Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to announce the
commencement of the Phase VII drilling program at its 75% owned Sorby Hills Lead-Silver-Zinc
Project (“Sorby Hills” or “the Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
•
Drill Rig has arrived on site and has commenced the Phase VII drill program at Sorby Hills.
•
The planned drilling program comprises 2,000m across 19 diamond drill holes and has the
following objectives:
o
Increase the size of the Norton deposit Reserve base via:
o
additional metallurgical testwork to potentially improve conservative metal
recoveries adopted in the Sorby Hills Definitive Feasibility Study; and
o
Testing extensions to the Norton deposit mineralisation adjacent to the current
open pit design, including that identified in SHMR_149 which was stopped in high
grade mineralisation (2m @ 10.9%Pb) due to technical issues with the drill rig.
•
The Phase VII drilling program is anticipated to take approximately 6 weeks to complete
with assay results targeted for mid Q3 2023.
•
High priority targets identified at the strategic Manbarrum Zinc-Silver Lead Project
located 25km east of Sorby Hills.
Boab Managing Director and CEO, Simon Noon, stated:
“With the 2023 field season underway, I am delighted to announce the kick-off of our Phase VII
drill program. The Phase VII program’s primary objective will be to grow the Sorby Hills production
target through a combination of metallurgical, extensional and in-fill drilling.
The opportunities at Norton are particularly exciting, where conservative metal recoveries adopted
for the DFS have significant scope for improvement based on historic data and geological
similarity of ore styles and mineral types. Furthermore, recent high-grade intersections adjacent
to our DFS pit design provide a low-risk target for mine life extension. We look forward to reporting
the results as they come to hand.
In conjunction with our 2023 drill program, Boab continues to advance toward a final investment
decision on the Sorby Hills Project with preferred EPC contractor GRES firming up Front End
Engineering & Design work and discussions with financiers ongoing.”
Background
Following the success of the 2022 Phase VI drilling program, Boab has commenced a Phase VII
drilling program to be undertaken during the 2023 field season.
The planned Phase VII drilling program comprises 19 diamond drill holes for about 2,000m and will
target opportunities to increase the Sorby Hills Reserve base via additional metallurgical testwork,
extensional and in-fill drilling. Collar locations for the planned drill holes are shown in Figure 1.
Figure 1: Plan view of the Sorby Hills Project showing the locations of planned Phase VII drill hole collars with
respect to previous drilling, the Mineral Resource and DFS open pit outlines.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 2
Drilling at Norton
Metallurgical drilling
Whereas the Definitive Feasibility Study (“DFS”) metallurgical testwork on core retrieved from
Omega and B deposits demonstrated high recoveries consistent with previous testwork, results at
Norton were mixed and at odds with historic data (see ASX Announcement 19 November 2021).
Whilst the driver for the poor recoveries was identified, the lack of core prohibited further testwork
at the time and led to the Company adopting a conservative metal recovery percentage across the
entire Norton deposit for the DFS (78% vs 90+% at other deposits). This consequentially resulted in a
significant portion of the Norton deposit included in the 2020 Sorby Hills Prefeasibility Study
production target being excluded from the Sorby Hills DFS.
Metallurgical drilling at Norton will aim to determine whether there is a spatial constraint on the
poorer performing material and provide additional core upon which further metallurgical testwork
can be undertaken. A positive result may lead to a material increase in the overall metal recovered
from the Norton deposit.
Extensional drilling
Results from Phase VI extensional drilling at the Norton deposit revealed several high-grade
intersections on the fringe of the current open pit design, including SHMR_149 which was stopped
in high-grade mineralisation (2m @ 10.9% Pb) due to technical issues with the drill rig (Figure 2). The
Phase VII drill program will follow up these intersections with the objective of demonstrating
continuity of the mineralisation and potential for their incorporation into a revised pit design.
Figure 2 - Norton Cross Section trending NE (see Figure 1) incorporating latest intercepts, interpreted
mineralisation and target area for the Phase VII drilling campaign.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 3
Progress at Manbarrum Zinc-Silver-Lead Project
The Manbarrum Zinc-Lead-Silver Project (“Manbarrum”) was acquired by Boab in 2021 and
comprises 175 km2 of prospective tenements (including two granted mining leases and two
declared Minerals Resources) located 25km east of Sorby Hills and covering geology genetically
related to that found at Sorby Hills.
Conceptual open pit mining studies completed by CSA Global Pty Ltd in 2018 delivered positive
results based on an on-site processing facility and identified the opportunity to improve project
economics via toll treating at a future plant located at Sorby Hills.
At Manbarrum, almost all intersections to date have been from shallow and/or outcropping
mineralisation. Boab have used the existing seismic data from oil and gas exploration, mapping data
and drilling data to build a new three-dimensional model of the geology of the leases. The work has
identified numerous structural targets where the main host mineralisation unit lies under cover and
has not been tested by previous exploration.
Boab plans to systematically work through these targets in future programs with the objective of
finding additional long-term feed for the Sorby Hills plant.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@BoabMetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by HenanYuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
_____________________________________________________________________________________________________________________________ ____________________
Boab Metals Limited
Page 4
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this Announcement relating to Exploration Results has been extracted
from the ASX Announcements titled “Assays Confirm Further Positive Outcome for Sorby” dated
23 January 2023, “Sorby Hills DFS Metallurgical Testwork Results” dated 19th November 2021
available to view at www.boabmetals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in these announcements.
The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the form in which they were first presented.
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Information included in this Quarterly Report relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and dated
19 January 2023, available to view at www.boabmetals.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Ore
Reserve Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.