Highlights:
QUARTERLY REPORT TO 31 DECEMBER 2015
2015 Drilling program completed, with over 12,043 m of drilling
completed during the year.
Further significant sulphide zones sulphides intersected directly
along strike to the east and west from Maibele North Orebody.
Further zones of high-grade Ni-Cu mineralisation revealed in assays
received subsequent to the quarter.
Total strike length of drilled, continuous sulphide mineralisation is
approximately 1,375m, open in all directions.
Pre-Feasibility Study and EIA at Maibele North commence:
o the study will include a revised Resource Estimate.
Applications for 2-year extensions for the three JV PLs submitted
to the Department of Mines (DoM) in Botswana.
Drilling completed on BML’s 100% Owned PL 59/2008:
o Two holes intersect significant sulphide zones coincident
with SQUID conductor targets.
Cash Position:
Cash Balance at 31 December 2015 was ~$184,000. An Appendix 5B report
is attached.
Operational Highlights for the quarter.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
BML has four focused business objectives:
1. PL 110/94 MAIBELE NORTH:
TO EXPAND KNOWN RESOURCE FOR POTENTIAL MINING.
Grow and reclassify the current JORC resource status from
inferred to indicated or Measured by infill drilling and met
drilling.
Extend the known resource by step out drilling of new SQUID
TDEM and DHEM conductor targets.
Action:
The 2015 Drilling Program was completed during the quarter
with over 12,170m drilled for the year, 2348m in the quarter.
Numerous significant sulphide intersections returned both
from within, and along strike to the east and west of the
orebody.
Assay results continue to confirm high-grade Ni+Cu+Co
mineralisation in strong sulphide zones both within, and
outside of, the existing resource.
Strike of mineralisation extended over 475m to the east and
over 125m to the west.
Independent consultant commenced new Resource Estimate,
Pre-Feasibility Study and EIA.
Applications for 2-year extensions for the three JV PLs 110/94,
111/94 and 54/98 submitted to DoM in Botswana.
2. PL 54/98 TAKANE:
TO EXPLORE THE UNTAPPED POTENTIAL FOR SEVERAL NEW
DISCOVERIES
Action:
Trenching designed to enhance targets and facilitate drill hole
design commenced at the 4 priority prospects.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
The BML board believes this area has the potential to be declared a
new mineralised province located along the well-known Limpopo Belt
as it extends into Botswana on its eastern border from Zimbabwe.
3. PL 59/2008: 100% OWNED BY BML
TO EXPLORE FOR THE EASTERN EXTENSION TO MAIBELE NORTH ORE
BODY.
Action:
Three Hole, 775m drill program completed at Maibele North
Extension in October:
o Two holes intersect significant sulphide zones
coincident with SQUID conductor targets.
4. BML EXPLORATION PORTFOLIO:
TO GROW THE CURRENT PORTFOLIO FOCUSING ON THE EASTERN
BOARDER OF BOTSWANA ALONG THE LIMPOPO BELT.
1000sq km under licence of which
184sq km under JV with BCL Limited.
Action:
3000sq km of new PL applications were lodged in 2015 and are
pending processing by the DOM.
During the quarter, work continued on BML’s 100% owned PL
59/2008.
BML is committed to its total exploration portfolio of which 184km is under
JV with BCL Limited.
In 2015 BML made applications for several new prospecting licences that if
granted will significantly increase the total exploration area secured by BML
under its management.
The board strategy is to secure the most prospective ground along the
Limpopo belt where BML has accumulated in-depth geological and
geophysical knowledge during nearly 10 years of exploration. (see Figure 2)
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Progress achieved in the quarter to 31 December 2015:
SUMMARY
PL 110/94: Maibele North JV with BCL Limited
The JV completed the aggressive resource infill and extension drilling
program at Maibele North with a total of 12,043m completed to for 2015.
A total of 54 holes were completed.
Step out holes continue to intersect significant sulphides outside the
existing resource with mineralisation now extending to over 475m to
the east and over 125m to the west.
Total strike length of drilled, continuous mineralisation is
approximately 1,375m, open in all directions.
Step out holes have intersected significant sulphides:
o 200m beneath the known ore body.
o 250 m to the east of the known ore body.
o 480m to the north-east of the known ore body.
o 125m south west of the known are body.
