A Near-Term Producer with a Margin
Highly Leveraged to the Silver Price
Corporate Presentation May 2025
ASX: BML
boabmetals.com
Delivering metals for a sustainable future
2
Disclaimer
Forward-Looking Statements
Compliance Statement
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning,
among other things, future operating and exploration results or the Company’s future
performance. These forward-looking statements speak, and the presentation generally
speaks, only at the date hereof. The projections, estimates and beliefs contained in such
forward-looking statements necessarily involve known and unknown risks and
uncertainties, and are necessarily based on assumptions, which may cause the
Company’s actual performance and results in future periods to differ materially from any
express or implied estimates or projections.
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and
guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources
and Ore Reserves.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly
available sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian
law. The presentation does not constitute or form part of any invitation, offer for sale or
subscription or any solicitation for any offer to buy or subscribe for any shares in Boab
Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the
time of preparation. No representation or warranty, express or implied is made as to the
fairness, accuracy or completeness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Boab Metals
Limited, its related bodies corporate and the officers, directors, employees, advisers and
agents of those entities do not accept any responsibility or liability for any loss arising
from the use of the presentation or its contents or otherwise arising in connection with it.
Boab Metals Limited ASX: BML
Information included in this presentation relating to Mineral Resources has been
extracted from the Mineral Resource Estimate dated 17 December 2021, available to view
at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Mineral
Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets
and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility
Study and FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve
Statement and that all material assumptions and technical parameters underpinning
the estimates, production targets and financial forecasts continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been
extracted from the ASX Announcements titled “KEEP confirmed as a Target for Further
Exploration” dated 22 October 2024, “Significant Intercepts at Sorby Hills” dated 8
November 2023, “Amended Drilling Announcement” dated 4 September 2023”, “Assays
Confirm Further Positive Outcome for Sorby” dated 23 January 2023, “High-Grade LeadSilver Confirmed at Beta Deposit” dated 1 February 2022 available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in these
announcements. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
form in which they were first presented.
2
3
Boab Metals
Corporate Summary
Share Price History
10.0
Capital Structure (1 May 2025)
8.0
Debt
Nil
Cash
A$2.6 million1
0.20
7.0
6.0
0.15
5.0
4.0
0.10
3.0
2.0
Market Cap
A$41 million
Performance Rights
7,600,000
Share Price (A$/sh)
Shares on Issue
242 million shares
9.0
Volume (M Shares)
Share Price
A$0.17/share
0.25
0.05
1.0
0.0
0.00
Top 5 Shareholders
#
Holder Name
1
Villiers Queensland PL
7.16%
2
Zero Nominees Pty Ltd
3.97%
3
Sandfire Resources Ltd
3.45%
4
Acuity Capital Investment
3.22%
5
Citicorp Nominees Pty Limited
3.07%
21 Jan 2025
Volume
Share Price
• ASX-listed base and
precious metals
developer and explorer.
• Board & Management
team with a proven track
record in development.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Top 20 shareholders hold
37% of issued capital.
1. As at 31 March 2025. In addition to the $2.6m existing cash reserves the company has a
$4.8m At the market (ATM) Facility available for use at the company’s absolute discretion
Boab Metals Limited ASX: BML
3
4
Sorby Hills Project
A near term producer of Lead & Silver
Investment Highlights
•
Located 50km northeast of Kununurra, Western
Australia, 150km by sealed road to Wyndham Port
•
47.3Mt Resource 4.3% PbEq (or 123g/t AgEq)1
•
Resource includes 53Moz contained Silver
•
Initial Production Target of 18.3Mt (39% of Resource)
underpinned by 83% Reserves with significant near pit
mine life extension opportunities
•
Conventional open pit mining and flotation process
plant producing a high-grade Lead-Silver concentrate
•
Definitive Feasibility and FEED Studies Complete –
NPV8 A$411M, IRR 37%
•
Concentrate Offtake awarded and Binding US$30M
Prepayment Term Sheet executed with Trafigura
•
High-Quality used Processing Plant secured from
Sandfire Resources DeGrussa project
•
Engagement with additional debt Financiers ongoing
•
Targeting a Final Investment Decision H2 2025
Boab Metals Limited ASX: BML
Figure: Location of the Sorby Hills Project
1.
