Corporate Presentation
Released
Released
Announcement PDF
BUILDING AUSTRALIA’S
NEXT SILVER-LEAD PRODUCER
SEPTEMBER 2026
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
Boab Metals
Disclaimer
Boab Metals
Disclaimer
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and represent
the Company’s intentions, projections, expectations or beliefs concerning, among other things,
future operating and exploration results or the Company’s future performance. These forward-
looking statements speak, and the presentation generally speaks, only at the date hereof. The
projections, estimates and beliefs contained in such forward-looking statements necessarily
involve known and unknown risks and uncertainties, and are necessarily based on assumptions,
which may cause the Company’s actual performance and results in future periods to differ
materially from any express or implied estimates or projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This presentation
may contain information (including information derived from publicly available sources) that has
not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian law. The
presentation does not constitute or form part of any invitation, offer for sale or subscription or any
solicitation for any offer to buy or subscribe for any shares in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the time of
preparation. No representation or warranty, express or implied is made as to the fairness, accuracy
or completeness of the information, opinions and conclusions contained in this presentation. To
the maximum extent permitted by law, Boab Metals Limited, its related bodies corporate and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility
or liability for any loss arising from the use of the presentation or its contents or otherwise arising in
connection with it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been extracted from
the Mineral Resource Estimate dated 17 December 2021, available to view at boabmetals.com. The
Company confirms that it is not aware of any new information that materially affects the
information included in the Mineral Resource Estimate and that all material assumptions and
technical parameters underpinning the estimates, continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and FEED
Study dated 19 January 2023 and 6 June 2024 respectively, available to view at
www.boabmetals.com. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the Ore Reserve Statement and that all material
assumptions and technical parameters underpinning the estimates, production targets and
financial forecasts continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been extracted from
the ASX Announcements titled “KEEP confirmed as a Target for Further Exploration” dated 22
October 2024, “Significant Intercepts at Sorby Hills” dated 8 November 2023, “Amended Drilling
Announcement” dated 4 September 2023”, “Assays Confirm Further Positive Outcome for Sorby”
dated 23 January 2023, “High-Grade Lead-Silver Confirmed at Beta Deposit” dated 1 February 2022
available to view at www.boabmetals.com. The Company confirms that it is not aware of any new
information or data that materially affects the information included in these announcements. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the form in which they were first presented.
2
Boab Metals
ABOUT US
Boab Metals
ABOUT US
Boab Metals Limited (ASX:BML) is an Australian
resources company specialising in the exploration,
development, and production of base and precious
metals. Based in Perth Western Australia, Boab is
positioning to become a significant new producer of
silver and lead, capitalising on strong silver and lead
market fundamentals to deliver long-term shareholder
value.
Boab also holds a portfolio of exploration assets with the
potential to support future resource growth and mine
life extensions.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
3
AUSTRALIA’S NEXT
SILVER-LEAD PRODUCER
Boab Metals
Discover Sorby Hills
Boab Metals
DISCOVER SORBY HILLS
Boab's flagship Sorby Hills silver-lead project in the
East Kimberley is Australia’s largest undeveloped,
near-surface silver-lead deposit.
This 100% owned project is fully funded and under
construction, targeting first production in the
second half of 2027.
Boab is taking a capital efficient approach to
developing Sorby Hills, leveraging existing regional
infrastructure and repurposing major assets to
reduce capital costs, construction timeline and the
need for new infrastructure.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
4
Strength Detail
Ownership 100%
Jurisdiction Tier-1 Western Australia
Mining
Method
Near-surface open-pit – low
complexity
Funding
>A$350M secured
(A$236M debt + A$117M equity)
Offtake Binding agreement with Trafigura
Plant
DeGrussa processing plant acquired
from Sandfire Resources
Timeline First concentrate H2 2027
Boab Metals
CORPORATE SNAPSHOT
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Capital Structure 04/09/2026
Shares on Issue 1 578 m
Share Price 45 cps
Market Capitalisation $260m
Cash Position $49m (31 August 2026)
Debt Outstanding Nil
Enterprise Value $211m
ASX-listed base and precious metals developer and explorer.
Final Investment Decision achieved on Sorby Hills.
Board &Management team with proven track record in development.
Top 20 shareholders hold 46% of issued capital.
