Corporate Presentation
Released
Released
Announcement PDF
US$40/oz
US$35/oz
US$30/oz
US$25/oz
October 2025
Corporate Presentation
www.boabmetals.com
Sorby Hills Project
Lead Pays,, Silver Plays
2
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning, among
other things, future operating and exploration results or the Company’s future performance.
These forward-looking statements speak, and the presentation generally speaks, only at the
date hereof. The projections, estimates and beliefs contained in such forward-looking
statements necessarily involve known and unknown risks and uncertainties, and are
necessarily based on assumptions, which may cause the Company’s actual performance and
results in future periods to differ materially from any express or implied estimates or
projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly available
sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian law.
The presentation does not constitute or form part of any invitation, offer for sale or
subscription or any solicitation for any offer to buy or subscribe for any shares in Boab Metals
Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the time
of preparation. No representation or warranty, express or implied is made as to the fairness,
accuracy or completeness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Boab Metals Limited, its related
bodies corporate and the officers, directors, employees, advisers and agents of those entities
do not accept any responsibility or liability for any loss arising from the use of the presentation
or its contents or otherwise arising in connection with it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for
Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Mineral Resource Estimate and
that all material assumptions and technical parameters underpinning the estimates, continue
to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified
from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and
FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Ore Reserve Statement and that
all material assumptions and technical parameters underpinning the estimates, production
targets and financial forecasts continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been extracted
from the ASX Announcements titled “KEEP confirmed as a Target for Further Exploration”
dated 22 October 2024, “Significant Intercepts at Sorby Hills” dated 8 November 2023,
“Amended Drilling Announcement” dated 4 September 2023”, “Assays Confirm Further
Positive Outcome for Sorby” dated 23 January 2023, “High-Grade Lead-Silver Confirmed at
Beta Deposit” dated 1 February 2022 available to view at www.boabmetals.com.au. The
Company confirms that it is not aware of any new information or data that materially affects
the information included in these announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially
modified from the form in which they were first presented.
Disclaimer
2
Boab Metals Limited ASX: BML
3
Sorby Hills Project
Development Ready
• Tier-1 Jurisdiction, Located 50km northeast of Kununurra,
Western Australia, sealed road to Wyndham Port (150 km)
• Large scale and well defined 47.3Mt Silver-Lead Resource
(123g/t AgEq)1 including 53Moz contained Silver
• DFS & FEED Studies Complete for stage 1 Operations NPV8
A$910M and IRR 62% at current macroeconomics2
• High-Quality Processing Plant secured from Sandfire
Resources DeGrussa project for use at Sorby Hills
• Environmental Approvals received (EPA & EPBC)
• Forecast annual Silver production of ~2.2Moz, positioning
Sorby Hills among the top silver producers in Australia
• Exceptional Silver Exposure – Operating costs covered by
lead revenue delivering an AISC negative US$14/oz Ag
• Strong Financing & Partnerships – Trafigura offtake
agreement in place with US$30M prepayment. Advanced
discussions with debt financiers progressing
• Targeting a Final Investment Decision (“FID”) Q4 2025
• Significant Growth & Exploration Upside – Resource
expansion and Mine life extension at Sorby Hills in addition
to 100% owned regional strategic projects
Figure: Location of the Sorby Hills Project
1. See Appendix for Resource breakdown and Metal
Equivalent Assumptions
2. See Slide 4 for current macroeconomic assumptions
Boab Metals Limited ASX: BML
3
4
Boab Metals
Investment Thesis
4
SILVER SNAPSHOT: THE CROSSROADS OF INDUSTRY AND INVESTMENT
✓ Industrial demand: Unmatched conductivity make silver critical for solar
panels, EV electronic and central to the global energy transition.
✓ Supply squeeze: With primary mine output declining, most silver now
coming only as a by-product, and recycling stuck at ~20%, supply cannot
keep pace - entrenching a structural deficit.
✓ Value storage & safe-haven: As a monetary metal, silver is a store of
value, moving with gold during inflationary or geopolitical uncertainty.
✓ Speculative kicker: gold–silver ratio, investor flows to silver EFTs, and
leveraged futures trading all leading to amplified volatility — giving
silver greater upside torque in bull markets.