See Appendix for Resource breakdown and Metal
Equivalent Assumptions
4
5
Sorby Hills Project
Progressing toward a Final Investment Decision
Recent achievements provide Boab with significant momentum heading into FID
2022 - 2023
2024 - 2025
✓ Completion of the Sorby Hills Definitive
Feasibility Study (“DFS”)1.
✓ Completion of a Front-End Engineering & Design Study
(“FEED Study”) delivering improved project economics1.
✓ Heads of Agreement to source power
from the Ord-River Hydroelectric
Plant executed with Horizon Power2.
✓ Executed Agreement to acquire 100% Sorby Hills upon
Final Investment Decision2.
✓ Port Access Agreement executed with
port operators Cambridge Gulf3.
✓ 178-person Accommodation Facility
acquired and relocated to site4.
1.
2.
3.
4.
ASX Release 19 January 2023
ASX Release 22 April 2022
ASX Release 31 March 2022
ASX Release 15 September 2022
Boab Metals Limited ASX: BML
✓ Executed Binding Offtake and US$30 Million
Prepayment Facility with Trafigura3.
✓ EPA Part IV Amendments received and approved4.
✓ Executed Agreement to Purchase the DeGrussa
Processing Plant from Sandfire Resources5.
1.
2.
3.
4.
5.
ASX Release 6 June 2024
ASX Release 23 September 2024
ASX Release 10 December 2024
ASX Release 23 December 2024
ASX Release 30 April 2025
5
6
Sorby Hills Project
Acquisition of the DeGrussa Processing Plant
Derisking Project Execution from both a procurement and capital cost perspective
Acquisition Terms
Total price of A$10M, comprising:
•
Deposit: A$0.5M cash and A$1.0M shares
issued to Sandfire Resources
•
Tranche 1 Payment: A$6.0M paid upon
completion (incl. Final Investment Decision)
and funded from proceeds of the Sorby
Hills construction equity raise.
•
Tranche 2 Payment: A$2.5M paid within 12
months of first sale of concentrate from the
Sorby Hills Project.
ASX Release X30 April 2025
Boab Metals Limited ASX: BML
6
7
Sorby Hills Project
DeGrussa Process Plant: An Ideal Fit
Primary Crusher
Crushed Ore Storage Bin
All major components for the
Sorby Hills Process Plant have
been secured via the DeGrussa
Process Plant acquisition
Flotation Circuit
SAG Mill
Concentrate
Thickening
& Filtration
Ball Mill
Tailings Thickener
Fit for purpose specifications to
deliver the targeted 2.25Mtpa
throughput with minimal changes
Extensive list of new spares
included in the acquisition.
Boab to commence a competitive
tender to price the relocation,
reconstruction and refurbishment
ahead of FID.
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES during FEED showing key components of the
design that have been secured via the acquisition of the DeGrussa Processing Plant.
Boab Metals Limited ASX: BML
7
8
Sorby Hills Project
FEED Study completed June 2024
FEED Study Highlights
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
Spot Macroeconomics
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
Average Annualise Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
NPV8 A$411M IRR 37%
Strong pre-tax economics
2.25Mtpa
8.5 Year Mine
Life
A$1.1B Operating Cash Flow
As at 28 April 2025
• Lead: A$3,113/t
• Silver: A$52.0/oz
• FX: 0.63 AUD:USD
• Spot Lead TC: minus US$16.3/t1
NPV8 = A$591M
1. Average of Spot TCs published by CRU and WoodMac for
February 2025
A$126M p.a. Average EBITDA
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
Boab Metals Limited ASX: BML
8
9
Sorby Hills Project
High Quality Resource
Deposit