Top Five Shareholders
# Holder Name 04/09/2026
1 Citicorp Nominees Pty Limited 14.60%
2 JP Morgan Nominees Australia PL 7.45%
3 BNP Paribas Nominees Pty 6.37%
4 HSBC Custody Nominees 2.94%
5 Villiers Queensland PL 2.21%
113.7m Performance rights
Substantial Shareholders
# Holder Name (Last Notice) 5 February 2026
1 Franklin Resources Inc. 7.12%
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
6
Boab Metals
INVESTMENT THESIS
Unlocking value through systematic Project derisking
Resource Definition Project Studies
and Permitting
Construction Phase Operations Phase/ Mine Life
Extension Drilling
BML acquires Sorby
Hills in 2018
Completion of Project
Feasibility Studies and
receipt of EPBC and EPA
Approvals
BML increase the Sorby
Hills Resource by 2.8x
Q4 – 2025, Boab Raises
+A$350M Debt and Equity
to Fully Fund Sorby Hills
development
Relative
Value
On Track for first
Production in H2 2027
Source, Lassonde Curve: Adapted from Lassonde, P. – Franco-Nevada Corporation
SILVER SNAPSHOT:
AT T H E CROSSROADS OF INDUSTRY & INVESTMENT
Ag
Silver
47
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Boab Metals
OUR COMMODITIES - SILVER
7
Unmatched conductivity makes silver
critical for solar panels, EV electronics and
central to the global energy transition.
INDUSTRIAL
DEMAND
As a monetary metal, silver is a store of
value, moving with gold during
inflationary or geopolitical uncertainty.
VALUE STORAGE
& SAFE HAVEN
With primary mine output declining, most
silver now coming only as a by-product,
and recycling stuck at ~20%, supply
cannot keep pace – entrenching a
structural deficit.
SUPPLY
SQUEEZE
Gold-silver ratio, investor flows to silver
EFTs, and leveraged futures trading all
leading to amplified volatility – giving silver
greater upside torque in bull markets.
SPECTULATIVE
KICKER
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
Source: Silver Institute Nov 2025 Interim /World Silver Survey 2025
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Boab Metals
OUR COMMODITIES - LEAD
8
A led-acid battery is typically replaced two
to three times in a light vehicle's average
lifetime of around 12 years, supporting a
demand tail that will stretch decades.
ENDURING
DEMAND
Indian consumption of refined lead is
forecast to grow 5% YOY through to 2030.
INDIAN LEAD
DEMAND
High demand for silver bearing lead
concentrate is delivering record low
Concentrate Treatment Charges (negative
US$65/t).
SILVER
LINING
A Mature secondary market provides a
buffer against price shocks, limiting the
lead price to a relative tight and
predictable range.
PRICE
STABILITY
Pb
Lead
82
LEAD SNAPSHOT:
T H E ORIGINAL BATTERY METAL
Source: ILZSG Statistical Bulletin Oct 2025
SORBY HILLS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
9
PROVIDING INVESTORS WITH EXPOSURE TO RISING SILVER PRICES WHILE LEVERAGING
ROBUST PROJECT ECONOMICS UNDERPINNED BY A HISTORICALLY STABLE LEAD PRICE
The fully funded Sorby Hills Project is a near-term production asset in a Tier 1 jurisdiction.
1. ASX Release 6 June 2024
Boab Metals
INVESTMENT THESIS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
10
Jurisdiction, Orebody
& Processing
Funding & Commercial
De-risking
Execution
Status
• Low-risk Shallow open
pit mining operation
• Stage 1 production, 8.5
years, ~2.2Moz silver
and 68kt lead per year1
• Conventional flotation
processing, delivering
strong recoveries in both
silver and lead.
• Offtake agreement with
Trafigura over 50% of
silver-lead concentrate
• ~A$350m funding
package secured to fully
fund the Project through
to production
• 100% project ownership
recently secured
• DeGrussa processing
plant acquisition
completed
• Final investment
decision made
• Construction underway
• First concentrate
targeted H2 2027
Company Asset Silver Production (koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2,414
Boab
Metals
Sorby Hills
2,191
(Average annualised production)
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
Sorby Hills Project
A NEW FORCE IN SILVER
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
*Source FY24 and FY25 Annual Reports. List is not exhaustive
11
Figure: Location of the Sorby Hills Project
The Sorby Hills Project is set to become one of
the heavyweights in Australian silver mining.
Sorby Hills Project
FEASIBILITY STUDY
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
12
NPV8 A$411M
IRR 37%
Strong pre-tax economics
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
Average Annualise Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
A$126M p.a. Average EBITDA
2.25Mtpa
Initial 8.5 Year
Mine Life
A$1.1B Operating Cash Flow
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
FEED Study Highlights
SORBY HILLS REVENUE SPLIT
546kt Payable Lead A$1.8b revenue
Assuming a spot silver price² of US$60/oz,
silver is expected to contribute over 50% of
forecast revenue.
