Boab Metals Limited (ASX: BML) (“Boab” or “Company”) is pleased to provide the following
activities and cashflow report for the quarter ending 31 March, 2024. During the quarter, the
Company continued progressing its 75% owned Sorby Hills Lead-Silver-Zinc Project (“Sorby
Hills” or “the Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
•
•
FEED workstreams continue to deliver positive results for the Sorby Hills Project.
o
Updated Tenders for the Mining and Bulk Earthworks Contracts have
resulted in improved pricing over that adopted for the Sorby Hills Definitive
Feasibility Study.
o
Preliminary results from detailed metallurgical testwork indicate improved
metal recoveries can be achieved at Norton.
o
FEED Study on track to be released during the June quarter, 2024.
•
The Company is exploring opportunities to further reduce upfront capital costs and
accelerate project execution.
•
Offtake negotiations continue to progress well.
The Company had a cash balance of approximately A$1.4M in cash at 31 March 2024.
Boab Managing Director and CEO, Simon Noon, stated:
“Whilst it has been a relatively quiet quarter in terms of published results, the Company has
been busy behind the scenes on workstreams aimed at increasing Project value via enhanced
metal recoveries and reduced operating and upfront capital costs.
An updated tender for the mining and bulk earthworks contracts has delivered some of the
cost reductions we had hoped for. We are confident this result, together with the reconfirmed
post-FEED EPC pricing and positive preliminary results coming out of our metallurgical
testwork will enhance the Project economically and further derisk project execution.
We look forward to delivering the results of these workstreams over the coming quarter via
the publication of a FEED Study for the Sorby Hills Project and furthermore closing out offtake
negotiations and other exciting initiatives.
FEED Study Update
The Company continues to undertake a range of project optimisation and value-enhancing
workstreams as part of its Sorby Hills Front-End Engineering & Design (“FEED”) Study. The study
is on track to be released during the upcoming quarter.
Retender of Mining and Bulk Earthworks Contracts
For the Sorby Hills Definitive Feasibility Study (“DFS”), the Mining and Bulk Earthworks Contracts
were tendered separately and during a period of high inflation post COVID-19. Mining costs
comprised 44% and bulk earthwork cost 15% of the Project DFS operating and upfront capital costs
respectively (Figure 1).
Logistics,
9%
Lead Treatment Charge,
12%
Processing,
29%
Other, Pre Production
A$13m Opex, A$15m
Contingency, A$21m
G&A, 7%
Mining,
44%
Owners Costs,
A$25m
Earthworks
Package, A$36m
EPC
Package,
A$131m
Figure 1: Breakdown of the Sorby Hills DFS Operating and Capital Costs.
Subsequent to the DFS, Boab has re-optimised the project mining schedule to bring forward metal
production and GR Engineering completed FEED level design and pricing for the 2.25Mtpa
Process Plant. Off the back of these workstreams, Boab undertook a tender refresh of the Mining
and Bulk Earthworks Contracts on a bundled basis.
The results of the updated tender have now been received and analysed and have delivered the
positive pricing result the Company had been seeking. The updated pricing will be adopted in the
upcoming FEED study.
Metallurgical Test Work
Sorby Hills DFS metallurgical test work revealed variable recovery performance across ore samples
collected from the Norton deposit. Due to limited available samples at the time, Boab was unable
to definitively investigate the geometallurgical controls on the performance variability or test
different reagent regimes to enhance recovery.
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 2
As such, the Company adopted conservative metal recoveries for the DFS (Table 1). The
conservatism resulted in approximately 500kt of ore (17.7kt Lead and 1.3Moz Silver) dropping out
of the Norton mining inventory compared with the Sorby Hills Pre-Feasibility Study.
During 2023, the Company undertook a Phase VII diamond drilling campaign of which 13 holes
were dedicated to the collection of metallurgical core samples from the Norton deposit (Figure 2).
The testwork on these samples is nearing completion and preliminary results suggest that
improved recoveries can be achieved at the Norton deposit.
The updated testwork results are due to be released during the upcoming quarter and will be
incorporated into the FEED Study.
Table 1: DFS metal recoveries – Norton deposit versus Sorby Hills average (inclusive of Norton).
Ore Type
Avg. Pb Recovery
Avg. Ag Recovery
Norton DFS Recovery
78%
78%
Average DFS Recovery
91%
82%
Figure 2: Location of Phase VI & VII drill hole collars completed at the Norton deposit
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 3
Offtake Update
The Company has held positive discussions with Offtakers dating back prior to the DFS and
subsequently has shortlisted and advanced negotiations with preferred parties. Negotiations have
advanced to a stage where the Company anticipates awarding offtake in the coming quarter.
Approvals
During the quarter, the Company completed and documented the results of environmental
surveys requested by the Department of Climate Change, Energy, the Environment and Water
(“DCCEEW”). The results have been submitted to DCCEEW for review.
Financial and Corporate Overview
The consolidated cash balance of the Company as at 31 March 2024 was A$1.4M.
Boab’s ATM facility of up to $5,000,000 has not been utilised to date.
