Corporate Presentation
www.boabmetals.com
Sorby Hills
Silver – Lead Project
2
Forward-Looking Statements
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning, among
other things, future operating and exploration results or the Company’s future performance.
These forward-looking statements speak, and the presentation generally speaks, only at the
date hereof. The projections, estimates and beliefs contained in such forward-looking
statements necessarily involve known and unknown risks and uncertainties, and are
necessarily based on assumptions, which may cause the Company’s actual performance and
results in future periods to differ materially from any express or implied estimates or
projections.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly available
sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise a
prospectus, product disclosure statement or other offering document under Australian law.
The presentation does not constitute or form part of any invitation, offer for sale or
subscription or any solicitation for any offer to buy or subscribe for any shares in Boab Metals
Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the time
of preparation. No representation or warranty, express or implied is made as to the fairness,
accuracy or completeness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Boab Metals Limited, its related
bodies corporate and the officers, directors, employees, advisers and agents of those entities
do not accept any responsibility or liability for any loss arising from the use of the presentation
or its contents or otherwise arising in connection with it.
Compliance Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for
Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this presentation relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Mineral Resource Estimate and
that all material assumptions and technical parameters underpinning the estimates, continue
to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified
from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility Study and
FEED Study dated 19 January 2023 and 6 June 2024 respectively, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Ore Reserve Statement and that
all material assumptions and technical parameters underpinning the estimates, production
targets and financial forecasts continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Ore Reserves Statement.
Information included in this presentation relating to Exploration Results has been extracted
from the ASX Announcements titled “KEEP confirmed as a Target for Further Exploration”
dated 22 October 2024, “Significant Intercepts at Sorby Hills” dated 8 November 2023,
“Amended Drilling Announcement” dated 4 September 2023”, “Assays Confirm Further
Positive Outcome for Sorby” dated 23 January 2023, “High-Grade Lead-Silver Confirmed at
Beta Deposit” dated 1 February 2022 available to view at www.boabmetals.com.au. The
Company confirms that it is not aware of any new information or data that materially affects
the information included in these announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially
modified from the form in which they were first presented.
Disclaimer
2
Boab Metals Limited ASX: BML
3
• ASX-listed base and
precious metals developer
and explorer.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Board & Management
team with a proven track
record in development.
• Top 20 shareholders hold
54% of issued capital.
# Holder Name 22 Dec 2025
1 Citicorp Nominees Pty Limited 18.11%
2 JP Morgan Nominees Australia PL 6.85%
3 BNP Paribas Nominees Pty 3.89%
4 Morgan Stanley Australia 3.86%
5 Villiers Queensland PL 2.96%
Capital Structure
Top 5 Shareholders
Share Price History
3
Boab Metals Limited ASX: BML
Boab Metals
Corporate Snapshot
Metric 22 Dec 2025 Pro Forma1
Shares on Issue 505m 571m
Share Price 42.5cps 42.5cps
Market Capitalisation $215m $243m
Cash Position $90M $116m
Debt Outstanding Nil Nil
Enterprise Value $125m $127m
1. Based on the issue of 49 million Tranche 2 Placement Shares in early 2026 (subject to shareholder approval)
and full take up of the A$7M Share Purchase Plan as announced in ASX Release dated 15 December 2025
2. 17.8m Performance Rights on issue as at 19 December 2025
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0
2
4
6
8
10
12
1-Jan-25 1-Apr-25 1-Jul-25 1-Oct-25
Share
Price
(A$/sh)
Volume
(M
Shares)
Volume Share Price
4
Boab Metals
Investment Thesis
4
Boab Metals Limited ASX: BML
✓ Tier 1 Jurisdiction (WA), 150km from Port
✓ Low Risk Open Pit Mining
✓ Stage 1: Avg 2.2Moz Silver & 68kt Lead p.a.1
✓ Offtake agreement in place with Trafigura
covering 50–75% of high-quality silver-lead
concentrate production, at BML’s discretion.
