Up to 31m of nickel sulphides intersected at Maibele North
Released
Released
Announcement PDF
ABN 96 122 995 073
TO:
COMPANY ANNOUNCEMENTS OFFICE
ASX LIMITED
DATE:
17 JUNE 2015
ASX Code: BML
Up to 31m of nickel sulphides intersected at Maibele North.
SUMMARY:
Maibele North 8000m + aggressive drill program commences in June 2015.
Three holes now completed.
More significant sulphide mineralisation encountered in holes:
MARD0103:intersected a cumulative 31m down-hole zone of sulphide mineralisation including:
9.2 m from 112.5m and a thicker section of 21m from 125m
MARD0101: intersected 4.6m of sulphide mineralisation from 119m
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 1: Plan map of proposed met and infill holes designed to lift the JORC resource category to indicated.
Details:
The Board of Botswana Metals Limited (BML) is pleased to announce the progress of the first
three infill metallurgical (met) holes now completed.
An aggressive 8000m drill program commenced in June 2015 designed to:
o infill the known resource to lift the JORC category from inferred to indicated
o provide more met work samples for testing and optimising the ore performance with the BCL
plant.
o Step out drilling to potentially increase the known resource
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Figure 2: shows the planned step out holes (red traces) up to 1km away from the known ore body - if mineralisation is
encountered in these holes the potential size of the orebody could increase significantly
MARD0103: Several zones of disseminated, semi-massive and massive sulphide mineralisation were
intersected between 112.47m to 121.67m (9.2m down-hole) and 125.36m to 147.27m (21.91m downhole).
This met/infill drill hole planned to target the thick mineralisation zone behind MADD058.
MARD0101: Mineralisation was intersected between 119.28 and 123.91m (4.63m down hole) including
0.56m thick zone of massive sulphides.
MARD0100: did not encounter any significant visual sulphides.
The market will be kept informed on progress of the drilling
For more information:
Pat Volpe
Chairman
Tel: +61 3 9855 1885
Fax: +61 3 9855 2885
Email: patv@botswanametals.com.au
Web: www.botswanametals.com.au
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
The information in this report that relates to Exploration Results is based on, and fairly represents, information and supporting
documentation compiled by BML staff on site and provided to Mr Steve Groves who is a Member of The Australasian Institute
of Mining and Metallurgy. Mr Groves is a consulting geologist to BML and has previously been employed as the Exploration
Manager at BML. Mr Groves has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Groves consents to
the inclusion in this report of the matters based on his information in the form and context in which it appears.
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
CRITERIA
JORC Code Explanation
- Nature and quality of sampling (eg cut channels,
Sampling
random chips, or specific specialised industry
techniques
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
- Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
- Aspects of the determination of mineralisation
that are Material to the Public Report.
- In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Drilling
techniques
- Drill type (eg core, reverse circulation ,open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Commentary
Drill core is neatly arranged in 1 m core
trays for HQ core (mainly oxidised
horizon) and 1.5 m core trays for NQ
core (mainly competent rock). Core is
marked at every metre along an
orientation line and later marked at 0.05
m for handheld XRF analysis.
Spot analysis at every 0.05 m interval is
analysed at the BML site office in
Tshokwe using a portable XRF analyser
(INNOV-X Delta Premium). Standards
and blanks are used to monitor the
calibration of the instrument.
The spot values are then averaged at
0.5 m intervals, to give an estimated
grade at 0.5 m intervals. This estimate is
only used as a guide to determine where
core should be sampled and analysed
by the laboratory
The drillhole is pre-collared with HQ in
the weathered rock. HQ pre-collars
range from 15 m to 30 m using a
standard tube. NQ diamond core
drilling is used to complete the hole.
Weathered rock is too friable to
orientate using the spear method. Only
the competent rock is orientated (from
approximately 30 m to the end of hole).
Drillholes are mostly orientated
between 320° and 350°, inclined
between 50° and 65°.
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Drill sample
recovery
JORC Code Explanation
- Method of recording and assessing core
and chip sample recoveries and results
assessed.
- Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
- Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Commentary
•
The core length is measured after
every run. Results are compared to the
actual run length to calculate core
recoveries. Core is handled with care to
avoid breakage and crumbling. Core is
washed and placed onto holding core
trays.
HQ is used on friable ground, rotation
speeds and water pressure are
monitored to avoid destroying the core.
A soft rubber mallet is used to drive out
core from the barrel.
Overall core recovery in the
mineralised zones is >98%.
Logging
- Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
- Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
- The total length and percentage of the
relevant intersections logged.
•
- If core, whether cut or sawn and whether
quarter, half or all core taken.
- If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
- For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
- Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
- Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
- Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sub-sampling
techniques
and sample
preparation
Core is washed and stored in diamond
core trays in both 1 m and 1.5 m
intervals, depending on whether the
material recovered is oxidised or fresh.
Diamond core is visually inspected,
recording lithology, weathering,
alteration, mineralisation, veining and
structure. The core is also
geotechnically logged for RQD.
Core photography is performed on
every hole with photos having two full
core trays with clear interval details on
a white background. Wet and dry core
is photographed.
All relevant drilling is diamond core
drilling in the mineralised and
surrounding zones. Core is cut
longitudinally along an orientation line
with half core used for metallurgical test
work. The remaining half core is cut
into quarters for lab assaying and
storage.
A sub-sampling approach is applied for
SG whereby 10-15 cm samples are
taken from specific rock types
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location
of data
points
JORC Code Explanation
- The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
- For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
- Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
- The verification of significant intersections by
either independent or alternative company
personnel.
- The use of twinned holes.
- Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
- Discuss any adjustment to assay data.
Commentary
An Olympus Innov-X Delta Premium
portable XRF analyser was used to
guide core sampling.
Blanks, duplicates and standards are
inserted at a rate of approximately 13%,
although the blank material is appears to
have elevated values of Ni and Cu. The
duplicates are prepared and inserted by
the laboratory and are not inserted
blindly by the onsite geologist. The
performance of the CRM analyses is
acceptable.
- Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
- Specification of the grid system used.
- Quality and adequacy of topographic
control.
-
Data spacing
and
distribution
- Data spacing for reporting of Exploration
Results.
- Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
- Whether sample compositing has been
applied.
No verification work of significant
intersections has been completed
The Competent Person confirmed the
collar positions and sampling intervals
onsite.
No twin holes have been drilled
No statistical adjustments to data have
been applied
All of the drillhole collars have been
surveyed using a DGPS.
A number of drillhole collars have been
observed by MSA in the field.
Down-the-hole surveys were conducted
for all holes.
The grid system for the project is UTM
WGS84.
The topography model was derived
from the drillhole collar elevations and
modelled in Leapfrog.
The drillholes were spaced at an
average of 50 m apart on strike and
from 25 m to 50 m on dip (along the
drilling fence).
The drillhole spacing is sufficient to
assume geological and grade continuity
for this type of mineralisation but
insufficient for grade continuity to be
confirmed.
Samples have been composited
according to mineralisation zone.
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Orientation of
data in
relation to
geological
structure
- Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
- If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample
security
- The measures taken to ensure sample
security.
Audits or
reviews
- The results of any audits or reviews of
sampling techniques and data.
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
CRITERIA
JORC Code Explanation
Mineral tenement
• Type, reference name/number, location
and land tenure
and ownership including agreements or
status
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
• Acknowledgment and appraisal of
done by other
exploration by other parties.
parties
Drillholes are mostly orientated
between 320° and 350°, with dips
ranging from 50° to 65° to
perpendicularly intersect mineralisation.
Appropriate chain-of-custody
procedures were followed to ensure
sample security.
The data were examined by the
independent consultant Mr Steve Groves
of Perth in Australia and considered
appropriate.
Commentary
The results reported in this announcement
are located in PL110/94 which is a granted
Exploration Licence held by African Metals
Limited, a 100% owned subsidiary of
Botswana Metals Limited.
PL110/94 is subject to a Joint Venture
agreement with BCL Limited.
