BML Updated July 2015 Presentation
Released
Released
Announcement PDF
ABN 96 122 995 073
ASX Code: BML
TO:
COMPANY ANNOUNCEMENTS OFFICE
ASX LIMITED
DATE:
14 JULY 2015
BML UPDATED INVESTOR PRESENTATION
Please find updated BML Presentation for July 2015 attached.
For further information contact:
Mr Patrick Volpe
Chairman
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
BML – WITH THE RIGHT METAL AND THE RIGHT
PARTNER IN THE RIGHT PLACE.
INVESTOR PRESENTATION
July 2015 UPDATE
BOTSWANA METALS LIMITED PROFILE (ASX: BML)
DISCLAIMER
GENERAL DISCLAIMER
This presentation has been prepared by Botswana Metals Limited
(“BML”). The information contained in this presentation is for
informational purposes only and does not constitute an offer to issue, or
arrange to issue, securities or other financial products. The information
contained in this presentation is not investment or financial product
advice and is not intended to be used as the basis for making an
investment decision. The presentation has been prepared without taking
into account the investment objectives, financial situation or particular
needs of any particular person. No representation or warranty, express
or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in
this presentation. To the maximum extent permitted by law, none of BML,
its directors, employees or agents, not any other person accepts any
liability, including, without limitation, any liability arising out of fault of
negligence, for any loss arising from the use of the information
contained in this presentation. In particular, no representation or
warranty, express or implied is given as the accuracy, completeness or
correctness, likelihood of achievement or reasonableness or any
forecasts, prospects or returns contained in this presentation nor is any
obligation assumed to update such information. Such forecasts,
prospects or returns are by their nature subject to significant
uncertainties and contingencies. No representation is made that, in
relation to the tenements the subject of this presentation, BML has now
or will at any time in the future develop further resources or reserves
within the meaning of the Australian Code for Reporting of Exploration
Results, Mineral resources and Ore Reserves (The JORC Code).
Before making an investment decision, you should consider, with or
without the assistance of a financial adviser, whether an investment is
appropriate in light of your particular investment needs, objectives and
financial circumstances. You should have consideration to the risks
involved in investment in BML some of which are detailed in BML’s
prospectus dated 26th October 2007 as lodged with the Australian
Securities and Investment Commission and available from either
Australian Securities Exchange Limited or BML on request.
By accepting this presentation, the recipient represents and warrants
that it is a person to whom this presentation may be delivered or
distributed without a violation of the laws of any jurisdiction.
This presentation is not to be disclosed to any other person or used for
2
any other purpose and any other person who receives this presentation
should not rely or act upon it. Information contained in this presentation
is confidential information and the property of BML. It is made available
strictly for the purposes referred to above. The presentation and any
further confidential information made available to any recipient must be
held in complete confidence and documents containing such information
may not be reproduced, used or disclosed with the prior written consent
of BML.
This presentation must not be disclosed, copied, published, reproduced
or distributed in whole or in part at any time without the prior written
consent of BML and by accepting the delivery or making to it of this
presentation, the recipient agrees not to do so and to return any written
copy of this presentation to BML at the request of BML.
COMPETENT PERSONS STATEMENT
Information in this presentation that relates to BML Exploration Results,
Exploration Targets, geology, drilling and mineralisation is based on
information compiled by Peter Temby, an employee of Anpet Exploration
Pty Ltd and/or Steve Groves who are both Members of the Australian
Institute of Geoscientists. Both Mr Temby and Mr Groves have sufficient
experience that is relevant to the style of mineralization and type of
deposit under consideration and to the activities that he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Both Peter Temby and Steve Groves have
consented to the inclusion in this presentation of matters based on their
information in the form and context in which it appears.
Information in this report that relates to exploration results where %Ni
Equivalent results have been calculated is based on information
compiled by Mr Steven Groves in compliance with 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.”. All other Exploration Results included in
this report have previously been released publicly in compliance with
the JORC Code 2004 and have not materially changed since the original
disclosure.
JV PRIORITY OBJECTIVE IS TO INCREASE RESOURCE AT MAIBELE NORTH
Cut-off (Ni)
Tonnes (Mt)
Ni (%)
Cu (%)
Pt (g/t)
Pd (g/t)
Rh (g/t)
Ru (g/t)
Au (g/t)
0.30
2.38
0.72
0.21
0.08
0.36
0.04
0.05
0.10
At 0.3% Cut-off determined by economic parameters from Selebi Phikwe Mine
•
Aggressive 12,500m drill program
well underway
Step out Hole (recently drilled)
MARD0099
Intersected 5m sulphide mineralisation
down hole
• Designed to increase resource
SQUID EM
Conductor Plate
Step out Hole (drilled 2014)
MARD0094
6.82m Ni mineralisation intercept
Step out Hole (recently drilled)
MARD0106
Intersected cumulative sulphide
mineralisation 25m down hole (2 zones)
3
Maibele North orebody and in red the 12 additional step out holes
that will be drilled in addition to the 5 step out holes shown in blue.