Tonnes
(Mt)
Grade
Contained Metal
Pb
%
Zn
%
Ag
g/t
PbEq1
%
Pb
kt
Zn
kt
Ag
koz
A
0.6
5.3%
0.1%
23
6.1%
31
6
427
B
2.7
3.6%
0.3%
20
4.3%
97
8
1,720
Omega
17.2
3.3%
0.4%
34
4.5%
566
71
18,948
Norton
21.1
2.8%
0.4%
34
4.0%
590
96
24,090
Alpha
1.5
3.1%
0.9%
64
5.3%
45
13
2,975
Beta
4.2
3.6%
0.4%
43
5.1%
151
17
5,856
Measured
12.6
3.5%
0.4%
43
5.0%
444
45
17,521
Indicated
11.0
3.4%
0.4%
34
4.6%
377
46
12,114
Inferred
23.6
2.7%
0.5%
31
3.8%
645
117
23,406
Total
47.3
3.1%
0.4%
35
4.3%
1,465
207
53,042
See ASX announcement 17 December 2021
Figure: Location of the Sorby Hills Resources
1. See Appendix for Lead & Silver Equivalent calculation method
A different perspective - 47.3Mt @ 123g/t Silver Equivalent
Boab Metals Limited ASX: BML
9
10
Sorby Hills Project
Low Risk Open Pit Ore Reserve
FEED Study Production Target
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A
4.1
3.7
0.5
3.7
16.4
4.3%
8.1
Pit B
14.8
12.6
2.3
3.2
17.4
3.8%
5.5
Omega South
21.1
18.3
2.8
2.9
29.5
3.9%
6.5
Omega Main
57.7
50.3
7.4
3.6
38.7
5.0%
6.8
Norton
21.4
19.5
1.9
4.0
78.5
6.8%
10.0
Beta
35.6
32.2
3.4
3.3
41.5
4.8%
9.5
Total Production
154.8
136.5
18.3
3.4
38.8
4.8%
7.5
Figure: DFS pit shells with respect to the Resource block model
1. See Appendix for Lead Equivalent calculation method
Ore Reserve Statement
Ore Reserve
Category
Ore
(Mt)
Proved
Grade
Contained Metal
Pb (%)
Ag (g/t)
Pb (kt)
Ag (Moz)
10.4
3.5%
42
358
14.1
Probable
4.9
3.5%
32
172
5.0
Total Ore Reserve
15.2
3.5%
39
531
19.1
Production Target
underpinned 83% by
Measured and Indicated
Resources.
17%
26%
57%
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
Measured
Indicated
Inferred
See ASX announcement 19 January 2023
Boab Metals Limited ASX: BML
10
11
Sorby Hills Project
53Moz - A significant Silver Resource
Comparison of contained Silver in undeveloped Australian Silver deposits
124
180
107
160
140
120
80
73
(g/t Ag)
Contained Silver in Resource (Moz)
200
100
52
80
60
31
40
25
28
35
41
36
34
25
5
20
52
22
13
2
1
4
0
Reserve Ounces Contained
Boab Metals Limited ASX: BML
Non Reserve Ounces Contained
Resource Grade
Feasibility Study Complete
PFS Study Complete
Scoping Study Complete
See Appendix for support information
No Study
11
12
Sorby Hills Project
On Track to Become a Major Silver Producer
Forecast Sorby Hills silver production versus
established silver producers within Australia
A$3,040/t Pb and A$53/oz Ag
546kt Payable Lead
A$1.7B Revenue
FY24 Silver
Production (koz)*
Company
Asset
S32
Cannington
12,666
MMG
Rosebery
2,414
Boab Metals
Sorby Hills
Glencore
Mt Isa, George Fisher
2,189
MMG
Dugald River
1,853
Glencore
McArthur River
1,760
BHP
Prominent Hill, Carrapteena
1,134
29 Metals
Golden Grove
882
Evolution
All Assets
774
Boab Metals Limited ASX: BML
Sorby Hills Revenue Split
64%
2,191
Average forecast
annualised production
*Source FY24 Annual Reports
List is not exhaustive
36%
17.2Moz Payable Silver
A$0.9B Revenue
12
13
Sorby Hills Project
Confirmed Low-Cost producer
Independently confirmed as a 1st Quartile Project
on the Global Lead cost curve
2027 Lead Cost Curve (ex-works basis)
1st Quartile
3rd Quartile
4th Quartile
US$/t Lead
2nd Quartile
Low risk open cut
mining and high
process plant
throughput drives
low operating cost
relative to global
peers.
Sorby Hills Project
CRU, Independent Market Consultant Report for Boab Metals’ Sorby Hills Pb-Ag Project (Sept 2023).