1,164Moz Demand in 2024
• 58% Industrial Demand
• 23% Jewellery & Silverware
• 16% Coins and Bars
1,015Moz Supply in 2024
• 22% Primary Silver Mines
• 58% as a by-product metal
• 19% Recycled Silver
Added to the U.S Government
draft Critical Minerals List
(August 25)
The Sorby Hills Project provides investors development ready exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
Boab Metals Limited ASX: BML
Source: Silver Institute 2025 Survey
5
Boab Metals
Investment Thesis
The Sorby Hills Project provides investors development ready exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
5
LEAD SNAPSHOT: THE ORIGINAL BATTERY METAL
✓ Enduring Demand: A lead-acid battery is typically replaced two to three
times in a Light Vehicle's average lifetime of around 12 years supporting a
demand tail that will stretch decades.
✓ Indian Lead Demand: Indian consumption of refined lead is forecast to
grow 5% YOY through to 2030.
✓ Silver Lining: High demand for silver bearing lead concentrates is
delivering record low Concentrate Treatment Charges (negative US$65/t)
✓ Price Stability: A mature secondary market provides a buffer against price
shocks, limiting the Lead price to a relative tight and predictable range.
13,185kt Demand in 2024
• 41% Replacement batteries
• 13% New batteries
• 34% Industrial batteries
• 12% Non-battery uses
13,141kt Supply in 2024
• 32% Primary Lead
• 68% Recycled Lead
Market to remain tight as
growth in production slows by
more than in consumption
Boab Metals Limited ASX: BML
Source: CRU 2023-2025
6
-2.00%
-1.50%
-1.00%
-0.50%
0.00%
0.50%
1.00%
1.50%
2.00%
-6.00% -4.00% -2.00% 0.00% 2.00% 4.00% 6.00%
-4.00%
-2.00%
0.00%
2.00%
4.00%
6.00%
Jan-20 Jan-21 Jan-22 Jan-23 Jan-24 Jan-25
30
Day
Average
Daily
Change
ASX:BML US$ Silver
Sorby Hills Project
When Silver Runs, Boab’s Share
Price Runs Harder
Boab Metals Limited ASX: BML
6
▪ Since the acquisition of the
Sorby Hills Project in June
2018, Boab’s share price has
exhibited a strong
correlation with movements
in the price of Silver.
▪ Positive movements in
Silver price correspond to
leveraged positive
movements in the Boab
share price
% daily change in USD Silver price & BML share price
BML 30-day Avg
Daily % Change
USD
Silver
30-day
Avg
Daily
%
Change
*30 Day Rolling Average
BML share price outperforming silver metals returns
BML outperforming Silver
7
Viewed differently, the Sorby
Hills Project may be considered
a low-cost silver producer
AISC = negative US$14/oz Ag
Sorby Hills Project
Cost structure delivering “free Silver”
Boab Metals Limited ASX: BML
Operating Costs covered by a non-volatile Lead Price
Operating margin fully leveraged to Silver price movements.
*Based on Spot Price of US$52.9/oz Ag
Sorby Hills FEED
Study AISC
ex-Silver Credits
US$0.81/lb Pb
US$/lb Pb
1.0
2.0
0
10-Year average
Lead Price1
US$0.94/lb Pb
+/-US$0.10/lb Pb
standard deviation
Sorby Hills Net
Silver Credits*
US$0.74/lb Pb
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
US$/oz Ag
0
50
-50
Sorby Hills
Net Lead “Credits”
US$65/oz Ag
AISC = negative US$14/oz Ag
Sorby Hills – A low-cost Silver Producer?