PL110/94 was recently extended for a
further two years and is in good standing.
Interpretations and conclusions in this
announcement refer in part to results
generated by historic exploration work
conducted by Roan Selection Trust,
Falconbridge, Cardia Mining and Botswana
Metals.
Botswana Metals considers all previous
exploration work to have been undertaken
to an appropriate professional standard.
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Geology
JORC Code Explanation
• Deposit type, geological setting and style
of mineralisation.
Commentary
The Maibele North Prospect is hosted
within the Magogaphate Shear Zone - a
major geological structural feature,
generally considered to mark the
boundary between the Archaean aged
(>2.5 billion year old) Zimbabwean Craton
and the Limpopo Belt or Limpopo Mobile
Zone (LMZ). . The nickel-copper deposits
of Selebi Phikwe lie within the northern
part of the Central Zone of the Limpopo
Mobile Belt, whilst the nickel copper
deposits of Phoenix, Selkirk and Tekwane
lie in the Zimbabwean Craton. The Central
Zone of the LMZ comprises variably
deformed banded gneisses and granitic
gneisses, infolded amphibolites and
ultramafic intrusions that that have the
potential to host Ni-Cu sulphide
mineralization. Ni-Cu-PGE mineralization
at Maibele North and Airstrip copper is
spatially associated with an ultramafic
intrusion.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all material drill
holes:
o easting and northing of the drill
hole collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Refer to Appendix 1.
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Data
aggregation
methods
JORC Code Explanation
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly
important in the reporting of
Exploration Results.
• If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Commentary
With regards to the MRE:
Mineralised intersections are composited
to 2 m lengths per Zone.
No discernible relationship exists
regarding sample length and grade.
With Regards to reported drill intersections
Where uneven sampling intervals have
contributed to an averaged result, the
result has been calculated by a weighted
average technique that incorporates the
interval width of each contributing
sample.
A grade cut off of 0.3% and internal
dilution of <2m has been used in the
calculation of significant intercepts.
No grade truncations have been applied
to the data.
The Maibele North ore is interpreted to be
genetically and mineralogically similar to
the ore treated at the nearby Selebi Phikwe
smelter where current recovery grades in
the flotation plant average 84% for Ni and
95% for Cu. Where Ni Eqv calculations
have been undertaken on historic assay
results it has been assumed that similar
high recoveries will be achievable. The
current drill program has been designed to
assess the metallurgical properties of the
Maibele North mineralisation and the
indicative recoveries will be published in
due course.
Given that that the Maibele North project is
currently the subject of a Joint Venture with
the nearby Mine and Smelter operator,
BCL, BML assumes that no impediments in
recovering and selling the metals
contained in the deposit would exist
provided an viable economic resource can
be defined.
The precise geometry of the
mineralization with respect to the
drill hole angle is not known and
thus, all drill hole results are
reported as down hole length.
The drill holes in the current program are
inclined reconnaissance holes based on
the average dip of exposed units. The
orientation of the mineralization is unknown
and true width is unknown.
Geotechnical logging is under way to
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
JORC Code Explanation
Commentary
address the geometry of mineralisation.
Diagrams
• Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Plan view and/or cross section maps of the
reported drill holes are included in this
announcement.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
The results in this announcement are
interpreted to lie within the plane of a
mineralized trend that is coincident with an
ultramafic intrusion and encompasses the
Maibele North and Airstrip Copper
Prospects.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
There is no other material exploration
considered material to the reported mineral
estimate
Further work
• The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
•
Should the scoping study prove positive,
infill drilling would be required to upgrade
the Mineral Resource classification.
Appendix 1: Details of holes referred to in Document
Hole Number
Easting
Northing
Dip
Azm
Total Depth
MARD0100
632236
7595388
-55
330
183.05
MARD0101
632357
7595479
-55
330
140.1
MARD0103
632286
7595434
-55
330
156.75
Botswana Metals Limited
REGISTERED OFFICE
Suite 506, Level 5, 1 Princess Street Kew Vic Australia 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
Share your feedback
Discover