1.ASX Release 6 June 2024 2. As at 15 July 2026, Ag US$60/oz, Pb = US$1,875/t
Based on FEED Study Assumptions inc
Silver @ US$27.4/oz
17.2Moz Payable Silver A$0.7b revenue
Sensitivity analysis in the FEED
Study demonstrates that a A$1
increase in the silver price
increases Project NPV by
approximately A$10m¹,².
Silver is currently trading >100%
above the price assumed in the
FEED Study.
Boab Metals
INVESTMENT THESIS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
13
FEED Study (NPV8 A$411M)
based US$27.4/oz Silver Price
Silver
Leverage
1. ASX Release 6 June 2024
2. See Appendix for FE E D Study sensitivity analysis
2.0
0
1.0
US$/lb Pb
Sorby Hills FEED Study
AISC ex-Silver Credits
US$0.81/lb Pb
10-Year average Lead Price**
US$0.94/lb Pb
+/-US$0.10/lb Pb
standard
deviation
Sorby Hills Net
Silver Credits*
US$0.84/lb Pb
INCREASING SILVER PRICE
* Based on spot price of US$60/oz Ag
** As at June 2026
55%
MARGIN
Operating costs covered by a non-volatile lead price.
Operating margin fully leveraged to silver price movements.
Sorby Hills Project Costs are more than covered by the 10-year average 1 Lead Price
50
-50
0
US$/oz Ag
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
Sorby Hills Net
“Lead Credits”
US$65/oz Ag
AISC = negative US$14/oz Ag
AISC = All in sustaining cost or ‘break even’ cost
The Sorby Hills Project is a low-cost silver producer.
AISC = negative US$14/oz Ag
Sorby Hills Project
COST STRUCTURE DELIVERING ‘FREE SILVER’
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Opex Revenue
14
57%
Measured
17%
Inferred
FEED STUDY PRODUCTION TARGET
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
AgEq
(g/t)
AgEq
(Moz)
Strip
Ratio
Pit A 4.1 3.7 0.5 3.7 16.4 5.2% 56 0.9 8.1
Pit B 14.8 12.6 2.3 3.2 17.4 4.8% 52 3.8 5.5
Omega South 21.1 18.3 2.8 2.9 29.5 5.6% 61 5.5 6.5
Omega Main 57.7 50.3 7.4 3.6 38.7 7.2% 78 18.4 6.8
Norton 21.4 19.5 1.9 4.0 78.5 11.3% 122 7.4 10.0
Beta 35.6 32.2 3.4 3.3 41.5 7.1% 77 8.4 9.5
Total Production 154.8 136.5 18.3 3.4 38.8 7.0% 75 44.4 7.5
ORE RESERVE STATEMENT
Ore Reserve
Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz) AgEq (Moz)
Proved 10.4 3.5% 42 358 14.1 26.7
Probable 4.9 3.5% 32 172 5.0 11.0
Total Ore Reserve 15.2 3.5% 39 531 19.1 37.5
Sorby Hills Project
LOW RISK OPEN PIT ORE RESERVE
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
1
See ASX announcement 6June2024
See Appendix for Metal Equivalent Calculation basis 15
57%
26%
17%
Measured Indicated Inferred
Production Target and Ore Reserve Growth Opportunities
✓Large shallow deposit allowing for efficient and effective Resource definition
✓Near-pit Resource extensions and defined strategic exploration targets
✓Structural change in Silver pricing allowing for larger open pit designs
Production Target underpinned 83% by Measured and Indicated Resources.
Including 95% Measured and Indicated Resources over the first 7 years of production.