52% Margin
7
AISC = All in Sustaining Cost or “Breakeven” cost
Project Costs Project Revenue
1 As at 20 October 2025
Increasing Silver Price
8
NPV8 A$411M
IRR 37%
Strong pre-tax
economics
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
Average Annualised Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
A$126M p.a. Average EBITDA
2.25Mtpa
Initial 8.5 Year
Mine Life
A$1.1B Operating Cash Flow
Sorby Hills Project
DFS & Front-End Engineering & Design (FEED) Complete
2024 FEED Study Highlights
Boab Metals Limited ASX: BML
8
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
Spot Macroeconomics
As at 20 October 2025
• Lead: A$3,030/t
• Silver: A$81.3/oz
• FX: 0.65 AUD:USD
• Spot Lead TC: minus US$65/t1
NPV8 = A$910M
IRR = 62%
1. Average of Spot TCs published by CRU and WoodMac for May 2025
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
9
Sorby Hills Project
Poised to be a Major Silver Producer
9
Boab Metals Limited ASX: BML
546kt Payable Lead
A$1.7B Revenue
17.2Moz Payable Silver
A$1.4B Revenue
Sorby Hills Revenue Split
A$3,030/t Pb and A$81.3/oz Ag
54%
46%
Company Asset
Silver Production
(koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2,414
Boab Metals Sorby Hills 2,191
Avg annualised production
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
*Source FY24 and FY25 Annual Reports
List is not exhaustive
Forecast Sorby Hills silver production versus
established silver producers within Australia
10
2024 - 2025
✓ Completion of a Front-End Engineering & Design Study
(“FEED Study”) delivering improved project economics1.
✓ Executed Agreement to acquire 100% Sorby Hills upon
Final Investment Decision2.
✓ Executed Binding Offtake and US$30 Million
Prepayment Facility with Trafigura3.
✓ EPA Part IV and EBPC approvals recieved4,6.
✓ Executed Agreement to Purchase the DeGrussa
Processing Plant from Sandfire Resources5.
1. ASX Release 6 June 2024
2. ASX Release 23 September 2024
3. ASX Release 10 December 2024
4. ASX Release 23 December 2024
5. ASX Release 30 April 2025
6. ASX Release 3 September 2025
10
Recent achievements provide Boab with significant momentum heading into FID
2022 - 2023
✓ Completion of the Sorby Hills Definitive
Feasibility Study (“DFS”)1.
✓ Heads of Agreement to source power
from the Ord-River Hydroelectric
Plant executed with Horizon Power2.
✓ Port Access Agreement executed with
port operators Cambridge Gulf3.
✓ 178-person Accommodation Facility
acquired and relocated to site4.
1. ASX Release 19 January 2023
2. ASX Release 22 April 2022
3. ASX Release 31 March 2022
4. ASX Release 15 September 2022
Boab Metals Limited ASX: BML
Sorby Hills Project
Progressing toward a Final Investment Decision
11
Sorby Hills Project
High Quality Resource
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag PbEq1 Pb Zn Ag
% % g/t % kt kt koz
A 0.6 5.3% 0.1% 23 6.1% 31 6 427
B 2.7 3.6% 0.3% 20 4.3% 97 8 1,720
Omega 17.2 3.3% 0.4% 34 4.5% 566 71 18,948
Norton 21.1 2.8% 0.4% 34 4.0% 590 96 24,090
Alpha 1.5 3.1% 0.9% 64 5.3% 45 13 2,975
Beta 4.2 3.6% 0.4% 43 5.1% 151 17 5,856
Measured 12.6 3.5% 0.4% 43 5.0% 444 45 17,521
Indicated 11.0 3.4% 0.4% 34 4.6% 377 46 12,114
Inferred 23.6 2.7% 0.5% 31 3.8% 645 117 23,406
Total 47.3 3.1% 0.4% 35 4.3% 1,465 207 53,042 Figure: Location of the Sorby Hills Resources
See ASX announcement 17 December 2021 1. See Appendix for Lead & Silver Equivalent calculation method
47.3Mt @ 123g/t Silver Equivalent
11
Boab Metals Limited ASX: BML
12
Sorby Hills Project (Stage 1)
Low Risk Open Pit Ore Reserve
See ASX announcement 19 January 2023
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A 4.1 3.7 0.5 3.7 16.4 4.3% 8.1
Pit B 14.8 12.6 2.3 3.2 17.4 3.8% 5.5
Omega South 21.1 18.3 2.8 2.9 29.5 3.9% 6.5
Omega Main 57.7 50.3 7.4 3.6 38.7 5.0% 6.8
Norton 21.4 19.5 1.9 4.0 78.5 6.8% 10.0
Beta 35.6 32.2 3.4 3.3 41.5 4.8% 9.5
Total Production 154.8 136.5 18.3 3.4 38.8 4.8% 7.5
Ore Reserve
Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz)
Proved 10.4 3.5% 42 358 14.1
Probable 4.9 3.5% 32 172 5.0
Total Ore Reserve 15.2 3.5% 39 531 19.1
FEED Study Production Target
Ore Reserve Statement
1. See Appendix for Lead Equivalent calculation method
Figure: DFS pit shells with respect to the Resource block model
Production Target
underpinned 83% by
Measured and Indicated
Resources.
