Half Year Accounts
Released
Released
Announcement PDF
ABN: 43 107 159 713
CONSOLIDATED INTERIM FINANCIAL REPORT
For the Half Year Ended
31 December 2023
CORPORATE DIRECTORY
________________________________________________________
DIRECTORS
Gary Comb (Chairman)
Simon Noon (Managing Director & CEO)
Richard Monti (Non-Executive Director)
Andrew Parker (Non-Executive Director)
COMPANY SECRETARY
Jerry Monzu
REGISTERED OFFICE
4 Clive Street
WEST PERTH WA 6005
SHARE REGISTRY
Automic Group Pty Ltd
Level 5, 191 St Georges Terrace
PERTH WA 6000
BANKERS
Australian and New Zealand Banking Group Limited
Level 1, 1275 Hay Street
WEST PERTH WA 6005
AUDITORS
BDO Audit (WA) Pty Ltd
Level 9 Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
STOCK EXCHANGE LISTING
Boab Metals Limited shares are listed on the
Australian Stock Exchange (Home Branch – Perth)
ASX code ‘BML’
WEBSITE ADDRESS
www.boabmetals.com
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 1
TABLE OF CONTENTS
________________________________________________________________
DIRECTORS’ REPORT
3
AUDITOR’S INDEPENDANCE DECLARATION
13
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
14
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
15
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
16
CONSOLIDATED STATEMENT OF CASH FLOWS
17
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
18
DIRECTORS’ DECLARATION
25
INDEPENDENT AUDITOR’S REVIEW REPORT
26
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 2
DIRECTORS’ REPORT
________________________________________________________________
Your Board of Directors (“Board” or “Directors”) present their report on the consolidated entity (referred
to hereafter as the Group) consisting of Boab Metals Limited (the “Company” or “Boab”) and the
entities it controlled at the end of, or during, the period ended 31 December 2023.
DIRECTORS
The names of the Company’s Directors and Secretary in office during the half year and until the date of
this report are set out below.
Gary Comb
Simon Noon
Richard Monti
Andrew Parker
Jerry Monzu
Non-Executive Chairman
Managing Director and CEO
Non-Executive Director
Non-Executive Director
Company Secretary
REVIEW OF OPERATIONS
During the half year to 31 December 2023, Boab Metals Limited continued to focus on the development
of its 75% owned Sorby Hills Lead-Silver-Zinc Project (‘Sorby Hills’ or the ‘Project’), located within the
Kimberley Region of Western Australia. The Project is Australia’s largest undeveloped, near-surface
lead-silver-zinc deposit with granted mining leases, EPA approvals and is located 50km from
established infrastructure in Kununurra and 150km from Wyndham Port.
Key activities undertaken during the period included:
•
Phase VII drilling program completed (Figure 1) and assay results received.
•
Assays confirm a significant intercept at the Keep Seismic Target.
•
Metallurgical test work arising from the Phase VII program underway.
•
Process Plant Front End Engineering & Design (‘FEED’) completed.
•
Refreshed Pricing for Processing Plant EPC Contract received.
•
Updated mining and bulk earthworks contract tenders received.
•
Sorby Hills Project forecast as a low-cost producer by CRU Global.
•
Heads of Agreement executed with the Shire of Wyndham and East Kimberley (‘SWEK’)
for the construction and long-term lease of a new accommodation facility within
Kununurra.
•
Approvals workstreams progressing.
•
Construction, financing and offtake discussions continue.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 3
DIRECTORS’ REPORT
________________________________________________________________
Figure 1: Phase VII drilling at the Sorby Hills Project
PHASE VII DRILLING PROGRAM
The Phase VII drilling program concluded with the completion of 22 drill holes for 2,634 metres (an
additional 24% of metres drilled than originally planned). Of the total program 1,434m across 13 holes
were drilled for a metallurgical purpose with another 1,200m across 9 holes drilled for resource/reserve
expansion and exploratory objectives. Collar locations the completed holes are shown in Figure 2. Key
results included:
•
SHSD_171: 11.05 m @ 17.63% PbEq (10.98% Pb & 189 g/t Ag) from 81.95m
•
SHSD_174: 11.60 m @ 20.23% PbEq (8.78%Pb & 325 g/t Ag) from 74.40m
•
SHSD_164: 6m @ 9.92% PbEq (3.92% Pb & 170g/t Ag) from 101m
•
SHSD_183: 2m @ 6.85% PbEq (4.43% Pb & 69g/t Ag) from 103m
•
SHSD_184: 2.8m @ 3.84% PbEq (3.17%Pb & 19g/t Ag from 129m
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 4
DIRECTORS’ REPORT
________________________________________________________________
Figure 2: Plan view of the Sorby Hills Project showing the locations of completed drill holes
for Phase VII with respect to previous drilling, the Mineral Resource and DFS open pit outlines.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 5
DIRECTORS’ REPORT
________________________________________________________________
Keep Exploration Target
A highlight of the Phase VII drilling program included a significant intercept from the maiden hole drilled
at the Keep Seismic Target located approximately 2km from the existing Sorby Hills Reserves.