During the period, the Company paid $87k to related parties. These payments were made to
Directors of Boab Metals Limited in relation to salaries and directors’ fees, on normal commercial
terms.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@boabmetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company is
currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA. Boab
owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held by
Henan Yuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 4
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this activities report relating to Exploration Results has been extracted
from the ASX Announcements titled “Significant Intercepts at Sorby Hills” dated 8 November 2023,
“Amended Drilling Announcement” dated 4 September 2023”, “Assays Confirm Further Positive
Outcome for Sorby” dated 23 January 2023, “High-Grade Lead-Silver Confirmed at Beta Deposit”
dated 1 February 2022, and “Sorby Hills DFS Metallurgical Testwork Results” dated 19 November
2021 available to view at www.boabmetals.com.au. The Company confirms that it is not aware of
any new information or data that materially affects the information included in these
announcements. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the form in which they
were first presented.
Information included in this activities report relating to Mineral Resources has been extracted from
the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Information included in this activities report relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and dated
19 January 2023, available to view at www.boabmetals.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Ore
Reserve Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 5
Metal Equivalent Calculation Method
The contained metal equivalence formula is based on the Sorby Hills DFS including:
•
•
•
•
•
•
Lead Price US$2,253.19/t;
Lead recovery of 91.0% (weighted average of oxide and fresh Pb recoveries);
Lead Payability rate of 95%;
Silver Price US$27.4/oz;
Silver recovery of 81.8% (weighted average of oxide and fresh Ag recoveries); and
Silver Payability rate of 95%.
It is Boab’s opinion that all elements included in the metal equivalent calculation have a
reasonable potential to be recovered and sold.
The formula used to calculate lead equivalent grade is:
MetalEq (%) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri SpriVpriGpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return rate,
V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of potentially
recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab
notes that the metal equivalence method used above is a simplified approach. The metal prices
are based on the DFS values adopted and do not reflect the metal prices that a smelter would pay
for concentrate nor are any smelter penalties or charges included in the calculation. Owing to
limited metallurgical data, zinc grades are not included at this stage in the lead equivalent grade
calculation.
DFS Macroeconomic Assumptions
Assumption
Lead Price
Unit
US$/t
FY2023
FY2024
FY2025
FY2026
FY2027+
2,259
2,268
2,269
2,254
2,251
Silver Price
US$/oz
24.8
25.8
26.4
27.3
27.5
Exchange Rate
A$:US$
0.70
0.70
0.70
0.69
0.68
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 6
APPENDIX 1
INTERESTS IN TENEMENTS
Farm-In Agreements/
Projects/Tenements
Location
Held at Start of
Quarter
Held at End of
Quarter
Sorby Hills Project
M80/196
75%
75%
M80/197
75%
75%
75%
75%
75%
75%
M80/285
M80/286
WA, Australia
M80/287
75%
75%
E80/5317
100%
100%
EL31354
100%
100%
EL26938
51%
51%
51%
51%
51%
51%
EL28658
51%
51%
EL30305
51%
51%
MLN624
51%
51%
100%
100%
100%
100%
100%
100%
100%
100%
Borroloola West Project
EL26939
EL28508
NT, Australia
Manbarrum Project
EL24395
MA24518
NT, Australia
MA26581
Urrao Project
2791
Colombia
_________________________________________________________________________________________________________________________________________________
Quarterly Report March 2024
Page 7
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BOAB METALS LIMITED
Quarter ended (“current quarter”)
ABN
43 107 159 713
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 MARCH 2024
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
(535)
(1,908)
(b) development
-
-
(c) production
-
-
(d) staff costs
(156)
(514)
(e) administration and corporate costs
(225)
(834)
-
-
16
53
(a) exploration & evaluation (if expensed)
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other:Recharge of staff costs and other
administration costs to the Sorby JV
37
137
Net cash from / (used in) operating
activities
(863)
(3,066)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
1.9
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
(e) investments
-
-
(f)
-
(129)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(129)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
2.2
other non-current assets
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,286
4,618
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(863)
(3,066)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(129)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,423
1,423
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
5.1
Bank balances
371
426
5.2
Call deposits
1,000
1,860
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
52
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,423
2,286
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(87)*
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
*Salaries and Directors fees paid on normal commercial terms
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
-
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(863)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,423
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,423
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.64
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
(863)
-
-
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company is an exploration company that is entering into the development
stage of its lifecycle, as such, the company will maintain similar spend levels for the
foreseeable future and may need to raise additional capital as required.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The Company continually monitors its cash reserves in light of its expected
cashflow requirements, in the past Boab has been successful in raising capital be it
for working capital or an acquisition, the Board remains confident that further capital
can be raised to meet its future requirements. Further, the Company announced on
22 December 2023 that it had entered into a “At the Market” funding arrangement
with Acuity Capital for $5m of standby equity for the period up to 31 January 2027.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes for the reasons provided in 8.8.1 and 8.8.2
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which comply with
Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 April, 2024
Authorised for release by the Board of Directors of Boab Metals Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities
for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose
additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this
report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on
the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been
authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee –
eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By
the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying
with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the
board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been
properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows
of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is
operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover