Drilling Results Confirm a Significant Intercept
at the Keep Seismic Target
Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to report assay results
including a material intercept from the 1st drill hole at the Keep Seismic Target from the Phase VII
drilling program at its 75% owned Sorby Hills Lead-Silver-Zinc Project (“Sorby Hills” or “the
Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
• Drilling of the “Keep Seismic Target” intercepts significant base metal mineralisation.
•
o
SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb & 2.26% Zn) and 17.6 g/t Ag from
242.55 m
o
Incl. 3.12 m @ 13.43% PbEq (6.37% Pb & 6.36% Zn) and 26.5 g/t Ag from 245.36m
Intercepts of the exceptional grade and composition at the Norton Ore body:
o
SHSD_171: 11.05 m @ 17.63% PbEq (10.98% Pb & 189 g/t Ag) from 81.95m
o
SHSD_174: 11.60 m @ 20.23% PbEq (8.78%Pb & 325 g/t Ag) from 74.40m
•
Metallurgical test work now underway to establish uniformity of the Norton deposit
metallurgy with other ore domains of the Sorby Hills deposit.
•
Significant exploration drill hole intercepts:
o
SHSD_164: 6m @ 9.92% PbEq (3.92% Pb & 170g/t Ag) from 101m
o
SHSD_183: 2m @ 6.85% PbEq (4.43% Pb & 69g/t Ag) from 103m
o
SHSD_184: 2.8m @ 3.84% PbEq (3.17%Pb & 19g/t Ag from 129m
Boab Managing Director and CEO, Simon Noon, stated:
“We are very excited to confirm that the drill hole at the Keep Seismic Target has intersected zinclead sulphide mineralisation between 242 and 257m as was anticipated. This is an outstanding
success given the conceptual nature of the target and its location in an area, and at a depth where
no mineralisation has been intersected before. The location of the drill hole sits around 2 km away
from the closest ore reserves at Sorby Hills and will be a catalyst for further exploration within our
mining tenements.
It is clear there is more to be discovered at Sorby Hills. The step-out drill holes at Norton and at Beta
also confirmed the continuity of mineralisation.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 1
In conjunction with our 2023 drill program, Boab continues to advance toward a final investment
decision on the Sorby Hills Project with preferred EPC contractor GRES firming up Front End
Engineering & Design work whilst discussions with financiers is ongoing”.
Phase VII Program Details
The Phase VII drilling program concluded with the completion of 22 drill holes for 2,634 (an
additional 24% of metres than originally planned). Of the total program, 1,433 m across 13 holes were
drilled for a metallurgical purpose with another 1,200m across 9 holes drilled for resource/reserve
expansion and exploratory objectives.
Collar locations for all the completed drill holes are shown below in (Figure 1).
Figure 1: Plan view of the Sorby Hills Project showing the locations of completed drill holes for Phase VII with respect
to previous drilling, the Mineral Resource and DFS open pit outlines.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 2
Exploration and Resource Extension Drilling
The resource extension/exploratory drilling targeted the periphery of the known mineralisation,
areas of lower confidence in the ore distribution and a conceptual target.
KEEP SEISMIC TARGET
The highlight of the 1st drill hole into the conceptual target is:
o
SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb & 2.26% Zn) from 242.55 m
Incl. 3.12 m @ 13.43% PbEq (6.37% Pb & 6.36% Zn) and 26.5 g/t Ag from 245.36m
As announced in October 2023, the interpretation of seismic data from petroleum exploration across
the Burt Range Sub-Basin resulted in a conceptual drill target – the Keep Seismic Target. A 306.5m
deep drill hole was successfully drilled into the target’s depth range.
Seismic line WP96-08 traverses the project area about 2 km south of B-Deposit and shows the
reflectors of the Devonian-Carboniferous sedimentary strata gradually dip to the east and affected
by a series of extensional faults (Figures 2 and 3) leading into a half-graben structure flanked on the
eastern side by a reef covered basement high which was targeted by the Pincombe No 1 petroleum
well, drilled in 1996.
SHSD_185 was aimed at testing the potential for a mineralised feeder fault system, which can be
seen in the seismic data, and the potential for stratiform mineralisation at the Knox Formation/Sorby
Dolomite interface (Figure 3).