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
57%
26%
17%
Measured Indicated Inferred
Boab Metals Limited ASX: BML
12
Production Target and Ore Reserve Growth Opportunities
✓ Large shallow deposit allowing for efficient and effective Resource definition
✓ Near-pit Resource extensions and defined strategic exploration targets
✓ Structural change in Silver pricing allowing for larger open pit designs
Acquisition of the DeGrussa Processing Plant from Sandfire Resources
significantly reduces and derisks project execution timeline
Sorby Hills Project
A head start on project delivery
14
Sorby Hills Project
Acquisition of the DeGrussa Processing Plant
14
Boab Metals Limited ASX: BML
Acquisition Terms
Total price of A$10M, comprising:
• Deposit paid: A$0.5M cash and A$1.0M
shares issued to Sandfire Resources
• Tranche 1 Payment: A$6.0M paid upon
completion (incl. Final Investment
Decision) and funded from proceeds of the
Sorby Hills project construction financing.
• Tranche 2 Payment: A$2.5M paid within 12
months of first sale of concentrate from the
Sorby Hills Project.
Derisking Project Execution from both a procurement and capital cost perspective
ASX Release 30 April 2025
15
Sorby Hills Project
DeGrussa Process Plant: An Ideal Fit
All major components for the
Sorby Hills Process Plant have
been secured via the DeGrussa
Process Plant acquisition
Fit for purpose specifications to
deliver the targeted 2.25Mtpa
throughput with minimal changes
Extensive list of new spares
included in the acquisition.
Boab commenced a competitive
tender process to price the
relocation, reconstruction and
refurbishment during Q3 2025 with
tender completion expected Q4
2025
Boab Metals Limited ASX: BML
15
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES during FEED showing key components of the
design that have been secured via the acquisition of the DeGrussa Processing Plant.
SAG Mill
Ball Mill
Tailings Thickener
Concentrate
Thickening
& Filtration
Flotation Circuit
Primary Crusher
Crushed Ore Storage Bin
16
Sorby Hills Project
High Quality Concentrate
Boab Metals Limited ASX: BML
16
Wyndham Port located just 150km from
Sorby Hills by existing sealed road.
Port Access Agreement executed with
port operators Cambridge Gulf
Concentrate to be transported from site
to Wyndham in sealed containers.
873kt of Concentrate shipped at an
average 103kt per annum.
• Average 65.8% Lead.
• Average 664 g/t Silver.
Highly competitive process including
global traders and smelters has
demonstrated the attractiveness of the
Sorby Hills concentrate product. Figure: Loading at Wyndham Port
17
17
Boab Metals Limited ASX: BML
• Boab have executed a US$30M Prepayment Facility
terms sheet with Trafigura1.
• Additionally, non-binding terms sheets2 have been
received from domestic and international financiers.
• Based on the terms sheets received, Boab is confident of
securing a financing solution for Sorby Hills that
achieves the level of gearing targeted by the Company.
• The Company is targeting FID in H2 2025.
Positive Project progress has supported meaningful progress with financiers
1. ASX Release 10 December 2024, Financial Close and drawdown of the Prepayment Facility are subject to, amongst other things, the
execution of definitive agreements, the finalisation of due diligence to Trafigura’s satisfaction and the Project being fully funded.
2. Terms sheets are non-binding, discussions remain preliminary and there is no certainty that a binding agreement will be reached."
Sorby Hills Project
Project Financing
18
Sorby Hills Project
Offtake and Prepayment Agreement
Boab Metals Limited ASX: BML
18
Attractive and flexible
offtake terms from
global commodities
trader Trafigura
US$30M Prepayment
represents a
cornerstone element of
targeted financing plan
for Sorby Hills.