✓ Agreement to acquire DeGrussa Processing
Plant executed
✓ A$236M Binding Debt commitment
✓ A$110M Equity raised or committed
✓ Option to acquire 100% of Project exercised
✓ Final Investment Decision made
✓ On-site Early Works commenced
The fully funded Sorby Hills Project provides investors exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
Figure: DeGrussa Processing Plant
1. ASX Release 6 June 2024
5
Boab Metals
Investment Thesis
5
SILVER SNAPSHOT: THE CROSSROADS OF INDUSTRY AND INVESTMENT
✓ Industrial demand: Unmatched conductivity make silver critical for solar
panels, EV electronic and central to the global energy transition.
✓ Supply squeeze: With primary mine output declining, most silver now
coming only as a by-product, and recycling stuck at ~20%, supply cannot
keep pace - entrenching a structural deficit.
✓ Value storage & safe-haven: As a monetary metal, silver is a store of value,
moving with gold during inflationary or geopolitical uncertainty.
✓ Speculative kicker: gold–silver ratio, investor flows to silver EFTs, and
leveraged futures trading all leading to amplified volatility — giving silver
greater upside torque in bull markets.
1,164Moz Demand in 2024
• 58% Industrial Demand
• 23% Jewellery & Silverware
• 16% Coins and Bars
1,015Moz Supply in 2024
• 22% Primary Silver Mines
• 58% as a by-product metal
• 19% Recycled Silver
Added to the U.S Government
Critical Minerals List
(November 25)
The Sorby Hills Project provides investors with exposure to attractive near term
Silver production in Australia
Boab Metals Limited ASX: BML
Source: Silver Institute 2025 Survey
6
Boab Metals
Investment Thesis
The fully funded Sorby Hills Project provides investors exposure to rising silver prices
leveraging off robust project economics underpinned by a historically stable lead price
6
LEAD SNAPSHOT: THE ORIGINAL BATTERY METAL
✓ Enduring Demand: A lead-acid battery is typically replaced two to three
times in a Light Vehicle's average lifetime of around 12 years supporting a
demand tail that will stretch decades.
✓ Indian Lead Demand: Indian consumption of refined lead is forecast to
grow 5% YOY through to 2030.
✓ Silver Lining: High demand for silver bearing lead concentrates is
delivering record low Concentrate Treatment Charges (negative US$65/t)
✓ Price Stability: A mature secondary market provides a buffer against price
shocks, limiting the Lead price to a relative tight and predictable range.
13,185kt Demand in 2024
• 41% Replacement batteries
• 13% New batteries
• 34% Industrial batteries
• 12% Non-battery uses
13,141kt Supply in 2024
• 32% Primary Lead
• 68% Recycled Lead
Added to the U.S Government
Critical Minerals List
(November 25)
Boab Metals Limited ASX: BML
Source: CRU 2023-2025
7
0
20
40
60
80
100
120
Jan-24 Apr-24 Jul-24 Oct-24 Jan-25 Apr-25 Jul-25 Oct-25
Silver
Price
(A$/oz)
Boab Metals
Investment Thesis
7
Boab Metals Limited ASX: BML
The fully funded Sorby Hills Project is on track for production in 2027
6 June 2024
Sorby Hills FEED Study1
NPV8 A$411M, IRR 37%
Assumed Silver Price A$40/oz
17 December 2025
Final Investment Decision
Silver Price +A$100/oz
14 October 2025
A$50M Equity Raise
27 November 2025
A$236M Debt Facility
Silver Leverage
Sensitivity analysis in the FEED
Study demonstrates that a A$1
increase in the silver price
increases Project NPV by
approximately A$10 million¹,².