The drill hole intersected the base of the Knox Formation at about 224.6m and was terminated at a
depth of 306.5m within massive Sorby Dolomite after intersecting two intervals of mineralisation
(Figure 3).
Figure 3
Figure 2: Interpreted NE-SW trending seismic line WP_96-08 image showing the location of the Pincombe No 1 oil well
and the conceptual structural target within M80/287 & 289.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 3
Figure 3: Close up view of section and geological interpretation of SHSD_185 and seismic line WP_96-08.
The upper interval of mineralisation was intersected at the base of the impermeable Milligan’s
Shales which is part of the Middle Carboniferous sediments, from a down-hole depth of 82.5 m for
about 4.5 m. It consists of disseminated and thin bands of massive sulphide minerals and veins of
galena (PbS), marcasite (FeS2) and sphalerite (ZnS) immediately below the shale.
The following mineralisation interval was encountered:
o
SHSD_185: 4.40 m @ 0.81% (0.67% Pb & 0.13% Zn) and 11 g/t Ag from 83.6 m
•
Incl. 0.40m @ 2.50% (2.17% Pb & 0.33% Zn and 18.0 g/t Ag from 83.6m
While not ore-grade, the significance of this intercept lies within its stratigraphic position and the
fact that it is “top loaded” meaning that the metal-bearing fluids were expelled from the deeper part
of the basin upwards and outwards and were restricted in their path by the impermeable shale
horizon. This stratigraphic position is the host position of the Sandy Creek zinc deposit at Boab’s
Manbarrum Project located on the eastern side of the Burt Range Basin in the Northern Territory.
The lower mineralisation interval - the primary target - was intersected from 242.5 m over an
interval length of about 15 m with intermittent intervals of massive colloform and intergrown
sphalerite and disseminated coarse crystalline galena as can be seen in (Figure 4) with the
lowermost massive sphalerite band located at 266.2 m. Within the 15 m envelope of mineralisation
a composite mineralisation interval was intersected:-
• SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb & 2.26% Zn) from 242.55 m
Incl. 3.12 m @ 13.43% PbEq (6.37% Pb & 6.36% Zn) and 26.5 g/t Ag from 245.36m
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 4
Down Hole
The mineralisation has a Zn:Pb ratio of about 1:1, whereas for most part the
mineralisation at Sorby Hills has a Zn:Pb ratio of about 1:10. This demonstrates
that a different part of the Burt Range Basin mineralisation system has been
intersected. The spatial chemical variation is consistent with the timing and
sequencing of mineral precipitation as indicated by a gradual colour change in
the sphalerite bands up-hole and the late crystallisation of galena (Figure 4).
This suggests that in the deeper parts of the basin, it is possible that more zincrich mineralisation may be encountered.
The intersected mineralisation is predominantly cyclic, stratabound (subparallel with a layering of the rock formation), and of a replacement-type nature
with potential lateral continuity that needs to be dill tested.
A fault breccia was intersected at a depth of ~ 251.3 m which showed evidence
of zinc and lead sulphide mineralisation suggesting a possible feeder structure.
In the context of the seismic line interpretation, there is a 300 – 400 m wide
zone with multiple faults interpreted that could have acted as feeder structures.
It is possible that drill hole SHSD_185 stopped short of intersecting the entire
width of the fault zone (Figure 3).
Down Hole
Boab is of the view that the initial analytical and geological results at the Keep
Seismic Target are a major exploration success, demonstrating not only proof
of concept but more importantly the potential of several kilometres of thick
sedimentary rocks of the Burt Range Basin to be the source of significantly
more base metal mineralisation.
These intercepts open a wider spectrum of settings for the targeting of
mineralisation and highlight the exploration upside of Boab’s land holding in
the Burt Range Basin.
The Company will now aim to build up its knowledge through the seismic data
around the Keep Prospect. Follow up work will be designed and planned as a
priority.
Figure 4: Close up photograph of drill core interval 245.3m to 246.1m showing colloform massive sulphides (low-iron
sphalerite = cream coloured & galena = blue grey).