The interpretation of seismic data from petroleum exploration across the Burt Range Sub-Basin resulted
in a conceptual drill target – The Keep Seismic Target. SHSD_185 was aimed at testing the potential
for a mineralised feeder fault system which can be seen in the seismic data and the potential for
stratiform mineralisation at the Knox Formation/Sorby Dolomite interface (Figure 3).
Figure 3: Detailed view of section and geological interpretation of SHSD_185 seismic line
WP_96-08
Assay results confirmed the significance of the observed mineralisation:
•
SHSD_185: 9.55m @ 5.10% PbEq (2.59% Pb & 2.26% Zn) from 242.55m
•
Including 3.12m @ 13.43% PbEq (6.37%) Pb & 6.36% Zn) and 26.5 g/t Ag from
245.36m
The Company is of the view that the initial analytical and geological results at the Keep Seismic Target
are a major exploration success proving up concept and importantly the potential of several kilometres
of thick sedimentary rocks of the Burt Range Basin to be the source of significantly more base metal
mineralisation. Further drilling will be undertaken during the upcoming field season.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 6
DIRECTORS’ REPORT
________________________________________________________________
Norton North Exploration Drilling
Further exploration success was encountered on the northern periphery of the Norton deposit with
drilling of holes SHSD_164 and SHS_183 (Figure 4). The drill holes intersected mineralisation at the
target depth of approximately 100m down hole and add to the confidence of continuity of mineralisation
in this area and further confirm the high-grade silver component of the deposits. The mineralisation
remains open to the north.
Figure 4: Cross section of the northern extension drilling at Norton
Norton Metallurgical Drilling
The metallurgical portion of the program was underpinned by the prospect of the spatially restricting or
revising upwards recovery factors of ore from Norton and to provide additional core upon which further
test work can be undertaken.
The intervals encountered testify to the robustness of the Norton mineralisation with its clean low-iron
and high silver values within the mineralisation envelope:
•
SHSD_171: 11.05m @ 17.63% PbEq (10.98% Pb & 189 g/t Ag) from 81.95m and
•
SHSD_174: 11.60m @ 20.23% PbEq (8.78% Pb & 325 g/t Ag) from 74.40m
Beta Exploration Drilling
SHSD_184 was drilled at the western periphery of the Beta Deposit to test the continuity of
mineralisation. The hole intersected a noteworthy interval of mineralisation at around 129m below
surface:
•
SHSD_184: 2.80m @ 3.84% PbEq (3.17% Pb & 19 g/t Ag) from 129.0m
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 7
DIRECTORS’ REPORT
________________________________________________________________
METALLURGICAL TEST TO ENHANCE RECOVERIES AT NORTON
The metallurgical testwork arising from the Phase VII program commenced during the period. The
testwork is centred on the opportunity to enhance metal recoveries from the Norton Deposit compared
to the conservative metal recoveries adopted in the DFS. The flotation testing and analysis will occur in
Q1 2024 with final results forecast for early Q2 2024.
FEED TENDER PRICING COMPLETE
The updated tender pricing following the conclusion of FEED was obtained for key contracts including
the processing plant, bulk earthworks and mining contract.
REFRESHED PROJECT PLANT EPC TENDER
Following the conclusion of the FEED on the process plant by preferred tenderer GR Engineering
Services (‘GRES’) Boab was provided with a refreshed price for the EPC contract. In the DFS, the EPC
component of the project upfront capital expenditure was A$131M (over 50%). This costing was based
on the tender provided by GRES in 2022. The refreshed pricing has delivered a result that is consistent
with the DFS pricing. This was a significant and positive result given the capital cost inflation being
observed industry-wide and one that provides confidence that a large portion of the project capital cost
is well in hand.