Boab Metals Limited ASX: BML
13
14
Sorby Hills Project
Robust project economics
Profitable throughout the commodities cycle
6,000
Historic Metal Price vs forecast Sorby Hills Operating Costs
5,000
•
The Sorby Hills Project would
have generated an average
margin per/t PbEq of 36% over
the past 10-year metal price and
exchange rate cycle.
•
The Project would have been
largely cashflow positive based on
Lead revenue alone.
•
With the historically stable Lead
Price covering operating costs, the
Sorby Hills Project operating
profit is fully exposed to
movements in the Silver price
Historic Metal Price (A$/t PbEq)
A$/t
4,000
3,000
2,000
Historic Metal Price (A$/t Pb)
FEED Study C1 Cost A$2,388/t Pb
(excl. Silver Credit)
1,000
0
Jan-15
Jan-16
Lead Price (A$/t)
Jan-17
Jan-18
Jan-19
Jan-20
Jan-21
Lead Price + Silver Credit (A$/t PbEq)
Jan-22
Jan-23
Jan-24
C1 Cost - Pre-Silver Credit (A$/t)
* Based on an average Mine plan grades of 31.5 oz of paid silver per tonne of payable Lead
Boab Metals Limited ASX: BML
14
15
Sorby Hills Project
High Quality Concentrate
Wyndham Port located just 150km from
Sorby Hills by existing sealed road.
Port Access Agreement executed with
port operators Cambridge Gulf
Concentrate to be transported from site
to Wyndham in sealed containers.
873kt of Concentrate shipped at an
average 103kt per annum.
•
Average 65.8% Lead.
•
Average 664 g/t Silver.
Highly competitive process including
global traders and smelters has
demonstrated the attractiveness of the
Sorby Hills concentrate product.
Boab Metals Limited ASX: BML
Figure: Loading at Wyndham Port
15
16
Sorby Hills Project
Offtake and Prepayment Agreement
Terms of the Agreement with Trafigura
Binding Prepayment Term Sheet
•
US$30M for the development and construction of Sorby Hills.
•
5 Year Term, 18 Month Repayment Grace Period.
•
Interest Rate of Term SOFR + 5%.
•
Repaid via monthly instalments following the Grace Period.
Binding Offtake Agreement
•
75% of the lead-silver Concentrate produced at Sorby Hills.
•
Minimum Quantity of 531kt (~7 years based on the FEED Study).
•
Market standard metal pricing and metal payabilities.
•
Ability for Boab to scale back Offtake Percentage and
Minimum Quantity should the Prepayment Facility not
proceed or Boab’s sources alternative financing.
Attractive and flexible
offtake terms from
global commodities
trader Trafigura
US$30M Prepayment
represents a
cornerstone element of
targeted financing plan
for Sorby Hills.
ASX Release 10 December 2024
Boab Metals Limited ASX: BML
16
17
Sorby Hills Project
Agreement to acquire 100% Interest
Terms of the Agreement
12-month option for Boab to acquire remaining 25% interest in
Sorby Hills existing JV partner.
Full control over joint venture budgets and work programs
during the Option Period.
Should the Option be exercised, Boab will pay:
Further Project value
attributable to Boab
upon acquisition
+218kt Concentrate
•
Tranche 1: A$12.5M upon reaching a Final Investment
Decision at Sorby Hills;
+137kt Payable Lead
•
Tranche 2: A$5.5M payable within 12 months following first
concentrate production; and
+4.3Moz Payable Silver
•
Tranche 3: A$5.0M payable within 18 months following first
concentrate production.
+A$103M NPV
Importantly, the option agreement requires no immediate
payment and provides a new basis on which to engage potential
Financiers.
based on the Sorby Hills FEED Study - ASX
Release 6 June 2024
ASX Release 23 September 2024
Boab Metals Limited ASX: BML
17
18
Sorby Hills Project
Upcoming Share Price Catalysts
2025
• Complete competitive tender for the contract
to relocate, reconstruct and refurbish the
DeGrussa Processing Plant at Sorby Hills.
• Secure additional non-dilutive debt finance to
support funding of the Sorby Hills Project.
• Finalise regulatory approvals required
commence construction at Sorby Hills.
to
• Final Investment Decision at Sorby Hills.
• Sorby Hills Mine life extensional and infill drilling.