Terms of the Agreement with Trafigura
Binding Prepayment Term Sheet
• US$30M for the development and construction of Sorby Hills.
• 5 Year Term, 18 Month repayment grace period.
• Interest Rate of Term SOFR + 5%.
• Repaid via monthly instalments following the grace period.
Binding Offtake Agreement
• 75% of the lead-silver Concentrate produced at Sorby Hills.
• Minimum Quantity of 531kt (~7 years based on the FEED Study).
• Market standard metal pricing and metal payabilities.
• Ability for Boab to scale back Offtake Percentage and
Minimum Quantity should the Prepayment Facility not
proceed or Boab’s sources alternative financing.
ASX Release 10 December 2024
19
Sorby Hills Project
Agreement to acquire 100% Interest
Boab Metals Limited ASX: BML
19
Further Project value
attributable to Boab
upon acquisition
+218kt Concentrate
+137kt Payable Lead
+4.3Moz Payable Silver
+A$228M NPV
based on Spot Marcroeconomics as of 20 October 2025
Lead: A$3,030/t Silver: A$81.3/oz, FX: 0.65 AUD:USD,
Spot Lead TC: minus US$65/t1
Terms of the Agreement
12-month option for Boab to acquire remaining 25% interest in
Sorby Hills from existing JV partner.
Full control over joint venture budgets and work programs
during the Option Period.
Should the Option be exercised, Boab will pay:
• Tranche 1: A$12.5M upon reaching a Final Investment
Decision at Sorby Hills;
• Tranche 2: A$5.5M payable within 12 months following first
concentrate production; and
• Tranche 3: A$5.0M payable within 18 months following first
concentrate production.
Importantly, the Option Agreement requires no immediate
payment and provides a new basis on which to engage potential
financiers.
ASX Release 23 September 2024
1. Average of Spot TCs published by CRU and WoodMac for May 2025
20
• ASX-listed base and
precious metals
developer and explorer.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Board & Management
team with a proven track
record in development.
• Top 20 shareholders hold
38% of issued capital.
# Holder Name 21 Oct 2025
1 Citicorp Nominees Pty Limited 5.97%
2 BNP Paribas Nominees Pty Ltd 5.81%
3 Villiers Queensland PL 5.00%
4 Zero Nominees Pty Ltd 3.29%
5 Sandfire Resources Ltd 2.86%
Capital Structure (21 October 2025)
Top 5 Shareholders
Share Price History
1. Tranche 2 Subject to shareholder approval at AGM late November. See Capital Raising ASX Release 14 October 2025
2. In addition to the $11.5m existing cash reserves the company has a $4.1m At the market (ATM) Facility available for use at the company’s absolute discretion (at 21 Oct 2025).
3. 7,600,000 Performance rights
20
Boab Metals Limited ASX: BML
Boab Metals
Corporate Snapshot
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.0
2.0
4.0
6.0
8.0
10.0
12.0
Share
Price
(A$/sh)
Volume
(M
Shares)
Volume Share Price
Metric Current Proforma1
Shares on Isse 292m 404m
Share Price 0.405 0.405
Market Capitalisation A$118m A$164m
Cash Position A$11.5m A$54.0m
Debt Nil Nil
Enterprise Value A$106m A$110m
21
Sorby Hills Project
A standout investment among peers
21
Boab Metals Limited ASX: BML
See Appendix for supporting information and BML Metal Equivalent Calculations
Project Sorby Hills Bowdens Wonawinta Paris Jervois
Location Western Australia New South Wales New South Wales South Australia Northern Territory
Company Boab Metals Silver Mines Manuka Resources Investigator Resources KGL Resources
Ticker ASX: BML ASX: SVL ASX: MKR ASX: IVR ASX: KGL
Market Cap
(21-Oct-25)
A$113M A$416M A$76M A$104M A$132M
Resource
47.3Mt @ 35g/t Ag,
3.1% Pb, 0.4%Zn
(123g/t AgEq.)
179Mt @ 31g/t Ag,
0.4% Zn, 0.3%Pb
(58g/t AgEq.)