Silver price is currently trading
~A$65/oz above the price
assumed in the FEED Study3
1. ASX Release 6 June 2024
2. See Appendix for FEED Study sensitivity analysis
3. A$ Silver Price of 104.7/oz 22 December 2025
15 December 2025
A$60M Equity Raise
A$ Silver Price
8
Assuming a spot silver price² of
US$69/oz, silver is expected to
contribute the majority of
forecast revenue
NPV8 A$411M
IRR 37%
Strong pre-tax
economics
A$264M pre-production Capex
(material cost reduction anticipated
resulting from DeGrussa acquisition)
Average Annualised Production
103kt Lead-Silver concentrate 68kt Lead
and 2.2Moz Silver
C1 cash cost US$0.36/lb
payable Pb
Incl. net Silver credit of
US$0.37/lb payable Pb
A$126M p.a. Average EBITDA
2.25Mtpa
Initial 8.5 Year
Mine Life
A$1.1B Operating Cash Flow
Sorby Hills Project
Feasibility Study Complete
Front End Engineering & Design Study1 Highlights
Boab Metals Limited ASX: BML
8
FEED Study Macroeconomic Assumptions
Ag: US$27.4/oz (A$40.4/oz), Pb: US$2,252/t (A$3,312/t), FX: 0.68, Lead TC: US$125/t
Shallow high grade and Low Strip Ore delivering strong low risk
early cashflows and rapid payback
546kt Payable Lead
A$1.8B Revenue
17.2Moz Payable Silver
A$0.7B Revenue
Sorby Hills Revenue Split
Based on FEED Study Assumptions inc Silver @
US27.4/oz
1. ASX Release 6 June 2024
2. As at 22 December 2025
9
Viewed differently, the Sorby
Hills Project may be considered
a low-cost silver producer
AISC = negative US$14/oz Ag
Sorby Hills Project
Cost structure delivering “free Silver”
Boab Metals Limited ASX: BML
Operating Costs covered by a non-volatile Lead Price
Operating margin fully leveraged to Silver price movements.
*Based on Spot Price of US$66/oz Ag
Sorby Hills FEED
Study AISC
ex-Silver Credits
US$0.81/lb Pb
US$/lb Pb
1.0
2.0
0
10-Year average
Lead Price1
US$0.94/lb Pb
+/-US$0.10/lb Pb
standard deviation
Sorby Hills Net
Silver Credits*
US$0.93/lb Pb
Sorby Hills Project Costs are more than
covered by the 10-year average1 Lead Price
Sorby Hills AISC ex
Lead “Credits”
US$51/oz Ag
US$/oz Ag
0
50
-50
Sorby Hills
Net Lead “Credits”
US$65/oz Ag
AISC = negative US$14/oz Ag
Sorby Hills – A low-cost Silver Producer?
56% Margin
9
AISC = All in Sustaining Cost or “Breakeven” cost
Project Costs Project Revenue
1 As at December 2025
Increasing Silver Price
10
Sorby Hills Project
Set to be a Major Silver Producer in 2027
10
Boab Metals Limited ASX: BML
Company Asset
Silver Production
(koz)*
S32 Cannington 10,292
Glencore Mt Isa, George Fisher 3,909
MMG Rosebery 2,414
Boab Metals Sorby Hills 2,191
Avg annualised production
MMG Dugald River 1,853
Glencore McArthur River 1,760
BHP South Australia 913
29 Metals Golden Grove 882
Evolution All Assets 827
*Source FY24 and FY25 Annual Reports
List is not exhaustive
Forecast Sorby Hills silver production versus established
silver producers within Australia
Figure: Ongoing Early Works at Sorby Hills
11
Sorby Hills Project
47.3Mt @ 123g/t Silver Equivalent
Deposit
Tonnes
(Mt)
Grade Contained Metal
Pb Zn Ag PbEq1 Pb Zn Ag
% % g/t % kt kt koz
A 0.6 5.3% 0.1% 23 6.1% 31 6 427
B 2.7 3.6% 0.3% 20 4.3% 97 8 1,720
Omega 17.2 3.3% 0.4% 34 4.5% 566 71 18,948
Norton 21.1 2.8% 0.4% 34 4.0% 590 96 24,090
Alpha 1.5 3.1% 0.9% 64 5.3% 45 13 2,975
Beta 4.2 3.6% 0.4% 43 5.1% 151 17 5,856
Measured 12.6 3.5% 0.4% 43 5.0% 444 45 17,521
Indicated 11.0 3.4% 0.4% 34 4.6% 377 46 12,114
Inferred 23.6 2.7% 0.5% 31 3.8% 645 117 23,406
Total 47.3 3.1% 0.4% 35 4.3% 1,465 207 53,042 Figure: Location of the Sorby Hills Resources