It should be noted that none of the new extents of mineralisation have been
included in the 2015 Maiden Inferred Resource and will be considered for
the new resource estimate.
The drilling program also continued to confirm:
o Numerous thick sulphide intersections within the existing orebody.
o Highly encouraging sulphide intersections at SQUID EM conductor
targets along strike and adjacent to existing orebody.
o Evidence that the mineralising system continues at depth as well as
along strike to the east and west.
PL 54/98: Takane JV with BCL Limited
o A program of trenching at the priority SQUID TDEM targets
identified during the June 2015 quarter commenced in
preparation for drill testing in 2016.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
PL 59/2008: Shashe South
ABN 96 122 995 073
o A three Hole, 775m drill program completed at Maibele North
Extension in October:
o Two holes intersected significant sulphide zones coincident
with SQUID conductor targets.
Corporate:
Cash Position and Capital Raising
As at 31 December 2015 cash at bank was ~$184,000.
Exploration Activities for the December 2015 quarter:
Location Map and Schedule of Prospecting Licences held by BML.
Figure 1: Location of Botswana Metals Limited Exploration portfolio in Botswana
Exploration areas held in Botswana
The Company holds the following prospecting licences in Botswana:
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Tenement
Magogaphate
PL 110/94
Mokoswane
PL 111/94
Takane
PL 54/98
Shashe South
PL 059/2008
Central
PL 070/2008
Central Sampa
PL 111/2011
Renewal /
Expiry Date
Percentage
Holding
100
African Metals (Pty) Ltd
31/03/2016
100
African Metals (Pty) Ltd
31/03/2016
100
African Metals (Pty) Ltd
30/09/2016
100
African Metals (Pty) Ltd
30/09/2016
100
African Metals (Pty) Ltd
30/06/2014
100
African Metals (Pty) Ltd
31/03/2016
Title Holder
Comment
J/V with BCL Ltd
effective 01/04/14.
J/V with BCL Ltd
effective 01/04/14
J/V with BCL Ltd
effective 01/04/14
Renewal granted
until 30/09/16
Renewal granted
until 30/09/16
Renewal
application lodged
31/03/14
African Metals (Pty) Ltd is a wholly owned subsidiary of the Company.
Minerals Holdings (Botswana) Pty Ltd holds a 5% net profit share interest in PL 110/94,
PL 111/94 & PL 54/98.
PL 110/94, PL 111/94 and PL 54/98 were extended for a further two years to 31 March
2016.
On 1 April 2014 a Farm-In Joint Venture agreement with BCL Limited became effective
where BCL Limited can earn an initial 40% interest in 3 PLs based on making certain
expenditure commitments. If BCL Limited funds to the end of a Bankable Feasibility Study
then BCL can earn a 70% equity interest in the 3 JV PL’s being 110/94, 111/94 and 54/98.
Several new PL applications were lodged with the Department of Mines in the March
2015 quarter which are still being processed. These are shown in light green in figure 2
below.
Prior to the end of the December quarter, the Company submitted 2-year extension
applications for the JV PLs 110,94, 111/94 and 54/98, in accordance with the
requirements of the Mining Act in Botswana.
Other than the details above, the Company did not acquire or dispose of any other
tenements or beneficial interests in farm-in agreements during the quarter.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 2: BML exploration tenement portfolio in Botswana. Prospecting Licences subject to the Joint
Venture with BCL are shaded light blue.
JOINT VENTURE EXPLORATION ACTIVITIES FOR THE QUARTER
LODGEMENT OF EXTENTION APPLICATIONS FOR THE 3 PROSPECTING LICENCES UNDER
JOINT VENTURE WITH BCL LIMITED.
Prior to 31 December 2015, BML lodged three extension applications with the
Department of Mines (DOM) in Botswana for PL 110/94, PL 111/94 and PL 54/98, in
accordance with Botswana’s Mines and Minerals Act (1999). These three Prospecting
Licences (PL’s) are currently under Joint Venture with BCL Limited. It is expected that the
DOM will advise the company of the outcome of its applications after the licences expire
on 31 March 2016 (most likely in the second quarter of 2016).