3
• Designed to increase confidence
level of known resource (inferred
to indicated)
• Designed to optimise
metallurgical processes
• Designed to test strong SQUID
EM anomalies along strike to
potentially extend orebody
CORPORATE OVERVIEW
BOTSWANA METALS LIMITED PROFILE (ASX: BML)
Botswana Focus with BCL – THE RIGHT PARTNER IN THE RIGHT PLACE
JV Funding – Maiden Resource – Potential New discoveries = De-risked opportunity
Current Share Price
A$0.008
Shares On Issue*
568 million
Options on Issue
(ex price at 1.5c to 31 Dec 2016)
410 million*
Performance shares
3.5 million
Cash at 31 March 2015
~A$.35million
Debt
9/07/15
NIL
*SPP to up to $1.2m open until 17 July
Market Capitalisation
(undiluted for options)
Enterprise value
(31 Dec 2014)
~A$4.5million
A$7.5 million
Low cash burn rate (~A$130k in March qtr)
4
52 week trading range – ord shares
0.6c to 4.5c
Average daily vol
4 million
Top 20 (1st May 2015)
45%
Management
18%
(based on past 12 months)
BML TEAM: WE KNOW BOTSWANA
BOARD OF DIRECTORS AND MANAGEMENT
• Mr Patrick Volpe – Chairman (~12.5% equity)
• Dr Paul Woolrich - Non-Executive Director (~0.5%)
• Mr Massimo Cellante - Non-Executive Director (~5%)
• Mr Steve Groves - GM Exploration
• Mr Elvis Mosweu – Country Manager
Excellent relationships with Local Stakeholders
• Department of Mines
• BCL Limited- World Class Nickel mining and smelting operation
• Local tribal chiefs
• Local suppliers for BML
• Local institutions and Botswana Exchange
OVER 100 YEARS
EXPERIENCE IN BOTSWANA
WE KNOW BOTSWANA
Board Members and Management have been instrumental in:
• Discovery of one the largest U discoveries in the world (A-Cap Resources)
• First discovery of graphite mineralisation in Bots (QPene)
• Recent Discovery potash (Cambow)
• Biggest Gold Mine in Botswana (Mupane Gold Mine)
• Discovery of several very large coal deposits in Botswana (A-Cap Resources)
BML Team operates in Australia and Botswana
5
BCL – THE RIGHT PARTNER
• BCL is an international mining company owned by the Botswana Government
• BCL is hungry for ore after mining 175Mt to 1km depth over past 50 years
• BCL Mining and Smelting Operation:
• supports a town of over 50,000 people
• employs 5000 people from the local area
• BML Joint Venture
• is a priority exploration play for BCL
• only 55KM from BCL mining operation
• BCL providing open chequebook until completion of BFS (subject to positive Scoping
Study)
• BCL also funding exploration for potential new discovery areas at Takane
• BCL have first right of refusal over any new discoveries outside JV
• Offtake agreement is in place with BCL
6
WHY INVEST IN BML – A LEVERAGED EMERGING NICKEL PLAY
BCL Joint Venture funding provides shareholders a de-risked opportunity to
participate in early cash flow
And
Potential to declare Eastern Botswana a new mineralised province
• BML leveraged to Ni price
• Aggressive 12,500m drill program well underway at Maibele North
• Potential to significantly increase resource and resource status
• Takane expected to contain new drill targets
• BCL open chequebook until completion of BFS (subject to positive Scoping Study)
• Potential to make new discovery on PL59/2008 100% owned by BML (to be funded by
SPP)
• BML Board strategy to allow shareholders to participate where possible (SPP in
progress – attractive offer to shareholders at $0.0075 )
• Positive drill results should re-rate BMLs market cap
• Current low market cap of only $4.5m
7
THE RIGHT METAL – BML EXPLORING FOR NI AND CU
• Reduction in global supply of Ni – e.g. Indonesian decision for mandatory in-country
smelting
• In the short term: build up of inventories in China and increased exports (e.g. supply from
Philippines) are headwinds for the nickel price.
• Indonesia expected to keep export ban in place and drive investment in NPI plants in-country
• LME stockpiles have been increasing but are stabilising in 2015
• Ni world market balance predicted to be in deficit from mid – late 2015
• Most forecasters predicting Ni price rises in med/long term
Predicted global
supply deficit
8
The last LME deficit (2006) was 51k tonnes – Ni price moved to $35k/tonne!