See ASX announcement 17 December 2021 1. See Appendix for Lead & Silver Equivalent calculation method
High Quality Resource
11
Boab Metals Limited ASX: BML
12
Sorby Hills Project (Stage 1)
Low Risk Open Pit Ore Reserve
See ASX announcement 19 January 2023
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A 4.1 3.7 0.5 3.7 16.4 4.3% 8.1
Pit B 14.8 12.6 2.3 3.2 17.4 3.8% 5.5
Omega South 21.1 18.3 2.8 2.9 29.5 3.9% 6.5
Omega Main 57.7 50.3 7.4 3.6 38.7 5.0% 6.8
Norton 21.4 19.5 1.9 4.0 78.5 6.8% 10.0
Beta 35.6 32.2 3.4 3.3 41.5 4.8% 9.5
Total Production 154.8 136.5 18.3 3.4 38.8 4.8% 7.5
Ore Reserve
Category
Ore
(Mt)
Grade Contained Metal
Pb (%) Ag (g/t) Pb (kt) Ag (Moz)
Proved 10.4 3.5% 42 358 14.1
Probable 4.9 3.5% 32 172 5.0
Total Ore Reserve 15.2 3.5% 39 531 19.1
FEED Study Production Target
Ore Reserve Statement
1. See Appendix for Lead Equivalent calculation method
Figure: DFS pit shells with respect to the Resource block model
Production Target
underpinned 83% by
Measured and Indicated
Resources.
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
57%
26%
17%
Measured Indicated Inferred
Boab Metals Limited ASX: BML
12
Production Target and Ore Reserve Growth Opportunities
✓ Large shallow deposit allowing for efficient and effective Resource definition
✓ Near-pit Resource extensions and defined strategic exploration targets
✓ Structural change in Silver pricing allowing for larger open pit designs
Acquisition of the DeGrussa Processing Plant from Sandfire Resources
significantly reduces and derisks project execution timeline
Sorby Hills Project
A head start on project delivery
13
14
Sorby Hills Project
DeGrussa Process Plant: An Ideal Fit
All major components for the Sorby
Hills Process Plant have been
secured via the DeGrussa Process
Plant acquisition
Extensive list of spares included in
the acquisition.
Tender process for the relocation,
rebuild and refurbishment of the
DeGrussa Processing Plant at
Sorby Hills confirmed:
▪ Minimum A$20M saving in
Processing Plant capital cost
▪ 6 months reduction in
construction timeline
Boab Metals Limited ASX: BML
14
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES during FEED showing key components of the
design that have been secured via the acquisition of the DeGrussa Processing Plant.
SAG Mill
Ball Mill
Tailings Thickener
Concentrate
Thickening
& Filtration
Flotation Circuit
Primary Crusher
Crushed Ore Storage Bin
15
Sorby Hills Project
High Quality Concentrate
Boab Metals Limited ASX: BML
15
Wyndham Port located just 150km from
Sorby Hills by existing sealed road.
Port Access Agreement executed with port
operators Cambridge Gulf
Concentrate to be transported from site to
Wyndham in sealed containers.
873kt of Concentrate shipped at an
average 103kt per annum.
• Average 664 g/t Silver
• Average 65.8% Lead
Spot Treatment Charges currently priced at
minus US$135/t1 - versus positive US$125/t
benchmark assumed in the Sorby Hill FEED
Study
Highly competitive offtake process
including global traders and smelters has
demonstrated the attractiveness of the
Sorby Hills concentrate product.
Figure: Loading at Wyndham Port
1. Zinc/Lead Market Weekly Updates - 2025/11/28 | SMM
16
Sorby Hills Project
Commencement of Early Works
Boab Metals Limited ASX: BML
16
The Early Works Program
encompasses a range of critical
preparatory activities essential to
enable future operations.
Initial works include:
• Construction of site access roads;
• Establishment of foundations for
the processing plant and
accommodation camp;
A$5M in cost reductions compared to
the FEED Study have been realised to
date.