UPDATED MINING TENDER
The Company has finalised repricing activities for the Mining Contract based on the updated mining
schedule. The proposals obtained have highlighted opportunities to further reduce mining costs which
the Company are now investigating further.
REFRESHED BULK EARTHWORKS DESIGN AND TENDER
The bulk earthworks design was updated in line with the FEED level Process Plant layout and updated
Water and Tailings Management Plan. Furthermore, the retendering of the mining contract offered the
opportunity to seek pricing of the Bulk Earthworks Contract based on bundling it with the Mining
Contract.
INDEPENDENT COST ANALYSIS
As part of the ongoing financier due diligence process, Boab received an independent assessment of
the projects relative operating costs from reputable market consultant CRU Global.
The analysis by CRU placed Sorby Hills in the first quartile of projected global lead producers in 2027
on an ex-works basis (i.e. Mining, Processing and C&A costs, before by-product credits) (Figure 5)
underlining the competitive advantage of the Sorby Hills Project as an open pit mine.
The projected ex-works operating costs are covered by a historically non-volatile lead price indicating
the Project’s high leverage to fluctuation in the price of silver.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 8
DIRECTORS’ REPORT
________________________________________________________________
Figure 5: Global Lead Cost Curve 2027 (ex-works basis)
HOA EXECUTED WITH THE SHIRE OF WYNDHAM AND EAST KIMBERLEY
A Heads of Agreement (‘HOA’) was executed on 19 July 2023 between Sorby Management Pty Ltd
(‘SMPL’) and the Shire of Wyndham and East Kimberley for the construction and long-term lease of a
new 180-person accommodation Facility located in Kununurra.
The HOA outlines the terms on which SMPL would fund pre-construction work including approvals,
workstreams and conceptual design in return for securing a 10-year lease for the facility with an option
to extend for a further 5 years. The HOA states that SMPL’s pre-construction costs would be rebated
against leasing costs and SWEK would fund and oversee detailed design and construction of the facility.
APPROVALS
The Sorby Hills Project has Environmental Protection Authority (‘EPA’) approval via a Ministerial
Statement approving open pit mining and associated infrastructure. A s45C application seeking
amendments to the current approval is currently under assessment by the regulator.
During the period, Boab met with the EPA to discuss its required amendments and the Company
expects the 45C to progress over the next quarter. The Project received clearance under the
Environmental Protection and Biodiversity Conservation Act (‘EPBC’) act in 2013. However, given the
increased scale the Company deemed it prudent to seek reconfirmation. In a request for further
information received during the quarter, the Department of Climate Change, Energy, the Environment
and Water (‘DCCEEW’) confirmed the project is now considered a “controlled action” under the EPBC
act, however, can be assessed with only preliminary documentation required.
The Company has secured the services of a specialist consultant to undertake a Survey commencing
in January and subsequently compile the response for the DCCEEW by the end of Q1 2024.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 9
DIRECTORS’ REPORT
________________________________________________________________
FINANCING AND OFFTAKE
The Company is currently working through the completion documentation and modelling of the project
optimisation workstreams and intends to deliver the results via a Sorby Hills FEED Study to be released
to the market in Q2 2024. The production of a documented FEED Study will not delay the ongoing
engagement with potential project financiers.
The Company has held positive discussions with Offtakers dating back prior to the DFS and
subsequently has shortlisted and advanced negotiations with preferred parties. Recently, Boab has
opened discussion with Offtakers with respect to providing finance to compliment that sought from other
potential lenders. Whilst negotiations on offtake are well progressed, the company has reserved its
right to award offtake for the Sorby Hills Concentrate to maximise the potential for securing project
finance from the Offtake parties.
CORPORATE ACITIVITIES
$5M EQUITY FACILITY ESTABLISHED
The Company established an At-The-Market Equity subscription Agreement (ATM). The ATM provides
Boab with up to $5,000,000 of standby equity capital over the coming 38-month period until 31 January
2027.
Boab will have full discretion as to the maximum number of shares to be issued, the minimum issue
price of shares and the timing of each subscription. There are no requirements on Boab to utilise the
ATM and Boab may terminate the ATM at any time without cost or penalty.
ANNUAL GENERAL MEETING
The Company held its Annual General Meeting on 6 November 2023 with all resolutions put to
Shareholders approved on a poll.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
No significant changes have occurred in the state of affairs of the Group during the half year.