NORTON NORTH AND BETA DRILLING
Exploration success was encountered on the northern periphery of the Norton deposit with drilling
of holes SHSD_164 and SHSD_183 (Figures 1 & 5). The drill holes intersected mineralisation at the
target depth of approximately 100 m down hole and add to the confidence of continuity of
mineralisation in this area. The mineralisation remains open to the north. Both holes intersected
partially oxidised and massive galena mineralisation. The partly oxidised nature of mineralisation at
Norton North is indicative of weathering along a set of faults to the northwest.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 5
The following mineralisation intervals were encountered:
o
SHSD_164: 6m @ 9.92% PbEq (3.92% Pb & 170g/t Ag) from 101m (down hole)
o
SHSD_183: 2m @ 6.85% PbEq (4.43% Pb & 69g/t Ag) from 103m (down hole)
Figure 5: Cross section of the northern extension drilling at Norton (see Figure 1 for location).
SHSD_184 was drilled at the western periphery of the Beta deposit to test the continuity of
mineralisation. The hole intersected one noteworthy interval of mineralisation at around 129 m
below surface. While the mineralisation has not been closed off its width has decreased notably.
o
SHSD_184: 2.80 m @ 3.84% PbEq (3.17% Pb & 19 g/t Ag) from 129.0 m (down hole)
The remaining exploration drill holes at Norton, intersected mineralisation but at grades below
reporting guidelines.
Metallurgical Drilling
The metallurgical portion of the program was underpinned by the prospect of spatially restricting
or revising upwards the recovery factors of ore from Norton and to provide additional core upon
which further test work can be undertaken. A positive result could lead to a material increase in the
overall metal recovered from the Norton deposit.
The ore grade intervals encountered testify to the robustness of the Norton mineralisation with its
clean low-iron and high silver values within the mineralisation envelope.
Over and beyond its main purpose, the metallurgical portion of the drill program has also confirmed
the geometry and grade of mineralisation at Norton at a depth and over a width consistent with the
Sorby Hills Resource model.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 6
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 8 6268 0449
Email: info@boabmetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by HenanYuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared
by Dr Simon Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists
(Member Number: 3101). Dr Dorling has sufficient experience which is relevant to the style of
mineralization and type of deposit under consideration and to the activity which they are
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr
Dorling consents to the inclusion in the release of the matters based on their information in the
form and context in which it appears.
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 7
Table 1 - Drill Hole Collar Locations and Assay Status
HOLE ID
mE
mN
RL
Depth
Dip
Azimuth
Assays
Prospect
SHSD_164
497015.01
8293749.61
20.77
144.50
-70
270
Received
Resource
SHSD_165
496891.50
8293705.83
20.88
126.50
-70
270
Received
Resource
SHSD_166
497023.40
8293627.07
20.83
137.20
-70
270
Received
Metallurgy
SHSD_167
497017.07
8293515.44
20.63
126.50
-70
270
Received
Metallurgy
SHSD_168
497062.02
8293474.33
20.64
120.00
-70
270
Received
Metallurgy
SHSD_169
496999.74
8293477.70
20.65
120.50
-70
270
Received
Metallurgy
SHSD_170
496837.20
8293450.11
20.65
126.50
-70
270
Received
Resource
SHSD_171
496904.50
8293475.10
20.71
120.50
-70
270
Received
Metallurgy
SHSD_172
496896.42
8293517.13
20.81
117.50
-70
270
Received
Metallurgy
SHSD_173
496763.80
8293280.62
21.17
78.50
-70
270
Received
Resource
SHSD_174
496899.69
8293396.36
20.55
99.50
-70
270
Received
Metallurgy
SHSD_175
496892.72
8293593.61
20.78
108.50
-70
270
Received
Metallurgy
SHSD_176
497001.04
8293391.09
20.63
111.50
-70
270
Received