Figure: Ongoing Early Works at Sorby Hills – preparation of the Camp pad
17
17
Workstream 2025 2026 2027
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Final Investment Decision ✓
Early Works ✓
Camp Refurbishment
Bulk Earthworks
Pre-Strip Mining
DeGrussa Plant Disassembly
Process Plant Reconstruction
Commissioning & Ramp-Up
Commercial Production
Sorby Hills Project
Construction Timeline
First Production from Sorby Hills is scheduled to occur in H2 2027
18
Board and
Project
Delivery Team
Engineer with over 30 years’
experience in the Australian
mining industry, with a strong
track record in successfully
commissioning and operating
base metal mines.
Gary Comb
Chairman
Board and Management
with a proven track record
in project development
Experienced mining executive
with a strong background in
management, capital raising
and operating JV’s with mid to
top tier miners in a variety of
commodities.
Simon Noon
Managing Director & CEO
Lawyer with significant
experience in the exploration
and mining industry. Wealth of
expertise in corporate advisory,
strategic consultancy and
raising capital.
Andrew Parker
Non-Exec. Director
Boab Metals Limited ASX: BML
18
Geologist with over 30 years’
experience in technical,
commercial, marketing and
finance within the exploration
and mining industry.
Richard Monti
Non-Exec. Director
Seasoned mining executive with over 28 years’ experience in the
development and operation of large-scale mining projects
across Australia and internationally. He has held senior executive
and project leadership roles with leading resources companies
including BHP, Peabody, Mineral Resources, Downer Mining,
and Thiess, as well as board positions with ASX-listed companies.
Russell Taylor
Project Director
19
Boab Metals
Near Term Share Price Catalysts
Boab Metals Limited ASX: BML
19
Q1 2026
• Completion of on-site Early Works
• Award of Processing Plant Contract Tender
• Final Regulatory Approvals received
• Commencement of Processing Plant dismantling and
relocation from DeGrussa to Sorby Hills
Q2 2026
• Award of Mining Contract
• Commencement of Processing Plant dismantling and
relocation from DeGrussa to Sorby Hills
• Updated Feasibility Study incorporating contracted cost
savings and revised macroeconomic assumptions
20
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Thank You
20
21
Appendix
Appendix
21
22
Sorby Hills Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the east
Kimberley Region
Figure:
Location of the
Manbarrum
Project, Eight
Mile Creek
Project and
Keep n-Pb
Target relative
to Sorby Hills.
Manbarrum Zn-Pb-Ag Project
▪ located 25km east of the Sorby Hills Project.
▪ 175km2 of prospective tenements (including two
granted mining leases) covering geology related to
that found at Sorby Hills.
▪ Mineral Resources declared at two prospects which
are zinc and silver dominated.
▪ Conceptual open pit mining studies completed by
CSA Global in 2018.
Keep Zinc Lead Target
▪ New Zinc-Lead mineralisation recently discovered
via greenfield exploration within the existing Sorby
Hills mining leases.
▪ Ore grade intercepts include:
▪ SHSD_185: 9.55 m @ 5.10% PbEq (2.59% Pb &
2.26% Zn) and 17.6 g/t Ag from 242.55 m
▪ SHSD_189: 2.00 m @ 7.73% PbEq (1.23% Pb &
5.86% Zn) and 36.7 g/t Ag from 303.0 m
Eight Mile Creek Project
▪ 30km of along-strike geology, highly prospective
for deposits similar to Sorby Hills.
▪ The exploration success based on seismic data at
the Keep Zinc-Lead Target has opened the door for
more bold exploration at Eight Mile Creek.
Eight Mile Creek
(Pb-Ag-Zn)
Keep Zn-Pb Target
Boab Metals Limited ASX: BML
22
ASX Release 22 October 2024
23
Sorby Hills Project
Debt Finance Secured
Boab Metals Limited ASX: BML
23
✓ Binding Commitment for a A$236M Debt Facility executed with Merricks
Capital and Davidson Kempner
Facility inclusive of Cost Overrun Tranche (drawn if required) and
funding of Interest and Fees incurred during construction period.