Boab Metals Limited ASX: BML
18
19
Board and
Technical Team
Gary Comb
Board and Management
with a proven track
record in exploration and
development
Technical Team
Boab Metals Limited ASX: BML
Simon Noon
Richard Monti
Andrew Parker
Chairman
Managing Director
and CEO
Non-Exec. Director
Non-Exec. Director
Engineer with over 30
years’ experience in the
Australian mining
industry, with a strong
track record in
successfully
commissioning and
operating base metal
mines.
Experienced mining
executive with a strong
background in
management, capital
raising and operating
JV’s with mid to top tier
miners in a variety of
commodities.
Geologist with over 30
years’ experience in
technical, commercial,
marketing and finance
within the exploration
and mining industry.
Lawyer with significant
experience in the
exploration and mining
industry. Wealth of
expertise in corporate
advisory, strategic
consultancy and raising
capital.
Bill Darcey - Project Manager
Simon Dorling - Exploration Manager
Mining professional with over 40 years of experience and a proven track record of
successfully managing, optimising, and developing mining operations. Bill was
previously Operations Manager at the Mt Garnet Cu-Pb-Zn operation, where he
oversaw the successful start-up and management of an 800,000 TPA zinc-lead
operation in China. Bill holds degrees in both mining engineering and metallurgy.
Geologist with more than 26 years’ experience in exploration,
development and the mining of base metals, precious metals, energy
minerals and industrial minerals.
19
20
Thank You
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
20
21
Appendix
Appendix
21
22
Sorby Hills Project
Manbarrum Zn-Pb-Ag Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the east
Kimberley Region
Figure:
Location of the
Manbarrum
Project, Eight
Mile Creek
Project and
Keep n-Pb
Target relative
to Sorby Hills.
▪
located 25km east of the Sorby Hills Project.
▪
175km2 of prospective tenements (including two
granted mining leases) covering geology related
to that found at Sorby Hills.
▪
Mineral Resources declared at two prospects
which are zinc and silver dominated.
▪
Conceptual open pit mining studies completed
by CSA Global in 2018.
Keep Zinc Lead Target
▪
New Zinc-Lead mineralisation recently discovered
via greenfield exploration within the existing Sorby
Hills mining leases.
▪
Ore grade intercepts include:
▪
SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb &
2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪
SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb &
5.86% Zn) and 36.7 g/t Ag from 303.0 m
Keep Zn-Pb Target
Eight Mile Creek
(Pb-Ag-Zn)
Eight Mile Creek Project
Boab Metals Limited ASX: BML
▪
30km of along-strike geology, highly prospective
for deposits similar to Sorby Hills.
▪
The exploration success based on seismic data at
the Keep Zinc-Lead Target has opened the door
for more bold exploration at Eight Mile Creek.
ASX Release 22 October 2024
22
23
Boab Metals
Establishing Deep Roots within the Local Community
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster
•
Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
•
The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
•
Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Boab Metals Limited ASX: BML
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