WORK PROGRAM – PL 110/94 - Maibele North
During the December 2015 Quarter, the Joint Venture partners, BCL Limited, completed
the extensive program of Infill, Metallurgical and Extension drilling at the Maibele North
deposit. Totalling 12,043m the program was divided between in-resource drill holes and
extension holes targeting the number of significant conductor targets along strike and
adjacent to the main orebody (Figure 3, Table 3). A total of 2347.5m was completed
during the December quarter.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 3: shows the Maibele North orebody and in yellow the 54 holes completed in the 2015 program.
The pink shapes represent modelled SQUID conductors. The figure outlines the extents of mineralisation
intersected along strike to the east and west. These new discoveries bring the total strike of drilled
mineralisation to approximately 1375m.
The focus of the program was to both upgrade and grow the JORC-compliant Inferred
resource that was announced to the market during the March quarter. The estimate was
performed by independent consultants, MSA South Africa, from an extensive drill
program undertaken in 2014 in conjunction with BML’s Joint Venture partners BCL
Limited.
At a 0.3% Ni cut-off the resource stands at:
Cut-off (%Ni) Tonnes (Mt) Ni (%) Cu (%) Pt (g/t) Pd (g/t) Rh (g/t) Ru (g/t) Au (g/t)
0.30
2.38
0.72 0.21 0.08
0.36
0.04
0.05
0.10
By the end of December, a total of 54 holes had been completed for a total of ~12,043m
drilled at Maibele North during 2015.
Receipt of all assay results will facilitate an upgrade of the current resource status and
will also indicate the potential to increase the resource along strike and at depth.
The drill program continued to intersect broad zones of sulphide mineralisation within
the Maibele North orebody as well as significant massive and disseminated sulphide
zones along strike to the east and west. The continuing good results are extremely
encouraging and demonstrate the size and potential of the mineralised system at
Maibele North. The strong commitment of the Joint Venture partners, BCL Limited, to
progressing Maibele North shows the importance of this resource to potentially add
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
additional tonnes for processing at the nearby Selebi Phikwe plant and smelter. The
results have so far highlighted the potential to upgrade the resource to an Indicated or
Measured status and also the great potential to increase the resource size with
additional sulphide zones discovered along strike and at depth.
Highlights of the December Quarter drilling include:
Table 1: All Significant sulphide intersections from the holes completed in the December quarter
HOLE ID
MADD0143
MADD0144
MADD0145
TOTAL
Min
Min
DEPTH
WIDTH
TYPE
FROM
TO
(m)
Extension to East
250 219.74 220.30 0.56 Disseminated
Extension to East
300
Extension to East
280 254.37 255.20 0.83 Sulphide stringers
PURPOSE
COMMENTS
Moderate
No significant intersection
Incl. 0.15m massive and
Massive and Semi0.14m + 0.72m semi
massive sulphide
massive
MADD0147 Extension to East 323.3 189.13 189.6 0.47 Sulphide stringers
Massive sulphides
MADD0148 Extension to East 302.35 278
283
5
and stringers
MADD0149 Extension to East 253.0
No Sig Int.
Stopped Short of min?
Weak to mod
MADD0150 Extension to East
320 274.20 278.71 4.51
disseminated
Weak to mod
MADD0151 Extension to West 260.3 201.55 224.00 22.45
Numerous stringers
disseminated
Weak to mod
MADD0152 Extension to West 158.3 129.90 137.00 7.10
disseminated
*Note: All intersections are quoted as down-hole lengths
MADD146
Extension to East
292
251.15 255.52
4.37
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 4: Results from drill holes completed during the December 2015 Quarter
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Assays
A total of 403 samples were prepared and submitted for assay during the quarter. The
first batch of assay results were received during the September quarter and significant
results are included in the table 2 below.
All outstanding results are expected during 2016 and will be released when received.
Table 2: All Significant intercepts from the recently received first batch of assay results
Hole ID
MARD0103
From
(m)
112.47
Thick
(m)
4.26
1.07
incl.
114.47
0.83
incl.
and
112.47
0.75
Ni%
0.39
Co
ppm
611
Au
g/t
0.08
Pt
g/t
0.04
Pd
g/t
0.37
Rh
g/t
0.08
Ru
g/t
0.18
1.44
0.49
766
0.07
0.06
0.52
0.11
0.31
2.09
0.88
134.86
133
5.23
3.37
2.67
0.53
MARD0108
208.33
1.36
0.79
0.24
0.34
1140
MARD0101
119.28
3.17
0.71
incl
119.96
0.56
2.89
incl
208.33
119.28
0.36
1.24
2.07
1.58
0.4
1260
incl.
incl.
1.85
Cu%
0.08
0.1
1.15
485
0.02
0.11
0.14
299
0.03
0.06
1040
0.01
0.27
599
110.54
0.98
2.64
0.48
1330
1410
MARD0105
171.32
3.55
0.55
0.25
318
and
181.73
1.52
0.24
0.25
159
0.2
0.05
181
and
MARD0112
115.46
178.59
185
0.29
0.62
3
2.5
1.59
0.05
852
1196
MARD0104
and
0.09
0.26
0.2
712
0.01
0.01
0.02
1.06
0.66
0.63
0.26
0.04
0.08
0.06
0.23
0.04
0.17
0.01
0.7
0.17
0.72
0.13
0.39
0.03
0.09
0.64
0.46
0.09
0.13
0.41
0.07
0.01
0.67
0.7
0.16
0.03
0.06
0.16
0.02
0.02
0.68
0.3
0.05
0.17
0.02
0.03
0.03
0.03
0.02
0.01
0.56
0.43
0.45
0.05
387
MARD0113
171
16.58
0.18
0.39
0.1
0.16
169
359
0.2
0.03
0.2
MARD0106
357
2
0.14
0
119
0.01
0.01
0.05
0.58
0.1
0.3
187.57
187
0.2
0.27
incl
incl.
0.07
0.34
0.1
0.01
0.9
0.16
0.23
0.05
Comment
RESOURCE
INFILL HOLES
0.25
0.07
0.05
0.04
0.01
0.02
0.01
0.01
0.01
0.01
RESOURCE
EXTENSION
HOLES
Note: Holes MARD00100, 102, 107, 109 and 110 returned no significant intersections
above 0.3%Ni. All widths are down hole thicknesses.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Assay Results Received Subsequent to the end of the December Quarter
Botswana Metals Limited was pleased to receive a second batch of assay results from
Joint Venture partners, BCL Limited, for the ~12,000m drilling campaign completed in
2015 at Maibele North. (Table 3 – Significant Intersections). The company received
results from further 26 completed infill and extension holes from assays that were
undertaken at an offsite independent laboratory as well as from onsite analysis at BCL’s
in-house laboratory facilities at both the Tati-Ni and Selebi Phikwe Ni-Cu mines during
mid-January. Results from the final 5 holes are all that remain to complete the analysis
of the program.
Highlights of the second batch of assay results include:
MARD0122:
4.0m @ 1.80% Ni, 0.59% Cu, 882 ppm Co, 0.08g/t Au, 1.51g/t 4PGEs from
134.23m.
Including:
o 1.59m @ 2.17% Ni, 0.74% Cu, 1,054ppm Co, 0.06g/t Au, 2.07g/t 4PGEs from
134.23m.
o 1.23m @ 2.21% Ni, 0.4% Cu, 1,040ppm Co, 0.04g/t Au, 1.64g/t 4PGEs from
137m.
MARD0129:
2.18m @ 1.55% Ni, 1.28% Cu, 917 ppm Co from 200.27m.
Including:
o 1.03m @ 2.17% Ni, 2.22% Cu, 1,300ppm Co from 200.27m.
o 0.40m @ 1.7% Ni, 0.38% Cu, 900ppm Co from 202.05m.
(note: Assays performed at BCL Limited in-house laboratory - Au and PGEs not
assayed for)
MARD0127:
0.59m @ 2.35% Ni, 0.56% Cu, 1130 ppm Co, 0.12g/t Au, 1.05g/t 4PGEs from
73.46m.
MARC0099:
1.0m @ 2.27% Ni, 2.02% Cu from 240m.
(Note: Assays performed at BCL Limited in-house laboratory - Co, Au and PGEs not
assayed for. MARC0099 is a RC hole)
MARD0146:
0.14m @ 2.13% Ni, 0.15% Cu from 252.58m.