See ASX announcement 17 Dec 2021
See Appendix for Metal Equivalent Calculation basis
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag PbEq AgEq Pb Zn Ag AgEq
% % g/t % g/t kt kt koz koz
A 0.6 5.3% 0.1% 23 7.4% 80 31 6 427 1,547
B 2.7 3.6% 0.3% 20 5.5% 59 97 8 1,720 5,107
Omega 17.2 3.3% 0.4% 34 6.5% 70 566 71 18,948 38,486
Norton 21.1 2.8% 0.4% 34 6.0% 64 590 96 24,090 43,554
Alpha 1.5 3.1% 0.9% 64 9.0% 97 45 13 2,975 4,699
Beta 4.2 3.6% 0.4% 43 7.6% 82 151 17 5,856 11,050
Measured 12.6 3.5% 0.4% 43 7.5% 81 444 45 17,521 32,713
Indicated 11.0 3.4% 0.4% 34 6.6% 71 377 46 12,114 24,995
Inferred 23.6 2.7% 0.5% 31 5.6% 60 645 117 23,406 45,619
Total 47.3 3.1% 0.4% 35 6.3% 68 1,465 207 53,042 104,077
Sorby Hills Project
104 MOZ SILVER EQUIVALENT
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
16
Sorby Hills Project Development on Track
Sorby Hills Project
DEVELOPMENT ON TRACK
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
17
Dismantling of the DeGrussa Processing Plant has
commenced
Long term Diesel Supply Contract executed with
Cambridge Gulf
Approximately 60% of the Phase IX drilling program
completed
Clearing of ROM Pad, Tailings Storage Facility and Haul
Road corridors completed ahead of schedule
Construction of the Evaporation Pond on track and topsoil
removal from Tailings Storage Facility has commenced
Crushed Ore Storage Bin
Figure: 3D Model of the Sorby Hills
Process Plant produced by GRES during
FEED showing key components of the
design that have been secured via the
acquisition of the DeGrussa Processing
Plant.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
18
Sorby Hills Project
DEGRUSSA PROCESSING PLANT
All major processing plant components, together with an extensive spares
inventory, have been secured through the acquisition of the DeGrussa
Processing Plant from Sandfire Resources.
The acquisition materially reduces capital costs, shortens the
construction schedule and lowers project execution risk.
• A$20M Saving in Processing Plant Capital Costs
• 6-Month Reduction in Construction Timeline
DeGrussa Plant Acquisition – Lower Cost, Faster Delivery
Sorby Hills Project Loading at Wyndham Port
Sorby Hills Project
LOADING AT WYNDHAM PORT
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
19
Wyndham Port located just 150km from Sorby Hills
by existing sealed road.
Port access Agreement executed with port operators
Cambridge Gulf. Concentrate to be transported from site to
Wyndham in sealed containers.
873kt of Concentrate shipped at an average 103kt pa.
• Average 664 g/t silver
• Average 65.8% lead
Spot Treatment Charges currently priced at minus US$145/t1 – versus
positive US$125/t benchmark assumed in the Sorby Hill FEED Study
Highly competitive offtake process including global traders and
smelters has demonstrated the attractiveness of Sorby Hills
concentrate product.
First production from Sorby Hills is scheduled to occur in H2 2027.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Sorby Hills Project
CONSTRUCTION TIMELINE
20
E P C C O N T R A C T E X E C U T E D
GR Engineering appointed for Sorby Hills EPC delivery
Contract value A$109M
A C Q U I S I T I O N C O M P L E T E D
DeGrussa plant acquisition completed May 2026
Assets aligned to 100ktpa concentrate target
D E G R U S S A P L A N T R E L O C A T I O N
Plant being dismantled and refurbished
Reconstruction at Sorby Hills
P R O J E C T W O R K S U N D E R W A Y
Early engineering underway and long-lead orders placed
Construction teams mobilised
D E V E L O P M E N T P R O G R E S S
On-site construction activity ramping up
Production remains on track for H2 2027
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
21
Sorby Hills Project
CONSTRUCTION UPDATE
FUTURE GROWTH OPPORTUNITIES
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
22
Sorby Hills Project
GROWTH POTENTIAL
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
o Current Mine Plan represents only 37% of the
defined Resource at Sorby Hills
o Large shallow Resource allowing for efficient
and effective Reserve growth
o Structural increase silver price allowing for re-
optimisation of open pit designs and potential
growth in the Mine life
o Current open pit designs were optimized using a
US$21.1/oz Silver Price
o Near-pit Resource extensions and defined
regional strategic exploration targets
23
Figure: DFS pit shells with respect to the Resource block model
Production Target and
Strategic Growth Opportunities
Resource to
Reserve
Ongoing conversion
drilling, focused on
upgrading portions of
the existing Mineral
Resource to support
mine life extension.
Resource
Expansion
Targeting extensions to
known mineralisation
and previously excluded
silver-rich zones, with
potential to grow the
Mineral Resource.
Exploration
Drilling within the
broader Sorby Hills
tenure, testing targets
identified from
geological interpretation
and historical datasets.