MATTERS SUBSEQUENT TO END OF THE HALF YEAR
There have been no matters that would require disclosure subsequent to the end of the half year.
METAL EQUIVALENT CALCULATION METHOD
The contained metal equivalence formula is based on the Sorby Hills DFS including:
•
Lead Price US$2,253.19/t.
•
Lead recovery of 91.0% (weighted average of oxide and fresh Pb recoveries).
•
Lead Playability rate of 95%.
•
Silver Price US$27.4/oz.
•
Silver recovery of 81.8% (weighted average of oxide and fresh Ag recoveries).
•
Silver Payability rate of 95%.
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 10
DIRECTORS’ REPORT
________________________________________________________________
The formula used to calculate lead equivalent grade is: MetalEq (%) = Gpri + (Gpri × [∑i Ri Si Vi Gi
]/(Rpri SpriVpriGpri)) where R is the respective metallurgical metal recovery rate, S is the respective
smelter return rate, V is metal price/tonne or ounce, and G is the metal commodity grade for the suite
of potentially recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes that
the metal equivalence method used above is a simplified approach. The metal prices are based on the
DFS values adopted and do not reflect the metal prices that a smelter would pay for concentrate nor
are any smelter penalties or charges included in the calculation. Owing to limited metallurgical data,
zinc grades are not included at this stage in the lead equivalent grade calculation.
COMPLIANCE STATEMENTS
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the
‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in
Australasia of Exploration Results, Mineral Resources and Ore Reserves. Information included in this
activities report relating to Exploration Results has been extracted from the ASX Announcements titled
“Significant Intercepts at Sorby Hills” dated 8 November 2023, “Amended Drilling Announcement” dated
4 September 2023”, “Assays Confirm Further Positive Outcome for Sorby” dated 23 January 2023,
“High-Grade Lead-Silver Confirmed at Beta Deposit” dated 1 February 2022, and “Sorby Hills DFS
Metallurgical Testwork Results” dated 19 November 2021 available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or data
that materially affects the information included in these announcements. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially
modified from the form in which they were first presented.
Information included in this report relating to Mineral Resources has been extracted from the Mineral
Resource Estimate dated 17 December 2021, available at www.boabmetals.com.au. The Company
confirms that it is not aware of any new information or data that materially affects the information
included in the Mineral Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Mineral Resource Estimate.
Information included in this report relating to Ore Reserves, Production Targets and Financial Forecasts
has been extracted from the Sorby Hills Definitive Feasibility Study and dated 19 January 2023,
available at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve Statement and
that all material assumptions and technical parameters underpinning the estimates, production targets
and financial forecasts continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially
modified from the Ore Reserves Statement.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 11
DIRECTORS’ REPORT
________________________________________________________________
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditor’s independence declaration as required under section 307C of the Corporations
Act 2001 is set out on page 13. This report is signed in accordance with a resolution of the directors.
Gary Comb
Chairman
8 March 2024
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 12
AUDITOR’S INDEPENDENCE DECLARATION
________________________________________________________________
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 13
FINANCIAL REPORT
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
For the half year ended 31 December 2023
________________________________________________________________
Note
Revenue
Expenditure
Exploration Expenses
Administration Expenses
Corporate Expenses
Depreciation Expenses
Occupancy Expenses
Salaries and Employee Benefit Expenses
Share Based Payments
Depreciation of Right of Use Assets
Interest paid on leased liabilities
(Loss) Before Income Tax
Income Tax
Total (Loss) for the Financial Period
Other Comprehensive Income
Movement in Foreign Exchange Translation Reserve
Total Comprehensive (Loss)
Total Comprehensive (Loss) Attributed to the
Members
Basic and Diluted Loss per Share for Loss
Attributable to the Ordinary Equity Holders of the
Company (Cents per Share)
3
4
7
31 Dec 2023
31 Dec 2022
$
134,222
$
124,106
(1,471,337)
(81,687)