0.72m @ 1.17% Ni, 0.54% Cu from 254.80m.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
(Note: Assays performed at BCL Limited in-house laboratory - Co, Au and PGEs not
assayed for)
All widths are down hole thicknesses. A full compilation of significant intersections is
included in Table 3 below. Samples assayed at BCL’s in-house facilities were analysed
mostly at the laboratory at the Selebi Phikwe Ni-Cu mine, with checks undertaken at the
company’s Phoenix Laboratory at the Tati Ni Mine. The Phoenix laboratory at Tati-Ni is
SANAS accredited to the ISO 17025 international standard. The laboratory at the Selebi
Phikwe Ni-Cu mine is currently un-certified. Identical QAQC protocols were applied to
samples for all three laboratories and QAQC results were deemed to be acceptable for
all sample batches.
The drilling of SQUID EM conductors along strike to the east of the resource has returned
laterally continuous mineralisation for over 480m. Drilling of this extension is in the early
stage but the series of 80m spaced fences of have intersected sulphide mineralisation
that remains open at depth and along strike. This exciting new zone of mineralisation
has the potential to add significant tonnes to the Maibele North resource. Further deep
potential exists at Maibele North, with the mineralisation open at depth across the entire
deposit to date.
Of particular encouragement is the intersection in 2014 drill hole MARD0094, where
nearly 7m of Ni sulphide mineralisation was intersected some 200m below, and
potentially down-dip, of the recently discovered extension zone (Figures 5 and 6).
Figure 5: Plan view of the 2015 drill hole traces (yellow) showing the highlight intersections from
the recent batch of assay results. Pink shapes represent SQUID EM conductor plates.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 6: Cross section through holes MARD0116, 0146, 0025 and 0094. The section is located
approximately 180m northeast of the current resource and shows the relationship between
recently discovered massive and semi-massive sulphide mineralisation hole MARD0116 and
MADD0146. Hole MARD0094 was drilled in 2014 and possibly marks the extension of this
mineralisation, some 320m down dip and ~225m vertically below the recently discovered sulphide
zone. Historic hole, MADD0025, intersected minor pyrrhotite disseminations approximately 130m
down dip of MADD0146.
The Board of Botswana Metals is highly encouraged by the continuing good results from
the Maibele North Project. This batch of results has continued to return encouraging Ni,
Cu, Co, Au and 4PGE (Pt, Pd, Rh, Ru) from sulphide zones both within the existing
resource and along strike for over 400m to the east of the current resource. The results
now complete assaying on holes from MARC0099 through to MADD0146. Results from
the final five holes, MADD0147 to MADD0152 remain outstanding.
Table 3: All Significant intercepts from the recently received batch of assay results
Hole ID
From
Thick
Ni% Cu% Co
Au
Pt
Pd
Rh
Ru
(m)
(m)
ppm g/t
g/t
g/t
g/t
g/t
MADD0117* 92
0.65
0.31 0.07 n/a
n/a n/a n/a n/a n/a
and 188.8 1
0.33 0.07 n/a
n/a n/a n/a n/a n/a
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
Comment
ABN 96 122 995 073
Hole ID
MARD0100*
and
MARD0119
and
and
incl
and
MARD0121*
MARD0122
and
incl
incl
and
MARD0123*
MARD0125*
MARD0126
MARD0127
MARD0128
MARD0130
MARD0131
MARD0132
and
MARD0134*