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Sorby Hills Project
NEAR TERM CATALYSTS
25
Project delivery, construction progress and resource growth
Mining Contract Award
Sorby Hills mining contract awarded
Construction Progress
DeGrussa plant reconstruction commences at
Sorby Hills
Project Delivery Plan
Updated costs, Ore Reserve and Mine Life
Reserve Growth
Exploration and mine-life extension program
updates
Resource/Reserve Growth
Results from exploration and mine-life extensional drilling
Competitive Tender
Tender process for the remaining concentrate production. 50% of
production available to optimise value
Favourable Market Conditions
Opportunity to capture exceptionally low treatment charges
Strategic Optionality
Flexibility to contract or sell into the spot market to maximise value
Q4 – 2026
Q3 – 2026
ASX: BML
Construction underway and advancing toward first production in 2027, with
multiple near-term catalysts to drive further project and shareholder value.
Simon Noon, Managing Director &CEO
www.boabmetals.com
info@boabmetals.com
+61 8 6268 0449
Facebook.com/boabmetalsltd
linkedin.com/company/boab-metals
@BoabMetals
Boab Metals
Thank you
Boab Metals
THANK YOU
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
26
Experienced mining
executive with a
strong track record in
project development,
capital raising,
corporate growth and
creating shareholder
value.
Simon Noon
Managing Director
& CEO
Sorby Hills Project
Excellence in project delivery
Sorby Hills Project
EXCELLENCE IN PROJECT DELIVERY
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
27
A Board and Management team with a proven track record in project development.
Engineer with over 30
years’ experience in the
Australian mining
industry, with a strong
track record in
successfully
commissioning and
operating base metal
mines.
Gary Comb
Chairman
Lawyer with significant
experience in the
exploration and mining
industry. Wealth of
expertise in corporate
advisory, strategic
consultancy and raising
capital.
Andrew Parker
Non-Exec. Director
Geologist with over 30
years’ experience in
technical, commercial,
marketing and finance
within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Mining executive with
30+ years’ experience in
large-scale mining.
Held senior leadership
roles with major
resources companies
including BHP,
Peabody, Mineral
Resources and Downer
Mining.
Russell Taylor
Project Director
-
100
200
300
400
500
600
700
800
900
1,000
-30% -25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25% 30%
Project
NPV8
(A$M)
Lead Silver FX Lead TC Opex Capex
Sorby Hills Project
FEED STUDY SENSITIVITY ANALYSIS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Assumption Unit FEED Spot1 Change
Lead Price US$/t 2,252 1,870 (17%)
Silver Price US$/oz 27.4 65.5 140%
FX A$:US$ 0.68 0.72 6%
Lead TC US$/t 125 (170)2
(236%)
1 As at 7 September 2026
2. Shanghai Metals Market – 7 September t2026
A 30% increase in Silver price increases NPV from A$411m to A$540m = delta of A$129m
A 30% increase in A$ Silver Price of A$40.3/oz = A$52.4/oz = delta of A$12.1/oz
Change in NPV vs Change in A$ Silver Price = A$129m / A$12.1/oz = A$10.7m/oz
ASX Release - 6 June 2024
28
Sorby Hills Project
METAL EQUIVALENT CALCULATIONS
B
O
A
B
M
E
T
A
L
S
L
I
M
I
T
E
D
|
ASX:
B
M
L
2026
/
27
Feed Study Macroeconomic Assumptions
The contained metal equivalence formula is based on
o Lead Price US$1,875/t; and
o Silver Price US$60.0/oz.
Lead Equivalent Calculations
• Silver recovery of 82% (weighted average of oxide and fresh
Ag recoveries); and
• Silver Payability rate of 95%.
Silver Equivalent Calculations
• Lead recovery of 91% (weighted average of oxide and fresh Pb
recoveries); and
• Lead Payability rate of 95%.
Pb
Ag
It is Boab’s opinion that all elements included in the metal
equivalent calculation have a reasonable potential to be recovered
and sold. The formula used to calculate equivalent grade is:
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
where R is the respective metallurgical metal recovery rate, S is
the respective smelter return rate, V is metal price/tonne or
ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary
metal (pri).
Metal equivalents are highly dependent on the metal prices used
to derive the formula. Boab notes that the metal equivalence
method used above is a simplified approach.
Owing to limited metallurgical data, zinc grades are not included at
this stage in the lead equivalent grade calculation.
Assumption Unit 2025 2026 2027 2028 2029+
Lead Price US$/t 2,259 2,268 2,269 2,254 2,251
Silver Price US$/oz 24.8 25.8 26.4 27.3 27.5
Exchange Rate A$:US$ 0.70 0.70 0.70 0.69 0.68
29
Share your feedback
Discover