38.5Mt @
41g/t Ag, 0.5%Pb
24Mt @
73g/t Ag 0.4% Pb
29.0Mt @ 25g/t Ag,
1.8% Cu, 0.2g/t Au
Reserves
15.2Mt @ 39g/t Ag,
3.5%Pb
32.8Mt @ 68g/t Ag,
0.4%% Zn, 0.3%Pb
6.4Mt @ 57g/t Ag Nil
14.4Mt @ 28g/t Ag,
1.8% Cu, 0.3g/t Au
Silver Reserves 19.1Moz 71.1Moz 11.6Moz Nil 12.8Moz
Latest Study
FEED Study
(June 2024)
Optimised Feas. Study
(December 2024)
Restart Study
(May 2025)
Pre-Feasibility Study
(November 2021)
Feasibility Study Update
(February 2025)
Project Status FID pending Finance Progressing Approvals Restart pending Finance Undertaking DFS FID pending Finance
Offtake Status
Awarded to Trafigura +
US$30M Prepay
Not yet awarded Sales direct to Refinery Sales direct to Refinery Awarded to Glencore
Process Plant 2nd Hand Plant Acquired Not yet built Existing Processing Plant Not yet built Not yet built
Approvals Status
Environmental
Approvals received
Development
Application pending
Approvals in place
Mining Lease
Application Pending
Approvals in place
22
Sorby Hills Project
Potential Near Term Share Price
Catalysts
Boab Metals Limited ASX: BML
22
Q4 2025
• Commencement of early site works.
• Secure additional non-dilutive debt finance to
support funding of the Sorby Hills Project.
• CAPEX update following DeGrussa relocation
tender process.
• Finalise remaining regulatory approvals required
to commence construction at Sorby Hills.
• Final Investment Decision at Sorby Hills.
23
Board and
Project
Delivery Team
Engineer with over 30 years’
experience in the Australian
mining industry, with a strong
track record in successfully
commissioning and operating
base metal mines.
Gary Comb
Chairman
Board and Management
with a proven track
record in project
development
Experienced mining executive
with a strong background in
management, capital raising
and operating JV’s with mid to
top tier miners in a variety of
commodities.
Simon Noon
Managing Director & CEO
Lawyer with significant
experience in the exploration
and mining industry. Wealth of
expertise in corporate advisory,
strategic consultancy and
raising capital.
Andrew Parker
Non-Exec. Director
Boab Metals Limited ASX: BML
23
Geologist with over 30 years’
experience in technical,
commercial, marketing and
finance within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Seasoned mining executive with over 28 years’ experience in the
development and operation of large-scale mining projects
across Australia and internationally. He has held senior executive
and project leadership roles with leading resources companies
including BHP, Peabody, Mineral Resources, Downer Mining,
and Thiess, as well as board positions with ASX-listed companies.
Russell Taylor
Project Director
24
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Thank You
24
25
Appendix
Appendix
25
26
Sorby Hills Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the east
Kimberley Region
Figure:
Location of the
Manbarrum
Project, Eight
Mile Creek
Project and
Keep n-Pb
Target relative
to Sorby Hills.
Manbarrum Zn-Pb-Ag Project
▪ located 25km east of the Sorby Hills Project.
▪ 175km2 of prospective tenements (including two
granted mining leases) covering geology related
to that found at Sorby Hills.
▪ Mineral Resources declared at two prospects
which are zinc and silver dominated.
▪ Conceptual open pit mining studies completed
by CSA Global in 2018.
Keep Zinc Lead Target
▪ New Zinc-Lead mineralisation recently discovered
via greenfield exploration within the existing Sorby
Hills mining leases.
▪ Ore grade intercepts include:
▪ SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb &
2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪ SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb &
5.86% Zn) and 36.7 g/t Ag from 303.0 m
Eight Mile Creek Project
▪ 30km of along-strike geology, highly prospective
for deposits similar to Sorby Hills.
▪ The exploration success based on seismic data at
the Keep Zinc-Lead Target has opened the door
for more bold exploration at Eight Mile Creek.