✓ Clean Debt Structure - No warrants, no royalties, no production linked
payments or equity-like features
Limits shareholder dilution and allows investors to retain exposure
to further silver price upside and associated cashflow.
✓ 5 Year Loan Tenor from First Drawdown
First drawdown expected to occur in the second half of 2026.
✓ Light touch amortisation profile
Six months interest only from Project Completion followed by
quarterly repayments, each equating to 5% of the debt facility, with
the remaining amount paid as a bullet at maturity.
✓ Flexible hedging requirements
Allows the Company to develop a risk management strategy
utilising lead or silver hedging , or a combination of both, to optimise
risk management whilst retaining price upside.
✓ Project Finance Debt Facility replaces Trafigura Prepayment thus
delivering material upside in the form of improved offtake terms
A$236M Project Finance
Debt Facility1
A transformative
milestone for the
Company and a strong
endorsement of the
Sorby Hills Project
The debt facility commitment is subject to conditions
precedent which are expected to be completed in Q1 2026
1. ASX Release 27 November 2025
24
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster
• Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
• The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
• Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn Grow,
East Kimberley
Boab Metals
Establishing Deep Roots within the Local Community
24
Boab Metals Limited ASX: BML
25
PHYSICALS SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
ROM Mined Mt 18.3 - 0.4 2.1 2.3 2.4 2.5 2.3 2.0 1.1 3.0 0.3 -
Waste Mined Mt 134.6 - 3.8 11.7 14.3 25.7 25.4 21.0 17.3 13.0 4.2 0.2 -
% Measured % 56.7% - 67.3% 91.7% 64.7% 72.0% 89.7% 71.8% 47.7% 16.6% - - -
% Indicated % 26.5% - 32.7% 8.3% 35.3% 27.2% 8.9% 26.7% 49.7% 30.6% 31.1% - -
% Inferred % 16.8% - - - - 0.9% 1.4% 1.5% 2.7% 52.8% 68.9% 100.0% -
Lead Grade % 3.4% - 3.8% 4.1% 3.2% 3.8% 3.3% 3.1% 3.1% 3.6% 3.4% 2.9% -
Silver Grade g/t 39 - 24 39 28 60 50 22 27 42 41 50 -
Processed Tonnes Mt 18.3 - - 1.39 2.25 2.26 2.25 2.25 2.25 2.26 2.25 1.11 -
Lead Grade % 3.4% - - 5.5% 3.4% 4.0% 3.5% 3.1% 3.0% 2.5% 3.5% 3.0% -
Silver Grade g/t 39 - - 47 30 59 54 24 27 30 41 41 -
Lead Recovery % 91.6% - - 90.9% 94.1% 90.0% 88.0% 92.7% 94.7% 93.8% 90.3% 90.3% -
Silver Recovery % 81.7% - - 87.2% 86.2% 82.2% 81.4% 86.9% 86.9% 85.7% 70.4% 70.3% -
Concentrate Produced kt 873 - - 109 110 126 112 99 98 80 97 42 -
Lead Grade % 65.8% - - 64.2% 65.6% 63.5% 62.4% 65.9% 66.0% 65.7% 72.2% 72.3% -
Silver Grade g/t 664 - - 529 532 860 878 479 535 730 677 770 -
Payable Lead kt 546 - - 61 69 79 65 63 63 50 68 30 -
Payable Silver Moz 17.2 - - 1.5 1.7 3.2 3.0 1.4 1.5 1.8 2.0 1.0 -
Sorby Hills FEED Study
Life of Mine Physicals
Boab Metals Limited ASX: BML
25
26
FINANCIAL SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Lead Revenue A$M 1,803 - - 198 225 260 215 207 208 165 226 98 1,803
Silver Revenue A$M 693 - - 59 69 131 121 57 62 71 82 40 693
Total Revenue A$M 2,496 - - 257 295 392 337 264 269 236 308 138 -
TR/RCs A$M (191) - - (21) (23) (30) (26) (21) (21) (18) (22) (10) -