(274,112)
(19,702)
(34,876)
(398,703)
(193,413)
(35,539)
(1,146)
(2,376,293)
(2,376,293)
(2,441,405)
(105,474)
(150,990)
(48,894)
(18,708)
(450,506)
(76,436)
(35,153)
(1,434)
(3,204,894)
(3,204,894)
(1,855)
(2,378,148)
15,259
(3,189,635)
(2,378,148)
(3,189,635)
(1.55)
(2.04)
The above Consolidated Statement of Profit or Loss and Other Comprehensive Income should be
read in conjunction with the Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 14
FINANCIAL REPORT
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
At 31 December 2023
________________________________________________________________
Note
Current Assets
Cash and Cash Equivalents
Trade and Other Receivables
Prepayments
Total Current Assets
31 Dec 2023
$
30 Jun 2023
$
2,240,162
617,490
155,660
3,013,312
4,578,654
510,954
49,928
5,139,536
4,643,995
60,000
77,208
1,656,673
146,986
6,584,862
9,598,174
4,643,995
60,000
76,333
1,676,350
28,957
6,485,635
11,625,171
Current Liabilities
Trade and Other Payables
Provisions
Lease Liability
Total Current Liabilities
874,848
129,328
36,230
1,040,406
803,622
162,047
30,495
996,164
Non-Current Liabilities
Lease Liability
Provisions
Deferred tax liability
Total Non-Current Liabilities
Total Liabilities
Net Assets
111,603
73,457
162,647
347,707
1,388,113
8,210,061
71,564
162,647
234,211
1,230,375
10,394,796
53,677,822
1,637,401
(47,105,162)
8,210,061
53,677,822
1,445,843
(44,728,869)
10,394,796
Non-Current Assets
Exploration and Evaluation Assets
Investments
Other Assets
Plant and Equipment
ROU Asset
Total Non-Current Assets
Total Assets
Equity
Contributed Equity
Reserves
Accumulated Losses
Total Equity
4
5
6
The above Consolidated Statement of Financial Position should be read in conjunction with the
Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 15
FINANCIAL REPORT
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the half year ended 31 December 2023
________________________________________________________________
Foreign
Currency
Translation
Reserve
Accumulated
Losses
Total
$
1,763,293
-
$
(317,450)
-
$
(44,728,869)
(2,376,293)
$
10,394,796
(2,376,293)
-
-
(1,855)
-
(1,855)
Total Comprehensive (Loss)
for the Period
-
-
(1,855)
(2,376,293)
(2,378,148)
Issue of Shares/Options
-
-
-
-
-
Issue costs
Share Based Payments
Balance at 31 December 2023
53,677,822
193,413
1,956,706
(319,305)
(47,105,162)
193,413
8,210,061
2022
Balance at 1 July 2022
48,198,398
1,526,601
(333,442)
(38,811,436)
10,580,121
-
-
-
(3,204,894)
(3,204,894)
-
-
15,259
-
15,259
2023
Balance at 1 July 2023
(Loss) for the Period
Other Comprehensive (Loss)
for the Period
(Loss) for the Period
Issued
Capital
Share /
Option
Reserve
$
53,677,822
-
Other Comprehensive (Loss)
for the Period
Total Comprehensive (Loss)
for the Period
Issue of Shares
-
-
15,259
(3,204,894)
(3,189,635)
5,658,589
-
-
-
5,658,589
Issue costs
(305,244)
Share Based Payments
Balance at 31 December 2022
(305,244)
-
76,436
-
-
76,436
53,551,743
1,603,037
(318,183)
(42,016,330)
12,820,267
The above Consolidated Statement of Changes in Equity should be read in conjunction with the
Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 16
Financial Report
CONSOLIDATED STATEMENT OF CASH FLOWS
For the half year ended 31 December 2023
Note
31 Dec 2023
31 Dec 2022
$
$
Cash Flows from Operating Activities
Expenditure on Mining Interests
Payments to Suppliers and Employees
Interest Received
Other Income
Net Cash (Outflow) from Operating Activities
(1,299,085)
(1,010,646)
38,026
99,915
(2,171,790)
(2,540,968)
(537,683)
3,099
137,621
(2,937,931)
(129,326)
-
-
13,200
Cash Flows from Investing Activities
Expenditure on Development costs
Proceeds on disposal of assets
Payments for Purchase of Property, Plant and
Equipment
Net Cash (Outflow) from Investing Activities
(129,326)
(1,583,781)
(1,570,581)
-
5,658,588
(37,376)
(305,244)
(35,733)
(37,376)
5,317,611
(2,338,492)
809,099
4,578,654
6,317,527
-
-
2,240,162
7,126,626
Cash Flows from Financing Activities
Proceeds from Issues of Shares
Payments of Share Issue Costs
Payments on Lease Liability
Net Cash (Outflow)/Inflow from Financing
Activities
Net (Decrease)/Increase in Cash and Cash
Equivalents
Cash and Cash Equivalents at the Beginning of the
Financial Year
Effects of Foreign Exchange
Cash and Cash Equivalents at the End of the
Financial Period
The above Consolidated Statement of Cash Flows should be read in conjunction with the Consolidated Notes
to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 17
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2023
________________________________________________________________
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Boab Metals Limited (the “Company”) is a for-profit company limited by shares, incorporated and
domiciled in Australia, and whose shares are publicly traded.