MARD0135
MARD0136
MARD0138*
MADD0140*
MADD0143*
and
MADD0145*
MADD0146*
incl
incl
MADD0148*
incl
MARC0099*
and
MARD0115
From
(m)
126
130
137
140.52
146.1
147
151.5
NSR
127.55
134.23
134.23
137
139.88
NSR
NSR
74
73.46
162
174.72
66.42
NSR
67.3
76
NSR
NSR
NSR
228
NSR
219.74
225
256
251.15
252.58
254.8
279
279.82
240
245
NSR
Thick
(m)
1
1
1
1.24
1.9
1
0.35
Ni%
Cu%
0.04
0.06
0.29
0.69
0.27
0.34
0.05
Co
ppm
n/a
n/a
263
352
589
874
367
Au
g/t
n/a
n/a
0.03
0.07
0.03
0.03
0.02
Pt
g/t
n/a
n/a
0.07
0.02
0.03
0.03
0.02
Pd
g/t
n/a
n/a
0.19
0.32
0.38
0.56
0.04
Rh
g/t
n/a
n/a
0
0.08
0.1
0.14
0.06
Ru
g/t
n/a
n/a
0.07
0.1
0.18
0.25
0.12
0.35
4
1.59
1.23
1.12
1.85
1.8
2.17
2.21
0.33
0.1
0.59
0.74
0.4
0.08
880
882
1054
1040
208
0.03
0.08
0.06
0.04
0
0.07
0.07
0.05
0.03
0.03
0.59
0.8
1.02
0.83
0.12
0.24
0.18
0.27
0.14
0.02
0.72
0.46
0.73
0.33
0.04
0.65
0.59
1
0.32
0.9
1.22
2.35
0.35
1.84
0.66
0.48
0.56
0.06
0.16
0.25
594
1130
242
541
360
0.09
0.12
0
0.19
0.01
0.05
0.04
0.04
0.33
0.03
0.48
0.81
0.19
0.89
0.25
0.11
0.2
0.07
0.24
0.04
0.29
0.59
0.22
0.58
0.03
1.7
2.1
0.52
0.38
0.06
0.09
362
222
0.02
0.04
0.04 0.15 0.03
0.06 0.22 0.02
0.04
0.01
1
0.4
0.02
300
n/a
n/a
n/a
n/a
n/a
0.46
0.52
2
4.37
0.14
0.72
2
0.28
1
1
0.37
0.3
0.74
0.38
2.13
1.17
0.66
1.06
2.27
0.76
0.2
0.08
0.1
0.12
0.15
0.54
0.87
0.47
2.02
0.18
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
0.35
0.34
0.39
0.47
0.99
1.42
0.73
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
Comment
RESOURCE
INFILL
HOLES
RESOURCE
EXTENSION
HOLES
ABN 96 122 995 073
Hole ID
From
Thick
(m)
(m)
MARD0116
206.59 0.35
MARD0129* 200.27 2.18
incl 200.27 1.03
incl 202.05 0.4
NSR = No Significant Result
Ni%
2.06
1.55
2.17
1.7
Cu%
0.41
1.28
2.22
0.38
Co
ppm
914
917
1300
900
Au
g/t
0.14
n/a
n/a
n/a
Pt
g/t
0.05
n/a
n/a
n/a
Pd
g/t
0.99
n/a
n/a
n/a
Rh
g/t
0.15
n/a
n/a
n/a
Ru
g/t
0.2
n/a
n/a
n/a
Comment
* Holes marked by an asterisk were analysed at BCL Limited’s in-house mining laboratory at the
Selebi Phikwe Ni-Cu mine, with checks undertaken at the company’s Phoenix Laboratory at the
Tati Ni Mine. All other holes were assayed by SGS South Africa. Identical QAQC protocols and
sample handling/preparation techniques were employed across all holes. QAQC analysis for all
samples from each laboratory was deemed to be within acceptable limits. The BCL Limited
laboratory at Tati-Ni is SANAS accredited to the ISO 17025 international standard. The in-house
laboratory at the Selebi Phikwe Ni-Cu mine is currently un-certified.
Feasibility Study
During the September Quarter the Joint Venture partners appointed Worley Parsons RSA
(Pty) Ltd to perform a Pre-Feasibility Study on the Maibele North Project. AquaLogic was
also appointed to carry out an Environmental Impact Assessment (EIA) at the project.
These appointments confirm the Joint Venture plan is to complete a Pre-feasibility study
in order to proceed to a Bankable Feasibility in preparation for a mining licence
application.
The Botswana Metals Board is extremely pleased with BCL’s decision to progress to
Feasibility Studies at Maibele North. The aggressive 2015 drilling campaign is now
complete, and will allow the reclassifying of the known resource from a JORC inferred
status to a JORC indicated or measured status to facilitate the Study. Feasibility and EIA
studies are necessary requirements in the application for a mining licence with the
Department of Mines in Botswana.