8
PROTEROZOIC MOBILE BELTS – LIMPOPO ANALOGUES
Limpopo Mobile Zone
Ultramafic Volcanism ~ 2.05Ga (similar age to Bushveld?)
Selebi Phikwe (BCL Mine)
175 Mt @ 0.81% Ni, 0.85%
Cu
Messina Cu (Karoo?)
40Mt @ ~1.75% Cu
(historical est.)
Circum-Superior Belt
Ultramafic Volcanism ~ 1.88Ga
Thompson Belt
120Mt @ 2.1% Ni
Raglan Deposits
35Mt @ 2.9% Ni
Albany – Fraser
Ultramafic Volcanism ~1.3Ga
Nova-Bollinger
14.3Mt @ 2.4%Ni,
0.9%Cu, 0.08%Co
Tropicana Gold
117 Mt @ 2.06g/t
Au
Limpopo Mobile Belt in Botswana Chronically Underexplored!
• Maibele North ~50km away from Selebi Phikwe where 175Mt have been mined
• BMLs Portfolio contains up to 32km strike length of the same geology
9
JV COVERS 180 SQKM OF BML EXISTING 1000SQKM PORTFOLIO
If granted, new applications will increase portfolio threefold
BML – BCL JV PLs
•
All BML Prospecting Licenses are within the Limpopo Mobile Belt in Eastern Botswana
10
10
OVERVIEW OF EXPLORATION PROSPECTS
PL59 VTEM Anomalies
100% BML
Maiden Resource
2.38MT
3D Perspective – Looking NE from above
Image: VTEM-dbdt-tau
•
16km long mineralised trend encompassing
•
11
10780a ,10830a, Airstrip Ni, Maibele North, Maibele New, Maibele Extension (*100%)
Mashambe (100%)
SQUID EM SUCCESSFUL FOR TARGETING NEW MINERALISATION
• 17 step out holes to be drilled (3 completed)
• Every hole targeting SQUID EM anomalies
has encountered sulphide mineralisation
• Three holes drilled to date have missed
conductor targets yet still intersected
significant sulphide mineralisation
• Anomalies extend to at least 200m below
current resource and up to 1km along strike
12
Long Section, looking northwest
PL54/1998 TAKANE – POTENTIAL NEW DISCOVERY BELT
Image: VTEM-dbdtz-35
Mak T1
Jum T1
KuduT1
KuduT2 & T3
Mmats T1
Cu Anomaly >100ppm
13
Mapped Ultramafic Intrusion
Modelled VTEM conductor plate
Takane to test similar anomalies to the Sirius Resources Nova –
Bollinger discovery
BML - PL54 Targets
• “Eye” Magnetic feature ~ 4km long
• ~2km long Cu and Ni Soil anomaly
• Peak Cu mostly 120 – 200ppm
• Peak Ni mostly 200 – 500ppm
• A number of discrete EM conductor plates
associated with soil and magnetic anomaly
Ni Anomaly >500ppm (figs 2x scale)
14
BML HAS 100% OWNED PLS WITH POTENTIAL FOR ADDITIONAL DISCOVERIES
• BCL has first right of refusal of any new discovery outside JV ground
• New discoveries on this belt would be a game changer for BML shareholders
100% BML
15
WHY INVEST IN BML – A LEVERAGED EMERGING NICKEL PLAY
BCL Joint Venture funding provides shareholders a de-risked opportunity
to participate in early cash flow
And
Potential to declare Eastern Botswana a new mineralised province
• BML leveraged to Ni price
• Aggressive 12,500m drill program well underway
• Designed to increase orebody
• Strong SQUID EM anomalies along strike with potential to extend orebody to be tested
• Designed to increase confidence level of known resource (infill drilling to indicated status)
• Designed to collect additional samples to optimise metallurgical processes
• Positive drill results should re-rate BMLs market cap
• Takane expected to contain new drill targets
• Completed ground geophysics shows targets with similar features to Fraser Range in WA
• BCL open chequebook until completion of BFS (subject to positive Scoping Study)
o Maiden Inferred JORC Resource of 2.38Mt at Maibele North with potential to grow quickly
16
CONTACT:
Registered Office:
Suite 506, Level 5,
1 Princess Street
Kew VIC 3101 Austraila
Telephone: +61 3 9855 1885
Facsimile: +61 3 9855 2885
info@botswanametals.com.au
www.botswanametals.com.au
Mailing Address;
Suite 3,
16 Cotham Road
Kew VIC 3101 Australia
BML-WITH THE RIGHT METAL AND THE RIGHT PARTNER IN THE RIGHT PLACE
17
Share your feedback
Discover