Metallurgy
SHSD_177
497051.91
8293379.99
20.73
102.50
-70
270
Received
Metallurgy
SHSD_178
496975.16
8293285.89
20.63
102.50
-70
270
Received
Metallurgy
SHSD_179
496862.15
8293296.15
20.63
90.50
-70
270
Received
Metallurgy
SHSD_180
496889.87
8293239.00
20.56
75.50
-70
270
Received
Metallurgy
SHSD_181
496687.25
8293306.61
20.63
69.50
-70
270
Received
Resource
SHSD_182
497259.84
8292970.75
20.37
72.20
-70
270
Received
Resource
SHSD_183
497070.85
8293784.31
20.93
132.50
-70
270
Received
Norton Extra
SHSD_184
496164.87
8295304.41
21.54
144.50
-70
315
Received
Beta Extra
SHSD_185
498354.00
8288018.00
20.00
306.50
-70
270
Received
Keep Seismic
Target
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 8
Table 2 - Intercept Table (intercepts have been calculated using a 1% Pb cut
off, maximum 2 m consecutive dilution and total max. 4 m internal dilution
and minimum thickness of 2 m)
Depth
From
Depth
To
Thicknes
s
Pb
Eq_%
Ag
ppm
Pb_
%
Zn_
%
SHSD_164
101
107
6
8.66
170.19
3.92
0.05
SHSD_165
101.1
104
2.9
2.43
17.52
1.94
0.24
SHSD_180
25.4
28.55
3.15
13.99
1.09
0.01
SHSD_180
46.2
49.65
3.45
1.48
7.45
111.67
4.34
0.72
SHSD_182
21.2
23.2
2
1.26
2.4
1.19
0.41
SHSD_183
103
105
2
6.34
68.55
4.43
0.41
SHSD_184
129
131.8
2.8
3.70
18.97
3.17
1.71
SHSD_185
242.55
252.1
9.55
4.12
17.6
2.59
2.26
including
245.36
248.48
3.12
8.83
44.49
6.37
6.36
SHSD_167
94.1
99.5
5.4
5.25
30.17
4.41
0.02
SHSD_168
97.8
105
7.2
4.26
46.36
2.97
1.4
SHSD_169
90.2
92.9
2.7
4.38
51.26
2.95
0.01
SHSD_169
95.7
99.4
3.7
1.68
21.53
1.08
0.11
SHSD_171
81.95
93
11.05
16.24
188.71
10.98
0.45
SHSD_174
74.4
80.5
6.1
4.87
68.26
2.97
0.18
SHSD_174
81.15
86
4.85
36.47
690.1
17.24
0.1
SHSD_176
71.43
74.5
3.07
4.68
50.96
3.26
1.4
SHSD_176
80.25
82.9
2.65
11.50
81.11
9.24
0.04
SHSD_177
82.7
88.7
6
3.61
39.63
2.51
0.03
SHSD_178
53.6
58.2
4.6
3.11
26.81
2.36
0.43
SHSD_179
53.5
56.1
2.6
7.68
55.38
6.14
0.78
HOLE ID
Exploration
Drilling
Metallurgical
Drilling
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 9
Appendix 1 – Metal Equivalent Calculation Method
The contained metal equivalence formula is based on the Sorby Hills PFS including:
•
•
•
Lead Price US$2,253/t;
Lead recovery of 91% (weighted average of oxide and fresh Pb recoveries);
Lead Payability rate of 95%;
•
•
•
Silver Price US$27.4/oz;
Silver recovery of 82% (weighted average of oxide and fresh Ag recoveries); and
Silver Payability rate of 95%.
•
•
•
Zinc Price US$2500.0/t;
Zinc recovery of 91%, and
Zinc Payability rate of 95%.
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
MetalEq (%) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri SpriVpriGpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return rate,
V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of potentially
recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the PFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
_________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 10
JORC Code 2012 Edition - Table 1
Section 1 Sampling Techniques
(Criteria listed in the preceding section also apply to this section)
Criteria
Sampling
techniques
JORC Code Explanation
•
Nature and quality of sampling (e.g. cut channels,
random
chips,
or
specific
specialised
industry standard measurement tools appropriate
to the minerals under investigation, such as down
hole gamma
sondes, or
handheld
XRF
instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report.
•
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems.
Unusual commodities or
mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Drilling
techniques
•
Drill sample
recovery
Boab Metals Limited
Commentary
•
For the sonic/diamond drilling program (from June to August 2023),
sampling was not conducted in the field. After geological logging the
cutting/sampling intervals were determined and marked. The drill core
destined for sampling has been shipped to ALS laboratories in Perth for
cutting and sampling. The sampling process will be supervised by Boab
geologists.
