Assay results expected late Q3/early Q4 2023.
Boab Managing Director and CEO, Simon Noon, stated:
“We are pleased to report the successful completion of our 2023 drilling campaign.
Efficient drilling progress has allowed us to complete additional drill holes within original budget
including three drill holes to test extensions to mineralisation north of Norton and Beta deposits,
as well as the testing of the conceptual “Keep Seismic Target”.
We are very excited to report that the drill hole at the Keep Seismic Target has intersected
predominantly zinc-sulphide mineralisation between 242m and 257m. This is an outstanding
success given the conceptual nature of the target and its location in an area, and at a depth where
no mineralisation has been intersected before. The location of the drill hole sits around 2km away
from the closest defined deposit at Sorby Hills.
The step-out drill holes at Norton and at Beta also confirmed the continuity of mineralisation.
In conjunction with our 2023 drill program, Boab continues to advance toward a final investment
decision on the Sorby Hills Project with preferred EPC contractor GRES firming up Front End
Engineering & Design work and discussions with financiers are ongoing.”
Background
Boab’s planned Phase VII drill program comprised 19 diamond drill holes for approximately 2,000m
with the objective of targeting opportunities to increase the Sorby Hills Reserve base via additional
metallurgical testwork, extensional and in-fill drilling.
The efficient and cost-effective progress allowed for additional metres and drill holes to be
completed. One additional hole was drilled at Norton North, 50m north of SHSD_164 in an area of
very wide-spaced historic drilling, one additional hole at Beta to test continuity of mineralisation and
one deep drill hole at a conceptual target south of the current resource area.
Collar locations for all the completed drill holes are shown in (Figure 1) below.
Figure 1: Plan view of the Sorby Hills Project showing the locations of completed drill holes for
Phase VII with respect to previous drilling, the Mineral Resource and DFS open pit outlines.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 2
Phase VII Program Details
The Phase VII work program concluded with the completion of 22 drill holes for 2,634m (an
additional 24% of metres than originally planned). Of the total program, 1,433m across 13 holes were
drilled for a metallurgical purpose with another 1,200m across 9 holes drilled for resource/reserve
expansion and exploratory objectives.
The utilisation of the sonic drilling technology to penetrate the unconsolidated cover rocks has had
a favourable impact on productivity.
For detailed drill hole locations and geological descriptions of significant mineralisation observed
please refer to tables 1 and 2 of the appendixes.
Metallurgical drilling
This metallurgical portion of the program was driven by the prospect of spatially restricting the
poorer performing ore material at Norton and to provide additional material upon which further
test work can be undertaken. A positive result could lead to a material increase in the overall metal
recovered from the Norton deposit.
Over and beyond its main purpose, the metallurgical portion of the drill program has confirmed the
intersection of mineralisation at Norton at a depth and over a width as consistent with the Sorby
Hills Resource model.
Extensional drilling
The Resource extension/exploratory drilling component of the program was boosted by another
3 drill holes. In addition to the follow up of SHMR_149 (Phase VI program) which terminated in highgrade mineralisation (2m @ 10.9% Pb), and the drill holes which targeted the periphery of the
mineralisation at Norton, further holes were drilled:
1.
as a step out to SHSD_164 at Norton North to test the continuity of mineralisation (Figure 2),
2.
at Beta to test the tenor of mineralisation away from an historic drill hole; and
3.
into the conceptual Keep Seismic target.
Norton North
It was reported that the follow up test hole SHSD_164 of Phase VII at Norton North successfully
tested and penetrated mineralisation at the target depth of approximately 100m down hole, 12m to
the north. The additional drill hole SHSD_183 which was drilled about 60m northeast of SHSD_164
intersected partially oxidised and massive galena mineralisation (Figure 2). It appears that the
Norton Deposit is displaced and oxidised along a set of faults to the northwest.
Of the remaining exploration drill holes at Norton, several intersected mineralisation and are likely
to add to the expansion and classification of the resource/reserves.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 3
Figure 2: Cross section of the northern extension drilling at Norton (see Figure 1 for location).
Drilling at Beta
At Beta, drill hole SHSD_184 intersected visible mineralisation over two depth intervals, one at
around 32m below surface and one at about 100m below surface. The visual mineralisation is
moderate to strong with a significant amount of fine disseminated grains of galena within the
bedrock.