These consolidated interim financial statements of Boab Metals Limited (BML or the Company) and
controlled entities (Group) for the half year reporting period ended 31 December 2023 have been
prepared in accordance with Australian Accounting Standard AASB 134: Interim Financial Reporting
and the Corporations Act 2001. The Group is a for profit entity for financial reporting purposes under
Australian Accounting Standards. Compliance with AASB 134 ensures compliance with International
Financial Reporting Standard IAS 34 ‘Interim Financing Reporting’.
This interim financial report does not include full disclosure of the type normally included in an annual
report. It is recommended that this financial report be read in conjunction with the annual financial report
for the year ended 30 June 2023 and any public announcements made by BML during the half year
reporting period in accordance with the continuous disclosure requirement of the Corporation Act 2001.
The accounting policies have been consistently applied with those of the previous financial year and
corresponding interim report period, except in relation to the matters disclosed below.
Going Concern
The financial report has been prepared on a going concern basis which contemplates the continuity of
normal business activity and the realisation of assets and settlement of liabilities in the normal course
of business.
The Group has established an at the Market Funding Facility with Acuity Capital which will provide up
to $5m in standby capital over the next 38-month period, refer to note 6 for further details.
The directors have prepared an estimated cash flow forecast for the 12 month period from date of this
report to determine if the Group will require additional funding during the period. Based on the cash
flow forecast, the Directors are satisfied that there are reasonable grounds to believe that the Group will
be able to operate as a going concern on the basis that the Group will be able to raise further funds
through capital raisings and/or reduce operating expenditure as required.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 18
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2023
________________________________________________________________
Adoption of new and revised Accounting Standards
Standards and interpretations applicable to 31 December 2023
In the period ended 31 December 2023, the Directors have reviewed all of the new and revised
Standards and interpretations issued by the AASB that are relevant to the Group and effective for
the current annual reporting period. As a result of this review the Directors have determined that
there is no material impact of the new and revised Standards and Interpretations on the Group.
Standards and interpretations in issue not yet effective
The directors have also reviewed all of the new and revised standards and interpretations in issue
not yet effective for the half year ended 31 December 2023.
As a result of this review, the directors have determined that there will be no material impact of
these standards and interpretations on the Group and, therefore, no change is necessary to Group
accounting policies.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2024
Page 19
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2023
________________________________________________________________
2.
SEGMENT INFORMATION
AASB 8 requires operating segments to be identified based on internal reports provided to the Board
in order to allocate resources to the segments and assess performance. Information reported to the
Board is based on exploration in the principal locations of the Group’s projects, Australia and
Colombia. The revenues and profit generated by each of the Group’s operating segments, assets and
liabilities are summarised as follows.
The following is an analysis of the Group’s revenue and results by reportable operating segment
for the half-year under review:
Australia
Colombia
Revenue
Half Year Ended
31-Dec-23
31-Dec-22
$
$
134,222
124,106
134,222
124,106
Operating (Losses)
Half Year Ended
31-Dec-23
31-Dec-22
$
$
(2,372,582)
(3,197,454)
(3,711)
(7,440)
(2,376,293)
(3,204,894)
The following is an analysis of the Group’s assets and liabilities by reportable operating segment:
Assets
Australia
Colombia
Liabilities
Net Assets
31-Dec-23
$
9,595,443
2,733
30-Jun-23
$
11,621,554
3,620
31-Dec-23
$
(1,380,663)
(7,452)
30-Jun-23
$
(1,227,607)
(2,771)
31-Dec-23
$
8,214,779
(4,719)
30-Jun-23
$
10,393,947
849
9,598,176
11,625,174
(1,388,115)
1,230,378)
8,210,061
10,394,796
3. REVENUE
From Continuing Operations
Sorby Hills Revenue
Interest Received
Other Income – Gain on Sale of Motor Vehicle
4.
31-Dec-23
Share your feedback
Discover