Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2023
Quarterly Activities and Cashflow Report
for the period ending 30 September 2023
Boab Metals Limited (ASX: BML) (“Boab” or “Company”) is pleased to provide the following
activity and cashflow report for the quarter ending 30 September 2023. During the quarter, the
Company continued progressing its 75% owned Sorby Hills Lead-Silver-Zinc Project (“Sorby
Hills” or “the Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
•
Updated Mining Contract Tenders received. The Mining Contract was tendered for the
DFS at the height of post COVID inflation. The Company is confident the updated
tender will deliver a positive outcome for the Project.
•
Refreshed Pricing for Processing Plant EPC Contract received from GR Engineering
Services (“GRES”) on the back of Front-End Engineering and Design (“FEED”). The
update has resulted in negligible change from the DFS pricing.
•
Phase VII drill program completed – 22 Holes (2,624m) targeting mine life extensions
and enhanced metallurgical recoveries at the Norton Deposit. Assays due to be
received and reported in November 2023.
o
One Hole targeting the conceptual “Keep Seismic Target”, located 2km south
of the B deposit, returned a new intercept of visual mineralisation over a 15m
interval from 242m including intervals of massive sphalerite (Zinc Sulphide).
•
Approvals workstreams progressing.
•
Construction Financing and Offtake discussions continue.
•
The Company had a cash balance of approximately A$3.0M at 30 September 2023.
Boab Managing Director and CEO, Simon Noon, stated:
“Industry-wide we are seeing project capital and operating costs increasing rapidly. Pleasingly,
a refreshed tender for our Mining Contract and updated pricing for the Process Plant EPC
Contract from GRES off the back of FEED have delivered positive results and support the robust
tender-backed costing we included in the Sorby Hills Definitive Feasibility Study.
The refreshed pricing, together with other project optimisation workstreams, including
updated metallurgical testwork at Norton using drill core from our recently completed Phase
VII drilling program, will support our ongoing discussions with project financiers.
The Company is sufficiently funded to complete the ongoing optimisation workstreams which
we expect to enhance economic outcomes and shareholder value.
Project Optimisation
The Company continues to undertake a range of Project Optimisation workstreams as part of its
ongoing discussion with project financiers and progression toward a Final Investment Decision at
the Sorby Hills Project.
Refreshed Project Plant EPC Tender
Following the conclusion of the Front-End Engineering and Design (“FEED”) process, GRES
provided Boab with a refreshed price for the Project Plant EPC contract. In the DFS, the EPC
component of the project upfront capital expenditure was A$131M (over 50%) (Figure 1). This
costing was based on the tender provided by GRES in 2022.
The refreshed pricing has delivered a result that is consistent with the DFS pricing. This is a
significant and positive result given the capital cost inflation being observed industry-wide and
one that provides confidence that a large portion of the project capital cost is well in hand.
Figure 1: Breakdown of Sorby Hills DFS Capital Costs
Updated Mining Tender
Mining costs comprised over 40% of the Sorby Hills DFS operating costs. The costs were primarily
backed by a competitive tender process undertaken in 2022 during the height of post-COVID
inflation. Since then, the Company has updated the Sorby Hills mining schedule as part of an
updated tailings strategy. Boab used the opportunity to retender for the mining contract in mid2023. As the tender process nears its conclusion, the Company has been satisfied with the
submissions and is confident that the results will deliver a positive outcome for the Project.
Furthermore, the Company is confident that bundling the Mining Contract with the circa A$36M
capital Earthworks Package (Figure 1) - for which a refreshed tender process is ongoing, will deliver
efficiencies and even more competitive pricing.
Metallurgical testwork to enhance metal recoveries at Norton
A primary focus of the recently completed Phase VII program was to recover drill core samples for
use in metallurgical testwork to support updated metal recoveries from the Norton Deposit
compared to the conservative metal recoveries adopted in the DFS (Table 1), A total of 13 holes
were drilled at the Norton Deposit to achieve this objective (Figure 2).
The Testwork Program is expected to be completed Q1 2024. If successful, this will allow
reoptimistion of the Norton pit design to increase cash flows and extend mine life.