Keep Seismic Target
As announced in July 2022, the interpretation of historic seismic data from petroleum exploration
across the Burt Range Sub-Basin resulted in a conceptual drill target – the Keep Seismic Target. A
306.5m deep drill hole was successfully drilled into the Keep Seismic Target as part of the Phase VII
drilling program.
Seismic line WP96-08 traverses the project area about 2km south of B-Deposit and shows the
reflectors of the Devonian-Carboniferous sedimentary strata gradually dip to the east and affected
by a series of extensional faults (Figures 3 and 4) leading into a half-graben structure flanked on the
eastern side by a reef covered basement high which was targeted by the Pincombe No1 petroleum
well, drilled in 1996.
SHSD_185 was aimed at testing the potential for a mineralised feeder fault system, which can be
seen in the seismic data, and the potential for stratiform mineralisation near the Knox
Formation/Sorby Dolomite interface (Figure 4).
The drill hole intersected the base of the Knox Formation at about 224.6m and was terminated at a
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 4
depth of 306.5m within massive Sorby Dolomite after intersecting two zones of mineralisation
(Figure 4).
Figure 3
Figure 3 - Interpreted NE-SW trending seismic line WP_96-08 image showing the location of the Pincombe No1
oil well and the conceptual structural target within M80/287 & 289.
Figure 4 - Close up view of section and geological interpretation of SHSD_185 and seismic line WP_96-08.
The upper interval of mineralisation was intersected at the base of the impermeable Milligan’s
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 5
Shales which is part of the Middle Carboniferous sediments, from a down-hole depth of 82.5m for
about 5.5m. It consists of disseminated and thin bands of massive sulphide filled veins of galena
(PbS), marcasite (FeS) and sphalerite (ZnS) immediately below the shale. This stratigraphic position
is the main host of the Sandy Creek zinc deposit at Boab’s Manbarrum project located on the eastern
side of the Burt Range Trough in the Norther Territory.
The lower mineralisation interval – the principal target – was intersected from 242.55m over an
interval length of about 15m with intermittent intervals of massive colloform sulphides dominated
by sphalerite and disseminated coarse crystalline galena (Figure 5) with the lowermost massive
sphalerite bed located a 266.2m.
While the intersected mineralisation is predominantly of a strata bound, replacement-type nature
it centres around a fault breccia at a depth of ~ 251.3m which shows evidence of zinc and lead
sulphide mineralisation.
Boab is of the view that the initial result at the Keep Seismic Target is a major exploration success
demonstrating not only proof of concept but more importantly the potential of the Burt Range
Basin to host significantly more base metal mineralisation.
galena > sphalerite
sphalerite >> galena
sphalerite >> galena
Figure 5 -Photograph of SHSD_185 drill core interval 244.6m to 248.04m showing massive sphalerite + galena
replacement mineralisation intervals hosted in bedded carbonates of the Burt Range Basin.
Figure 6 Close up photograph of SHSD_185 drill core interval 245.3m to 246.1m showing colloform massive
sulphides (low-iron sphalerite = cream coloured & galena = blue grey)
Core sampling and analysis will be the immediate focus for the delivery of analytical results and the
progression of the metallurgical test work. However, the Keep Prospect and the next phase of follow
up work will be designed and planned as a priority.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 6
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 8 6268 0449
Email: info@BoabMetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by HenanYuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared
by Dr Simon Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists
(Member Number: 3101). Dr Dorling has sufficient experience which is relevant to the style of
mineralization and type of deposit under consideration and to the activity which they are
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr
Dorling consents to the inclusion in the release of the matters based on their information in the
form and context in which it appears.
