Key Amendments Received to Sorby Hills EPA Approval
Released
Released
Announcement PDF
23 December 2024
Key Amendments Received to Sorby Hills EPA Approval
Boab Metals Limited (ASX: BML) (“Boab” or “Company”) is pleased to announce that it has
received formal notification from the Western Australian Government consenting to key
amendments to the Sorby Hills Project’s (“Sorby Hills”, the “Project”) existing approval under
Western Australia’s Environmental Protection Act (“EPA”).
HIGHLIGHTS
•
Western Australian Government has provided consent to key amendments to the
Sorby Hills Project existing EPA approval.
•
The amendments provide Boab with scope to implement the Sorby Hills Project in
line with the Project’s FEED study, including an increase to the open pit depth and
mining production rate.
•
The amendments also provide the opportunity for Boab to further reduce capital
expenditure through an optimisation of the proposed water management strategy
and rationalisation of associated infrastructure.
•
All EPA amendments required under Part IV to commence the implementation of
the Sorby Hills Project have been received.
•
The Company will now proceed toward finalising outstanding regulatory approvals
and advancing toward a targeted Final Investment Decision in 2H 2025.
Boab Managing Director and CEO, Simon Noon, stated:
“We are delighted to have secured our requested amendments to the existing Sorby Hills EPA
approval. The Company has undertaken a rigorous information exchange with the Western
Australia Environmental Protection Agency department to demonstrate that the Project, as
conceived in our FEED Study is in accordance with requirements of the EPA and associated
regulation. We welcome the decision, and the clarity and opportunity it affords, and now look
forward to continuing to build upon the momentum that we have generated over the past six
months toward advancing Sorby Hills to a Final Investment Decision.”
Background
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley of
Western Australia and has access to existing sealed roads to transport concentrate 150km
from the site to the facilities at Wyndham Port.
On 6 June 2024, Boab released the results of a Front-End Engineering & Design Study (“FEED
Study”)1 on the Project showing strong pre-tax economics including C1 operating costs of
US$0.36/lb payable Pb (incl. a net Silver credit of US$0.37/lb payable Pb), NPV8 of A$411M, IRR
of 37%, A$778M free cash flow, and an average annualised EBITDA of A$126M. Pre-production
capital costs were estimated to be A$264M.
1
ASX Release 6 June 2024
With operating costs covered by revenue generated by a historically non-volatile lead price, the
Project free cash flow is exposed to movements in the price of silver.
The Project comprises a Mineral Resource of 47.3Mt containing 1.5Mt Lead at 3.1% Pb and
53Moz Silver at 35g/t Ag (Table 1). The current Sorby Hills mine plan comprises 18.3Mt at 3.4%
Pb and 39g/t Ag of which ~83% is classified as an Ore Reserve (Table 2).
Over the past 3 months, significant progress has been made by the Company toward
advancing Sorby Hills to a Final Investment Decision including:
•
Execution of an agreement to increase Boab’s interest in Sorby Hills to 100% by
acquiring joint venture partner Henan Yuguang’s 25% interest 2; and
•
Execution of a cornerstone debt financing facility3 with global commodities trader
Trafigura comprising a US$30M prepayment facility and associated Offtake Agreement
for 75% of Sorby Hills concentrate production over a period of approximately 7 years.
Next Steps
With all EPA amendments required to commence Sorby Hills mining operations now received,
the Company will turn its attention to finalising outstanding regulatory approvals including
the completion and updating of documentation required under the federal Environmental
Protection and Biodiversity Conservation Act (“EPBC”) as a result of the increase in the Project’s
scope since the Project was originally assessed in 2013. EPA approval to mine the Beta Pit,
which is scheduled to occur at the end of the current Project mining plan, will be sought
subsequent to the commencement of operations.
The Company is exploring cost reduction initiatives, including the feasibility and cost-benefit
of utilising the DeGrussa process plant and the feasibility of adopting a 100% grid power
solution sourcing green energy from the Ord River Hydroelectric Plant. Furthermore, the
amendments received to the EPA approval will facilitate an optimisation of the Project’s water
management strategy and a rationalisation of the proposed water management
infrastructure.
Concurrently, the Company will continue discussions with potential lenders with a view to
securing further non-dilutive debt finance to complement the Trafigura prepayment facility.
The Company is targeting a Final Investment Decision in 2H 2025.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@boabmetals.com
2
3
ASX Release 23 September 2024
ASX Release 10 December 2024
ASX Announcement
Page 1
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian-based exploration and
development company with interests in Australia and South America. In Australia, the
Company is currently focused on developing the Sorby Hills Project in WA. Sorby Hills is located
50km from the regional centre of Kununurra in the East Kimberley and has access to existing
sealed roads to transport concentrate the 150km from site to the facilities at Wyndham Port.
Established infrastructure and existing permitting allows for fast-track development and
production. Boab owns a 75% interest in the Project with the remaining 25% interest held by
Henan Yuguang Gold & Lead Co. Ltd. Boab holds an option to acquire Yuguang’s interest in the
Project upon reaching a Final Investment Decision.
Table 1: Sorby Hills Mineral Resource Estimate – Pb Domains only.
Grade
Contained Metal
Tonnes
(Mt)
Pb
Zn
Ag
Pb
Zn
Ag
%
%
g/t
kt
kt
koz
Measured
12.6
3.5%
0.4%
43
444
45
17,521
Indicated
11.0
3.4%
0.4%
34
377
46
12,114
Inferred
23.6
2.7%
0.5%
31
645
117
23,406
Total Resource
47.3
3.1%
0.4%
35
1,465
207
53,042
Resource
Classification
Note: Tonnes and Grade are rounded. Reported at a 1.0% Pb Cut-Off. Discrepancies in calculated Contained Metal is due to rounding .
Table 2: Sorby Hills Ore Reserve Statement.
Grade
Contained Metal
Ore Reserve
Category
Ore
(Mt)
Pb (%)
Ag (g/t)
Pb (kt)
Ag (Moz)
Proved
10.4
3.5%
42
358
14.1
Probable
4.9
3.5%
32
172
5.0
Total Ore Reserve
15.2
3.5%
39
531
19.1
Note: Tonnes and Grade are rounded. Reported at a 1.0% Pb cut-off. The above data has been rounded to the nearest 10,000 tonnes ore,
0.1% lead grade and 1,000 lead tonnes, 1g/t silver grade and 100,000 silver ounces. Discrepancies in calculated Contained Met al is due to
rounding. Ore Reserves have been calculated using metal prices of A$3,313.91/t Pb and A$37.89/oz Ag and royalties of 4.3% of gross
revenue including allowable deductions.
ASX Announcement
Page 2
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for
Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Mineral Resource Estimate and
that all material assumptions and technical parameters underpinning the estimates, continue
to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified
from the Mineral Resource Estimate.
Information included in this announcement relating to Ore Reserves, has been extracted from
the Sorby Hills Definitive Feasibility Study and dated 19 January 2023, Information included in
in this announcement relating to Production Targets and Financial Forecasts has been
extracted from the Sorby Hills FEED Study and dated 6 June 2024. Announcements are
available to view at www.boabmetals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.
ASX Announcement
Page 3
Share your feedback
Discover