Table 1: Metal Recoveries adopted for the DFS
Ore Type
Avg. Pb Recovery
Avg. Ag Recovery
A Pit
95%
84%
B Pit
94%
84%
Norton
78%
78%
Omega
93%
70%
Beta
90%
87%
Overall Average
91%
82%
Figure 2: Location of Phase VII drill holes (green) relative to the outline of the current Norton open pit
design and Resource classifications
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 3
Phase VII Drill Program
The Phase VII drilling program was completed during the quarter. A total of 2,634m were drilled
across 22 holes (24% more than originally planned as a result of efficient drilling rates). Primary
objectives of the program were:
•
acquisition of core from the Norton Deposit to support further metallurgical testwork;
•
exploration of mineralisation extensions proximal to the northern edge of the Norton Pit.
Assay results for the Phase VII program are due to be received in November, 2023.
Extension drilling at Norton
During the Phase VI drilling campaign, the northern portion of Norton was targeted to test
mineralisation continuity. The positive results, including 2m @ 10.9% Pb intersected in drill hole
SHMR_149 before it was terminated due to ground conditions. Encouraged by this result Boab
decided to continue to target the area in the Phase VII drilling program.
Figure 3 shows a southwest–northeast cross section through the Norton deposit presenting the
interpreted geology and mineralisation relative to the current open pit design and drilling –
including drill holes SHSD_175, 164 and 183 from the Phase VII program.
Figure 3: Cross section of the northern extension drilling at Norton showing the current Norton Pit design
and geological interpretation
Keep Seismic Target
The interpretation of historic seismic data across the Burt Range Sub-Basin resulted in a
conceptual drill target – the Keep Seismic Target. A 306.5m deep drill hole (SHSD_185) was
successfully drilled into the Keep Seismic Target as part of the Phase VII drilling program.
Seismic line WP96-08 traverses the project area about 2km south of B-Deposit and shows the
reflectors of the Devonian-Carboniferous sedimentary strata gradually dip to the east and affected
by a series of extensional faults (Figure 4) leading into a half-graben structure.
SHSD_185 intersected:
•
An Upper Mineralised Zone of ~5m of stratiform bands and disseminated mineralisation
from 82.5m; and
•
A Lower Mineralised Zone: ~14m of stratiform Mississippi Valley Type Zinc and Lead
sulphides bands and disseminated mineralisation from 242.5m.
The result represents a potential new discovery with scope for extensive development of
mineralisation. Boab intends to follow up the intersection with an aggressive drill campaign
during the next field season.
Figure 4 - Geological interpretation of SHSD_185 and data from seismic line WP_96-08
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 5
Approvals
The Company is currently awaiting the outcome of its submission to the Department of Climate
Change, Energy, the Environment and Water (“DCCEEW”) with respect to reconfirmation of the
Company’s classification as “Not a Controlled Action” under the Environmental Protection and
Biodiversity Conservation Act (“EPBC”). The Project received clearance under the act in 2013. In
light of the increased scale of the Project relative to the original submission, the Company deemed
it prudent to seek reconfirmation.
Self-assessment by Boab utilising the ‘Protected Matters Search Tool’ has been completed on the
DCCEEW website and identified no new potential impacts from the proposed operations, outside
those that were assessed previously. The Company expects an outcome from the reconfirmation
process in the coming weeks.
Financing and Offtake
The Company is currently working through the completion, documentation and modelling of the
project optimisation workstreams and intends to deliver the results via a Sorby Hills FEED Study
to be released to the market in Q1 2024. The production of a documented FEED Study will not
hold up the ongoing engagement with potential project financers. The Company is confident the
optimisation work to date will address key areas of risk.
The Company has held positive discussions with Offtakers dating back prior to the DFS and
subsequently has shortlisted and advanced negotiations with preferred parties. More recently,
Boab has opened discussions with Offtakers with respect to providing finance to compliment that
sought from other potential lenders. Whilst negotiations on offtake are well progressed, the
Company has reserved its right to award offtake for the Sorby Hills concentrate in order to
maximise the potential for securing project finance from the Offtake parties.
Financial and Corporate Overview
The consolidated cash balance of the Company as at 30 September 2023 was A$3.0 million. During
the period, the Company paid $74k to related parties. These payments were made to Directors of
Boab Metals Limited in relation to salaries and directors’ fees, on normal commercial terms.
To assist the Company in reaching its goals in 2024, Chairman Gary Comb and non-executive
directors Andrew Parker and Richard Monti have elected to reduce their annual base fee by 20%.
The reduced fees will commence 1 November 2023 and will remain in place for six months.
Based on Boab’s current cash position and estimated cashflow forecasts, the Company is
sufficiently funded well into 2024.