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 7
Table 1: Drill Hole Collar locations and assay status
HOLE ID
mE
mN
RL
Depth
Dip
Azimuth
Assays
Prospect
SHSD_164
497015.01
8293749.61
20.77
144.50
-70
270
Resource
126.50
-70
270
Pending
Pending
Metallurgy
SHSD_165
496891.50
8293705.83
20.88
Resource
SHSD_166
497023.40
8293627.07
20.83
137.20
-70
270
Pending
SHSD_167
497017.07
8293515.44
20.63
126.50
-70
270
Pending
Metallurgy
270
Pending
Metallurgy
Metallurgy
SHSD_168
SHSD_169
SHSD_170
SHSD_171
SHSD_172
SHSD_173
497062.02
496999.74
496837.20
496904.50
496896.42
496763.80
8293474.33
8293477.70
8293450.11
8293475.10
8293517.13
8293280.62
20.64
20.65
20.65
20.71
20.81
21.17
120.00
-70
120.50
-70
270
Pending
126.50
-70
270
Pending
Resource
270
Pending
Metallurgy
Metallurgy
120.50
-70
117.50
-70
270
Pending
78.50
-70
270
Pending
Resource
Metallurgy
SHSD_174
496899.69
8293396.36
20.55
99.50
-70
270
Pending
SHSD_175
496892.72
8293593.61
20.78
108.50
-70
270
Pending
Metallurgy
270
Pending
Metallurgy
Metallurgy
SHSD_176
SHSD_177
SHSD_178
SHSD_179
SHSD_180
SHSD_181
497001.04
497051.91
496975.16
496862.15
496889.87
496687.25
8293391.09
8293379.99
8293285.89
8293296.15
8293239.00
8293306.61
20.63
20.73
20.63
20.63
20.56
20.63
111.50
-70
102.50
-70
270
Pending
102.50
-70
270
Pending
Metallurgy
270
Pending
Metallurgy
Metallurgy
90.50
-70
75.50
-70
270
Pending
69.50
-70
270
Pending
Resource
Resource
SHSD_182
497259.84
8292970.75
20.37
72.20
-70
270
Pending
SHSD_183
497070.85
8293784.31
20.93
132.50
-70
270
Pending
Norton Extra
315
Pending
Beta Extra
270
Pending
Keep Seismic Target
SHSD_184
SHSD_185
496164.87
498354.00
8295304.41
8288018.00
21.54
20.00
144.50
306.50
-70
-70
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 8
Table 2: Drill Hole mineralisation descriptions and visual estimates
Hole
SHSD_165
SHSD_166
SHSD_167
SHSD_168
SHSD_169
SHSD_170
SHSD_171
SHSD_172
SHSD_173
SHSD_174
SHSD_175
SHSD_176
SHSD_177
SHSD_178
SHSD_179
SHSD_180
SHSD_181
SHSD_182
Interval (m)
Mineralisation Description Sulphide/Oxide mineralisation % (Visual estimate*)
From
To
Length
30.50
31.50
1.00 Stratiform disseminated mineralised oxide after sulphides (Cs, Go) 15%
98.50
107.85
9.35 Stratiform blebby and disseminated sulphides (Gn,Mc) 5%
41.10
46.00
4.90 Stratiform weakly disseminated sulphide and oxide (Gn, Cs, Mc) 1%
83.80
90.50
6.70 Stratiform and crosscutting disseminated sulphides and veining (Gn,Mc) 5%
34.85
35.85
1.00 Stratiform disseminated sulphide (Gn) 1%
93.50
99.50
6.00 Stratiform disseminated sulphides (Gn,Sp) 5%
97.80
106.00
8.20 Stratiform disseminated sulphides (Gn,Sp,Mc) 5%
85.65
98.00
12.35 Stratiform disseminated sulphides (Gn,Mc) 5%
81.00
83.00
2.00 Stratiform disseminated mineralised oxide after sulphides (Cs, Go) 1%
81.95
93.50
11.55 Stratiform disseminated partially oxidised sulphides (Cs,Gn,Go,Mc) 5%
53.65
56.20
2.55 Stratiform disseminated oxide mineralisation (Cs,Go) 2%
95.20
106.40
11.20 Stratiform disseminated partially oxidised sulphides (Cs,Go,Gn) 10%
63.50
65.90
2.40 Stratiform disseminated partially oxidised sulphides (Cs,Gn,Go) 10%
76.30
88.30
12.00 Stratiform disseminated to semi massive sulphides (Gn,Sp,Mc) 15%
77.20
82.30
5.10 Stratiform disseminated oxide mineralisation after sulphides (Cs,Go) 2%
42.00
44.60
2.60 Stratiform disseminated sulphides (Gn) 1%
70.80
82.90
12.10 Stratiform disseminated and semi massive sulphides (Gn,Mc) 10%
73.90
75.50
1.60 Stratiform disseminated sulphides (Gn,Mc) 10%
84.60
90.70
6.10 Stratiform disseminated Sulphides (Gn) 5%
45.10
47.50
2.40 Stratiform disseminated sulphides (Gn,Mc) 5%
50.80
58.20
7.40 Stratiform disseminated sulphides (Gn,Sp,Mc) 5%
23.00
25.40
2.40 Stratiform partly oxidised disseminated sulphides (Gn,Cs) 2%
53.50
59.50