Eight Mile Creek
(Pb-Ag-Zn)
Keep Zn-Pb Target
Boab Metals Limited ASX: BML
26
ASX Release 22 October 2024
27
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster
• Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
• The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
• Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
Boab Metals
Establishing Deep Roots within the Local Community
27
Boab Metals Limited ASX: BML
28
PHYSICALS SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
ROM Mined Mt 18.3 - 0.4 2.1 2.3 2.4 2.5 2.3 2.0 1.1 3.0 0.3 -
Waste Mined Mt 134.6 - 3.8 11.7 14.3 25.7 25.4 21.0 17.3 13.0 4.2 0.2 -
% Measured % 56.7% - 67.3% 91.7% 64.7% 72.0% 89.7% 71.8% 47.7% 16.6% - - -
% Indicated % 26.5% - 32.7% 8.3% 35.3% 27.2% 8.9% 26.7% 49.7% 30.6% 31.1% - -
% Inferred % 16.8% - - - - 0.9% 1.4% 1.5% 2.7% 52.8% 68.9% 100.0% -
Lead Grade % 3.4% - 3.8% 4.1% 3.2% 3.8% 3.3% 3.1% 3.1% 3.6% 3.4% 2.9% -
Silver Grade g/t 39 - 24 39 28 60 50 22 27 42 41 50 -
Processed Tonnes Mt 18.3 - - 1.39 2.25 2.26 2.25 2.25 2.25 2.26 2.25 1.11 -
Lead Grade % 3.4% - - 5.5% 3.4% 4.0% 3.5% 3.1% 3.0% 2.5% 3.5% 3.0% -
Silver Grade g/t 39 - - 47 30 59 54 24 27 30 41 41 -
Lead Recovery % 91.6% - - 90.9% 94.1% 90.0% 88.0% 92.7% 94.7% 93.8% 90.3% 90.3% -
Silver Recovery % 81.7% - - 87.2% 86.2% 82.2% 81.4% 86.9% 86.9% 85.7% 70.4% 70.3% -
Concentrate Produced kt 873 - - 109 110 126 112 99 98 80 97 42 -
Lead Grade % 65.8% - - 64.2% 65.6% 63.5% 62.4% 65.9% 66.0% 65.7% 72.2% 72.3% -
Silver Grade g/t 664 - - 529 532 860 878 479 535 730 677 770 -
Payable Lead kt 546 - - 61 69 79 65 63 63 50 68 30 -
Payable Silver Moz 17.2 - - 1.5 1.7 3.2 3.0 1.4 1.5 1.8 2.0 1.0 -
Sorby Hills Feed Study
Life of Mine Physicals
Boab Metals Limited ASX: BML
28
29
FINANCIAL SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Lead Revenue A$M 1,803 - - 198 225 260 215 207 208 165 226 98 1,803
Silver Revenue A$M 693 - - 59 69 131 121 57 62 71 82 40 693
Total Revenue A$M 2,496 - - 257 295 392 337 264 269 236 308 138 -
TR/RCs A$M (191) - - (21) (23) (30) (26) (21) (21) (18) (22) (10) -
Royalties A$M (95) - - (10) (11) (14) (12) (10) (10) (9) (12) (5) -
Net Revenue A$M 2,209 - - 227 260 347 299 233 238 210 274 123 -
Logistics A$M (117) - - (14) (15) (17) (15) (13) (13) (11) (13) (6) -
Mining A$M (547) - - (51) (62) (94) (93) (81) (71) (54) (36) (4) -
Processing A$M (388) - - (38) (47) (47) (47) (47) (47) (47) (47) (24) -
G & A A$M (88) - - (10) (10) (10) (10) (10) (10) (10) (10) (5) -
Operating Cash Flow A$M 1,069 - - 114 126 180 134 81 96 88 167 84 -
Pre-production Capex A$M (264) (131) (133) - - - - - - - - - -
Sustaining Capex A$M (26) - - (12) (1) (3) (1) (0) - - - (5) (4)
Project Cash Flows A$M 778 (131) (133) 101 125 177 133 81 96 88 167 78 (4)
NPV8 A$M 411
IRR % 37
Average EBITDA A$M 126
Sorby Hills Feed Study
Life of Mine Cashflows
Boab Metals Limited ASX: BML
29
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
30
Sorby Hills FEED Study
Capital Cost Breakdown
Item
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract 134.9 - 134
Share your feedback
Discover