23
24
Sorby Hills Feed Study
Life of Mine Physicals
PHYSICALS SUMMARY
Unit
Total
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
ROM Mined
Mt
18.3
-
0.4
2.1
2.3
2.4
2.5
2.3
2.0
1.1
3.0
0.3
-
Waste Mined
Mt
134.6
-
3.8
11.7
14.3
25.7
25.4
21.0
17.3
13.0
4.2
0.2
-
% Measured
%
56.7%
-
67.3%
91.7%
64.7%
72.0%
89.7%
71.8%
47.7%
16.6%
-
-
-
% Indicated
%
26.5%
-
32.7%
8.3%
35.3%
27.2%
8.9%
26.7%
49.7%
30.6%
31.1%
-
-
% Inferred
%
16.8%
-
-
-
-
0.9%
1.4%
1.5%
2.7%
52.8%
68.9%
100.0%
-
Lead Grade
%
3.4%
-
3.8%
4.1%
3.2%
3.8%
3.3%
3.1%
3.1%
3.6%
3.4%
2.9%
-
Silver Grade
g/t
39
-
24
39
28
60
50
22
27
42
41
50
-
Processed Tonnes
Mt
18.3
-
-
1.39
2.25
2.26
2.25
2.25
2.25
2.26
2.25
1.11
-
Lead Grade
%
3.4%
-
-
5.5%
3.4%
4.0%
3.5%
3.1%
3.0%
2.5%
3.5%
3.0%
-
Silver Grade
g/t
39
-
-
47
30
59
54
24
27
30
41
41
-
Lead Recovery
%
91.6%
-
-
90.9%
94.1%
90.0%
88.0%
92.7%
94.7%
93.8%
90.3%
90.3%
-
Silver Recovery
%
81.7%
-
-
87.2%
86.2%
82.2%
81.4%
86.9%
86.9%
85.7%
70.4%
70.3%
-
Concentrate Produced
kt
873
-
-
109
110
126
112
99
98
80
97
42
-
Lead Grade
%
65.8%
-
-
64.2%
65.6%
63.5%
62.4%
65.9%
66.0%
65.7%
72.2%
72.3%
-
Silver Grade
g/t
664
-
-
529
532
860
878
479
535
730
677
770
-
Payable Lead
kt
546
-
-
61
69
79
65
63
63
50
68
30
-
Payable Silver
Moz
17.2
-
-
1.5
1.7
3.2
3.0
1.4
1.5
1.8
2.0
1.0
-
Boab Metals Limited ASX: BML
24
25
Sorby Hills Feed Study
Life of Mine Cashflows
FINANCIAL SUMMARY
Unit
Total
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
Lead Revenue
A$M
1,803
-
-
198
225
260
215
207
208
165
226
98
1,803
Silver Revenue
A$M
693
-
-
59
69
131
121
57
62
71
82
40
693
Total Revenue
A$M
2,496
-
-
257
295
392
337
264
269
236
308
138
-
TR/RCs
A$M
(191)
-
-
(21)
(23)
(30)
(26)
(21)
(21)
(18)
(22)
(10)
-
Royalties
A$M
(95)
-
-
(10)
(11)
(14)
(12)
(10)
(10)
(9)
(12)
(5)
-
Net Revenue
A$M
2,209
-
-
227
260
347
299
233
238
210
274
123
-
Logistics
A$M
(117)
-
-
(14)
(15)
(17)
(15)
(13)
(13)
(11)
(13)
(6)
-
Mining
A$M
(547)
-
-
(51)
(62)
(94)
(93)
(81)
(71)
(54)
(36)
(4)
-
Processing
A$M
(388)
-
-
(38)
(47)
(47)
(47)
(47)
(47)
(47)
(47)
(24)
-
G&A
A$M
(88)
-
-
(10)
(10)
(10)
(10)
(10)
(10)
(10)
(10)
(5)
-
Operating Cash Flow
A$M
1,069
-
-
114
126
180
134
81
96
88
167
84
-
Pre-production Capex
A$M
(264)
(131)
(133)
-
-
-
-
-
-
-
-
-
-
Sustaining Capex
A$M
(26)
-
-
(12)
(1)
(3)
(1)
(0)
-
-
-
(5)
(4)
Project Cash Flows
A$M
778
(131)
(133)
101
125
177
133
81
96
88
167
78
(4)
NPV8
A$M
411
IRR
%
37
A$M
126
Average EBITDA
Boab Metals Limited ASX: BML
25
26
Sorby Hills FEED Study
Capital Cost Breakdown
Total upfront capital cost of A$264M
including A$22.7M contingency.
~66% of capital costs underpinned by
tendered pricing, including an updated
Process Plant EPC pricing following the
completion of Front-End Engineering &
Design by GRES.
A$32M Owner Costs including
operational readiness items such as
critical spares and owner’s team.
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract
134.9
-
134.9
Site Est / Bulk Earthworks
31.9
4.9
36.9
Water Management
8.1
11.7
19.8
Accommodation Village
11.5
-
11.5
Other Infrastructure
8.5
0.6
9.1
Owners Costs
32.0
-
32.0
Contingency
22.7
-
22.7
Pre-Production Opex
15.0
-
15.0
-
9.3
9.3
264.5
26.5
290.9
Item
Closure Costs
Total Capital Costs
Opportunities being explored to
further reduce upfront capital costs
and project implementation risk.