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 6
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@boabmetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by Henan Yuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this activities report relating to Exploration Results has been extracted
from the ASX Announcements titled “Amended Drilling Announcement” dated 4 September
2023”, “Assays Confirm Further Positive Outcome for Sorby” dated 23 January 2023, “High-Grade
Lead-Silver Confirmed at Beta Deposit” dated 1 February 2022, and “Sorby Hills DFS Metallurgical
Testwork Results” dated 19 November 2021 available to view at www.boabmetals.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in these announcements. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from
the form in which they were first presented.
Information included in this activities report relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 7
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Information included in this activities report relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and dated
19 January 2023, available to view at www.boabmetals.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Ore
Reserve Statement and that all material assumptions and technical parameters underpinning the
estimates, production targets and financial forecasts continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the Ore Reserves Statement.
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 8
Metal Equivalent Calculation Method
The contained metal equivalence formula is based on the Sorby Hills DFS including:
•
•
•
•
•
•
Lead Price US$2,253.19/t;
Lead recovery of 91.0% (weighted average of oxide and fresh Pb recoveries);
Lead Payability rate of 95%;
Silver Price US$27.4/oz;
Silver recovery of 81.8% (weighted average of oxide and fresh Ag recoveries); and
Silver Payability rate of 95%.
It is Boab’s opinion that all elements included in the metal equivalent calculation have a
reasonable potential to be recovered and sold.
The formula used to calculate lead equivalent grade is:
MetalEq (%) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri SpriVpriGpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return rate,
V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of potentially
recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab
notes that the metal equivalence method used above is a simplified approach. The metal prices
are based on the DFS values adopted and do not reflect the metal prices that a smelter would pay
for concentrate nor are any smelter penalties or charges included in the calculation. Owing to
limited metallurgical data, zinc grades are not included at this stage in the lead equivalent grade
calculation.
DFS Macroeconomic Assumptions
Assumption
Unit
FY2023
FY2024
FY2025
FY2026
FY2027+
Lead Price
US$/t
2,259
2,268
2,269
2,254
2,251
Silver Price
US$/oz
24.8
25.8
26.4
27.3
27.5
Exchange Rate
A$:US$
0.70
0.70
0.70
0.69
0.68
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 9
APPENDIX 1
INTERESTS IN TENEMENTS
Farm-In Agreements/
Projects/Tenements
Sorby Hills Project
M80/196
M80/197
M80/285
M80/286
Location
WA, Australia
M80/287
E80/5317
Held at Start of
Quarter
Held at End of
Quarter
75%
75%
75%
75%
75%
75%
75%
75%
75%
100%
75%
100%
100%
51%
100%
51%
51%
51%
51%
51%
51%
51%
51%
51%
51%
51%
100%
100%
100%
100%
100%
100%
100%
100%
Borroloola West Project
EL31354
EL26938
EL26939
EL28508
EL28658
NT, Australia
EL30305
MLN624
Manbarrum Project
EL24395
MA24518
NT, Australia
MA26581
Urrao Project
2791
Colombia
_____________________________________________________________________________________________________________________________ ____________________
Quarterly Report September 2023
Page 10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BOAB METALS LIMITED
Quarter ended (“current quarter”)
ABN
43 107 159 713
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 SEPTEMBER 2023
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
(1,176)
(1,176)
(b) development
-
-
(c) production
-
-
(d) staff costs
(183)
(183)
(e) administration and corporate costs
(222)
(222)
-
-
24
24
(a) exploration & evaluation (if expensed)
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other:Recharge of staff costs and other
administration costs to the Sorby JV
74
74
Net cash from / (used in) operating
activities
(1,483)
(1,483)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
1.9
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
(f)
Year to date
(3 months)
$A’000
(129)
(129)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(129)
(129)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
2.2
other non-current assets
Current quarter
$A’000
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,618
4,618
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,483)
(1,483)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(129)
(129)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
3,006
3,006
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
5.1
Bank balances
909
1,531
5.2
Call deposits
2,097
3,087
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,006
4,618
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(74)*
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
*Salaries and Directors fees paid on normal commercial terms
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
-
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(1,483)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,483)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,006
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,006
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
*Note, Estimated quarters of Funding available is calculated using the two previous
2.02*
-
-
quarters of expenditure. Boab funded a drilling program during this period which has
been competed with no further expenditure to be incurred.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which comply with
Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2023
Authorised for release by the Board of Directors of Boab Metals Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities
for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose
additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this
report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on
the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been
authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee –
eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By
the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying
with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the
board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been
properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows
of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is
operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5