6.00 Stratiform disseminated sulphides (Gn) 10%
62.00
70.00
8.00 Stratiform partly oxidised disseminated sulphides (Gn,Cs,Go) 1%
25.40
28.55
3.15 Stratiform disseminated sulphides (Gn) 1%
42.30
47.40
5.10 Stratiform partly oxidised disseminated sulphides (Gn,Cs,Go) 2%
48.40
54.60
6.20 Crosscutting partly oxidised sulphide veining (Gn) 5%
No significant mineralisation intersected
21.20
26.20
5.00 Stratiform disseminated oxide mineralisation after sulphides (Cs,Go) 2%
33.50
48.55
15.05 Stratiform and crosscutting disseminated oxide mineralisation after sulphides (Cs,Go) 5%
32.00
5.50 Stratiform blebby mineralised oxide after sulphides (Cs, Gn, Go) 1%
113.00
9.50 Stratiform Disseminated to semi massive dominantly oxide with some sulphide (Cs, Go, Gn, Mc) 5%
53.00
0.95 Crosscutting sulphide veining (Gn) 1%
SHSD_184
133.50
4.50 Stratiform Moderate to heavily disseminated sulphides (Gn,Sp,Mc) 15%
89.00
5.40 Stratiform and cross cutting sparse sulphide/carbonate veining 2 to 10mm wide (Gn) 1%
243.45
0.90 Cross cutting vein and disseminated stratiform sulphides (Gn, Sp) 3%
248.48
3.12 Stratiform massive, semi massive and disseminated banded sulphides (Sp, Gn, Mc) 20%
SHSD_185
256.65
8.17 Stratiform patchy disseminated sulphide (Gn, Sp, Mc) 1%
257.40
0.75 Stratiform coarse disseminated to semi massive sulphide (Sp, Gn) 10%
266.85
0.63 Crosscutting semi massive sulphide (Sp,Gn,Mc) 15%
Gn = Galena Sp = Sphalerite Cs = cerussite Mc = marcasite/pyrite Go = geothite
* In relation to the disclosure of visual mineralisation, Boab Metals cautions that visual estimates of sulphide and oxide minerals abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths and grade of the
visible mineralisation reported in the preliminary geological logging. Boab Metals will update the market when laboratory analytical results become
available.
SHSD_183
26.50
103.50
52.05
129.00
83.60
242.55
245.36
248.48
256.65
266.22
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 9
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques
(Criteria listed in the preceding section also apply to this section.)
Criteria
Sampling
techniques
JORC Code Explanation
•
•
•
Drilling
techniques
Nature and quality of sampling
(e.g. cut channels, random chips,
or specific specialised industry
standard
measurement
tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken
to
ensure
sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
•
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is
coarse gold that has inherent
sampling
problems.
Unusual
commodities or mineralisation
types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
•
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
Commentary
•
•
•
•
For the sonic/diamond drilling program (from June
to August 2023), sampling was not conducted in
the field. After geological logging the
cutting/sampling intervals were determined and
marked. The drill core destined for sampling has
been shipped to ALS laboratories in Perth for
cutting and sampling. The sampling process will
be supervised by Boab geologists.
The Sonic pre-collars were geologically logged
but not sampled. The diamond core intervals were
geologically logged by a geologist and assessed
for visible mineralisation. Where necessary
samples was also scanned with a portable XRF
(Olympus InnovX Delta) for an indication of
qualitative lead concentration.
The sampling methodology to be undertaken at
ALS laboratories is considered representative and
appropriate for the carbonate hosted style of
mineralisation at Sorby Hills and is consistent with
sampling protocols in the past conducted by
Boab.
The drilling method used in the Phase VII 2023
drill program is sonic pre collars until bedrock was
reached followed by diamond drilling (DD).
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 10
Criteria
Drill sample
recovery
JORC Code Explanation
•
•
Logging
Subsampling
techniques
and sample
preparation
Method
of
recording
and
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
•
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential
loss/gain
of
fine/coarse material.
•
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
•
Whether logging is qualitative or
quantitative in nature. Core (or
costean,
channel,
etc)
photography.
•
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
•
•
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
•
Quality
control
procedures
adopted for all sub-sampling
stages to maximise representivity
of samples.
•
Measures taken to ensure that the
sampling is representative of the
in-situ material collected, including
for instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
•
Commentary
•
The sample (core) recovery is between 98 and
100% for most of the core drilling including the
mineralised intervals. The were very few
occasions where broken ground conditions were
encountered where the core loss due to core
grinding was encountered.
•
The DD core was logged at the rig at the
temporary work site at Sorby Hills. The core
geotechnically, geologically, structurally and
mineralogically logged on site and photographed.
•
¼ core samples will be analysed first for
metallurgical drill holes and ½ core for the
remaining drill holes.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 11
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code Explanation
•
•
•
Verification
of sampling
and
assaying
•
•
•
•
Location of
data points
•
The
nature,
quality
and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
For
geophysical
tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors
applied
and
their
derivation, etc.
Nature
of
quality
control
procedures
adopted
(e.g.
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
•
The verification of significant
intersections
by
either
independent
or
alternative
company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
•
All samples will be sent to ALS Laboratories in
Perth for preparation and analysis. Duplicates,
blanks and standards inserted at regular intervals.
All samples will be assayed to accepted industry
standards at the ALS Laboratories in Perth. Multiacid digestion of pulverised sample was followed
by ICP-OES or equivalent assay technique
•
Certified Ore Grade Base Metal Reference
Material provided by Geostats Pty Ltd. The
standards selected covered a range of lead and
silver concentrations and there is good agreement
between the Pb and Ag assays, and the mean
values provided with the reference standards. For
the standards the assayed values were within half
of one standard deviation and more commonly
below the mean suggesting that grade
overestimation is not a significant problem in the
dataset.
•
Duplicates and Blanks were also included in all
sample despatches.
•
Geological logs were digitally entered into data
entry templates in MS Excel and entered into an
Access database.
Assay certificates were received from the
analytical laboratories and imported into the drill
database.
No adjustments were made to the assay data.
•
•
Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys), trenches,
mine workings and other locations
used
in
Mineral
Resource
estimation.
•
Accurately surveyed using a DGPS by a
registered surveyor and recorded in GDA94 Zone
52 will be conducted at the end of the program.
•
All drill holes are surveyed down hole on
completion of the drill hole with a Reflex EZ-A
magnetic single shot survey tool every 30 m.
Specification of the grid system
used.
Quality
and
adequacy
of
topographic control.
•
The initial siting of the drill hole position is based
on planned coordinates from the 3D data base
and GPS positioning in the field
•
Data spacing for reporting of
Exploration Results.
•
•
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
The spacing between new and existing drill holes
can range from a minimum of 50 m to 25 m
spaced collars.
Most drill holes at the Norton Deposit are inclined
at -70 degrees to the west holes.
•
•
Data
spacing
and
distribution
Commentary
•
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 12
Criteria
JORC Code Explanation
Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has
been applied.
Commentary
•
One hole drilled at Beta at -70 deg to the
northwest (315deg), and at the Keep Seismic
Target -70 to the west to better sample both
shallow and steeply dipping mineralised
structures considered significant to the
mineralisation.
•
It is not considered that there is a significant
sampling bias due to structure.
•
Whether the orientation of
sampling
achieves
unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
•
If the relationship between the
drilling
orientation
and
the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported
if material.
Sample
security
•
The measures taken to ensure
sample security.
•
Cores trays are stored and processed at a secure
facility at site. All samples taken by Boab
personnel to the truck depot in Kununurra and
placed on pallets wrapped in security plastic for
transport direct to ALS Laboratory in Perth.
Audits
or
reviews
•
The results of any audits or
reviews of sampling techniques
and data.
•
To be undertaken.
Orientation
of data in
relation to
geological
structure
_____________________________________________________________________________________________________________________________ _
Share your feedback
Discover