Boab Metals Limited ASX: BML
26
27
Sorby Hills FEED Study
Operating Cost Breakdown
Competitive C1 cash cost of US$0.36/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Unit Costs
Total
(A$M)
A$/t ore
US$/lb payable Pb
Logistics
117
6.4
0.07
Mining
547
30.0
0.31
Processing
388
21.3
0.22
G&A
88
4.8
0.05
Lead Treatment
160
8.8
0.09
C1 Costs (ex-Credits)
1,300
71.2
0.74
Net Silver Credits
(661)
(36.2)
(0.37)
C1 Costs
639
35.0
0.36
Royalties
95
5.2
0.05
Sustaining Capital
26
1.4
0.01
AISC
760
41.6
0.43
Item
Unit Operating Costs based on 18.3Mt of Ore, 546kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Boab Metals Limited ASX: BML
27
28
Sorby Hills Project
Continuing to Delivering Silver
Exposure to Investors
▪ Since the acquisition of the
Sorby Hills Project in June
2018, Boab’s share price has
exhibited a strong
correlation with movements
in the price of Silver.
Rolling 30-day average daily % changes in USD Silver price & BML share price since June 2018
2.00%
USD Silver 30-day
Avg Daily % Change
6.00%
30 Day Average Daily Return
4.00%
2.00%
-6.00%
-4.00%
1.50%
1.00%
0.50%
0.00%
-2.00%
0.00%
2.00%
4.00%
6.00%
0.00%
-0.50%
BML 30-day Avg
Daily % Change
▪ Significant positive
movements in Silver price
correspond to significant
positive movements in the
Boab share price
-1.00%
-2.00%
-1.50%
-4.00%
Jun-18
Dec-18 Jun-19
Dec-19 Jun-20 Dec-20 Jun-21
BML
Boab Metals Limited ASX: BML
Dec-21 Jun-22 Dec-22 Jun-23 Dec-23 Jun-24
-2.00%
Silver
28
29
Sorby Hills Project
Exposure to Silver Price
Operating Costs covered by a historically non-volatile Lead
Price leaves the Operating margin fully leveraged to Silver
price movements.
2.0
Viewed differently, the Sorby
Hills Project may be considered
a low-cost silver producer
US$/oz
US$/lb
Increasing Silver Price
50
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
1.0
38% Margin
Sorby Hills AISC
ex-Silver Credits
US$0.81/lb Pb
0
Project Costs
Sorby Hills Net
Silver Credits*
US$0.37/lb Pb
AISC = negative US$14/oz Ag
Sorby Hills
Net Lead “Credits”
US$65/oz Ag
0
10-Year average
Lead Price
US$0.93/lb Pb
AISC = negative US$14/oz Ag
-50
Project Revenue
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
*Based on FEED Study Price of US$27/oz Ag
Sorby Hills – A low-cost Silver Producer?
AISC = All in Sustaining Cost or “Breakeven” cost
1 As at 5 August 2024
Boab Metals Limited ASX: BML
29
30
Sorby Hills Project
Peer Comparison
(as at 18 April 2025)
Project
Commodity
Tick
Company
Proved
(g/t)
Probable
(g/t)
Total
(g/t)
Measured
(g/t)
Indicated
(g/t)
Inferred
(g/t)
Total
(g/t)
Source
Bowdens
Silver
SVL
Silver Mines Limited
32
69
1
51
33
68
100
42
43
21
36
14
179
31
Resource Report – 10 January 2025
Admiral Bay
Zinc
ARI
Arika Resources Limited
-
-
-
-
-
-
-
-
-
-
170
25
170
25
2023 Annual Report
Maronan
Silver
MMA
Maronan Metals Limited
-
-
-
-
-
-
-
-
2
155
30
104
32
107
Resource Report – 12 March 2024
Walford Creek
Copper
AML
Aeon Metals Limited
-
-
-
-
-
-
17
23
28
25
28
35
73
28
Resource Report – 15 March 2023
Peterlumbo
Silver
IVR
Investigator Resources Ltd
-
-
-
-
-
-
-
-
17
75
7
67
24
73
2024 Annual Report
Sorby Hills
Lead
BML
Boab Metals Limited
10
42
5
32
15
39
13
43
11
34
24
31
48
35
Resource Report – 17 December 2021
Wonawinta
Silver
MKR Manuka Resources Limited
1
51
4
54
5
54
1
47
12
46
25
39
38
41
Pre-Feasibility Study - 29 October 2024
Kempfield
Silver
ARD
Argent Minerals Limited
-
-
-
-
-