•
The Sonic pre-collars were geologically logged but not samples. The
diamond core intervals were geologically logged by a geologist and
assessed for visible mineralisation. Where necessary samples was also
scanned with a portable XRF (Olympus InnovX Delta) for an indication of
qualitative lead concentration. About 45% of all samples have been
submitted to the laboratory.
•
The sampling methodology to be undertaken at ALS laboratories is
considered representative and appropriate for the carbonate hosted style
of mineralisation at Sorby Hills and is consistent with sampling protocols
in the past conducted by Boab.
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
•
The drilling method used in the Phase VII 2023 drill program is sonic pre
collars until bedrock was reached followed by diamond drilling (DD).
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
•
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
The sample (core) recovery is between 98 and 100% for most of the core
drilling including the mineralised intervals. The were very few occasions
where broken ground conditions were encountered where the core loss
due to core grinding was encountered.
Page 11
Criteria
Logging
Sub-sampling
techniques and
sample
preparation
Quality of assay
data and
laboratory tests
JORC Code Explanation
•
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
•
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc)
photography.
•
If core, whether cut or sawn and whether quarter,
half or all core taken.
•
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
•
Boab Metals Limited
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
Commentary
•
The DD core was logged at the rig at the temporary work site at Sorby
Hills. The core geotechnically, geologically, structurally and
mineralogically logged on site and photographed.
•
¼ core samples will be analysed first for metallurgical drill holes and ½
core for the remaining drill holes.
•
All samples will be sent to ALS Laboratories in Perth for preparation and
analysis. Duplicates, blanks and standards inserted at regular intervals.
•
All samples will be assayed to accepted industry standards at the ALS
Laboratories in Perth. Multi-acid digestion of pulverised sample was
followed by ICP-OES or equivalent assay technique.
•
Certified Ore Grade Base Metal Reference Material provided by Geostats
Pty Ltd. The standards selected covered a range of lead and silver
concentrations and there is good agreement between the Pb and Ag
Page 12
Criteria
JORC Code Explanation
Commentary
make and model, reading times, calibrations
factors applied and their derivation, etc.
•
Verification of
sampling and
assaying
Location of data
points
Data
spacing
and distribution
Orientation of
data in relation
to
geological
structure
Boab Metals Limited
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
assays, and the mean values provided with the reference standards. For
the standards the assayed values were within half of one standard
deviation and more commonly below the mean suggesting that grade
overestimation is not a significant problem in the dataset.
•
Duplicates and Blanks were also included in all sample despatches.
•
Geological logs were digitally entered into data entry templates in MS
Excel and entered into an Access database.
•
Assay certificates were received from the analytical laboratories and
imported into the drill database.
•
No adjustments were made to the assay data.
•
Accurately surveyed using a DGPS by a registered surveyor and
recorded in GDA94 Zone 52 will be conducted at the end of the
program.
•
All drill holes are surveyed down hole on completion of the drill hole
with a Reflex Gyro tool every 30 m.
•
The verification of significant intersections by
either independent or alternative company
personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
The initial siting of the drill hole position is based on planned
coordinates from the 3D data base and GPS positioning in the field
•
Data spacing for reporting of Exploration Results.
•
•
Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
The spacing between new and existing drill holes can range from a
minimum of 50 m to 25 m spaced collars.
•
Most drill holes at the Norton Deposit are inclined at -70 degrees to the
west holes.
•
One hole drilled at Beta at -70 deg to the northwest (315deg), and at the
Keep Seismic Target -70 to the west to better sample both shallow and
steeply dipping mineralised structures considered significant to the
mineralisation.
•
It is not considered that there is a significant sampling bias due to
structure.
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
•
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
Page 13
Criteria
JORC Code Explanation
Commentary
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Sample security
•
The measures taken to ensure sample security.
•
Cores trays are stored and processed at a secure facility at site. All
samples taken by Boab personnel to the truck depot in Kununurra and
placed on pallets for transport direct to ALS Laboratory in Perth.
Audits
reviews
•
The results of any audits or reviews of sampling
techniques and data.
•
To be undertaken.
Boab Metals Limited
or
Page 14
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement
and land tenure
status
JORC Code Explanation
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
•
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Commentary
•
Boab Minerals Ltd acquired a 75% interest in the Sorby Hills lead-silver
project in Western Australia on 5 October 2018. Yuguang (Australia) Pty
Ltd and wholly owned sub