Table 4: Details of holes drilled to 31 December 2015 from the Maibele North Prospect
Hole ID
MARC0099
MARD0107
MARD0106
MARD0100
MARD0101
MARD0102
MARD0104
East (UTM)
633088
633823
632301
632235
632357
632455
632492
North (UTM)
7595875
7595878
7595148
7595389
7595477
7595457
7595541
Dip
-60
-75
-60
-55
-55
-55
-55
AZI
335
335
330
330
330
330
330
Botswana Metals Limited
Depth (m)
255.00
550.40
376.18
183.05
140.10
175.05
125.10
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
RL
849
851
840
841
849
843
842
ABN 96 122 995 073
Hole ID
MARD0105
MARD0103
MARD0110
MARD0126
MARD0127
MARD0123
MARD0130
MARD0108
MARD0136
MARD0109
MARD0132
MARD0133
MARD0134
MARD0131
MARD0137
MARD0122
MARD0119
MARD0128
MARD0135
MARD0139
MARD0124
MARD0121
MARD0125
MARD0120
MARD0138
MADD0117
MADD0111
MADD0118
MADD0142
MADD0141
MARD0113
MARD0112
MARD0115
MARD0114
MARD0116
East (UTM)
632688
632285
632523
632436
632391
632432
632285
632384
632314
632367
632082
632111
632124
632163
632630
632611
632642
632731
632196
632692
632781
632512
632581
632800
632734
632258
632340
632340
632546
632711
633128
633081
633036
633172
632943
North (UTM)
7595596
7595434
7595492
7595546
7595532
7595400
7595515
7595354
7595274
7595405
7595359
7595296
7595378
7595393
7595499
7595586
7595588
7595636
7595334
7595511
7595551
7595615
7595638
7595610
7595520
7595346
7595376
7595376
7595453
7595556
7595916
7595891
7595864
7595941
7595734
Dip
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-60
-55
-55
-60
-55
-55
-55
-55
-55
-55
-60
-60
-60
-60
-60
AZI
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
Botswana Metals Limited
Depth (m)
203.10
156.75
180.06
110.00
110.15
242.30
80.20
227.1
275.60
212.05
95.15
140.15
92.20
124.2
220.00
150.06
170.10
200.20
170.20
246.00
300.90
85.20
100.00
260.00
263.25
229.56
19.23
260.12
240
270
215.10
244.13
250.15
185.02
248.15
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
RL
846
845
844
845
839
846
850
843
840
846
846
847
845
844
844
849
845
851
844
847
849
849
851
850
851
842
847
847
845
850
859
850
848
852
851
ABN 96 122 995 073
Hole ID
MARD0129
MADD0140
MADD0144
MADD0143
MADD0145
MADD0146
MADD0147
MADD0148
MADD0149
MADD0150
MADD0151
MADD0152
East (UTM)
632868
632807
632971
633152
632894
632966
632992
633132
633067
633218
632048
632015
North (UTM)
7595699
7595614
7595791
7595866
7595656
7595689
7595757
7595810
7595807
7595856
7595209
7595275
Dip
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
Regional Potential of Maibele North Trend
AZI
330
330
330
330
330
330
330
330
330
330
330
330
Depth (m)
245.60
250
296
250
280
292
323.3
302.35
253
320
260.3
158.3
RL
853
853
853
853
854
853
850
849
856
857
846
846
Examination of regional geological and geophysical images shows linear features that
correlate strongly with the zone of mineralisation and extend a considerable distance to
the east towards the Maibele North Extension prospect and further still towards the
Mashambe Prospect (see Figure 5). Both prospects are marked by prominent VTEM
anomalism and the presence of ultramafic lithology and geochemical anomalies. PL
59/2008 “Maibele Extension and Mashambe lie some 5km and 6km respectively east of
the Maibele “new zone” and exhibit similar surface geological indicators to those at
Maibele North that mark the presence of significant Ni + Cu + PGEs mineralisation.
PL 59/2008 is 100% owned by BML and not currently subject to the JV with BCL.
The same linear trend can be traced 5km to the west of Maibele North and Airstrip
Copper to VTEM Anomaly 10380a, where a single historic drill hole into a conductor plate
returned 0.3%Ni in sulphides down hole.
Evidence is mounting that Maibele North – Airstrip Copper lie on a regional geological
horizon of at least 16km in length prospective for Ni-Cu sulphide mineralisation and
containing a number of prominent conductive anomalies associated with ultramafic
lithology. BML believes this trend is grossly under explored.
Botswana Metals Limited
Suite 3, 16 Cotham Road, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 7: Regional perspective view from above, looking northeast, of the linear horizon along which the
Maibele North-Airstrip mineralised trend lies. Background image is VTEM db/dt Tau and shows numerous
prominent conductive anomalies along the horizon. Sulphide Ni mineralisation has been intersected
Share your feedback
Discover