Royalties A$M (95) - - (10) (11) (14) (12) (10) (10) (9) (12) (5) -
Net Revenue A$M 2,209 - - 227 260 347 299 233 238 210 274 123 -
Logistics A$M (117) - - (14) (15) (17) (15) (13) (13) (11) (13) (6) -
Mining A$M (547) - - (51) (62) (94) (93) (81) (71) (54) (36) (4) -
Processing A$M (388) - - (38) (47) (47) (47) (47) (47) (47) (47) (24) -
G & A A$M (88) - - (10) (10) (10) (10) (10) (10) (10) (10) (5) -
Operating Cash Flow A$M 1,069 - - 114 126 180 134 81 96 88 167 84 -
Pre-production Capex A$M (264) (131) (133) - - - - - - - - - -
Sustaining Capex A$M (26) - - (12) (1) (3) (1) (0) - - - (5) (4)
Project Cash Flows A$M 778 (131) (133) 101 125 177 133 81 96 88 167 78 (4)
NPV8 A$M 411
IRR % 37
Average EBITDA A$M 126
Sorby Hills FEED Study
Life of Mine Cashflows
Boab Metals Limited ASX: BML
26
FEED Study Macroeconomic Assumptions
Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t
27
Sorby Hills FEED Study
Capital Cost Breakdown
Item
Pre-Production
(A$M)
Sustaining
(A$M)
Total
(A$M)
EPC Contract 134.9 - 134.9
Site Est / Bulk Earthworks 31.9 4.9 36.9
Water Management 8.1 11.7 19.8
Accommodation Village 11.5 - 11.5
Other Infrastructure 8.5 0.6 9.1
Owners Costs 32.0 - 32.0
Contingency 22.7 - 22.7
Pre-Production Opex 15.0 - 15.0
Closure Costs - 9.3 9.3
Total Capital Costs 264.5 26.5 290.9
Total upfront capital cost of A$264M
including A$22.7M contingency.
~66% of capital costs underpinned by
tendered pricing, including an updated
Process Plant EPC pricing following the
completion of Front-End Engineering &
Design by GRES.
A$32M Owner Costs including
operational readiness items such as
critical spares and owner’s team.
Opportunities being explored to further
reduce upfront capital costs and project
implementation risk.
Boab Metals Limited ASX: BML
27
28
Sorby Hills FEED Study
Operating Cost Breakdown
Unit Operating Costs based on 18.3Mt of Ore, 546kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Item
Total
(A$M)
Unit Costs
A$/t ore US$/lb payable Pb
Logistics 117 6.4 0.07
Mining 547 30.0 0.31
Processing 388 21.3 0.22
G & A 88 4.8 0.05
Lead Treatment 160 8.8 0.09
C1 Costs (ex-Credits) 1,300 71.2 0.74
Net Silver Credits (661) (36.2) (0.37)
C1 Costs 639 35.0 0.36
Royalties 95 5.2 0.05
Sustaining Capital 26 1.4 0.01
AISC 760 41.6 0.43
Competitive C1 cash cost of US$0.36/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Boab Metals Limited ASX: BML
28
29
Sorby Hills FEED Study
Project Sensitivity Analysis
Boab Metals Limited ASX: BML
29
-
100
200
300
400
500
600
700
800
900
1,000
-30% -25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25% 30%
Project
NPV8
(A$M)
Lead Silver FX Lead TC Opex Capex
Assumption Unit FEED Spot1 Change
Lead Price U$/t 2,252 1,985 (12%)
Silver Price US$/oz 27.4 69.3 153%
FX A$:US$ 0.68 0.66 (3%)
Lead TC US$/t 125 (135)2
(208%)
1 As at 22 December 2025
2. Zinc/Lead Market Weekly Updates - 2025/11/28 | SMM
A 30% increase in Silver price increases NPV from A$411m to A$540m = delta of A$129m
A 30% increase in A$ Silver Price of A$40.3/oz = A$52.4/oz = delta of A$12.1/oz
Change in NPV vs Change in A$ Silver Price = A$129m / A$12.1/oz = A$10.7m/oz
30
1st Quartile 2nd Quartile 3rd Quartile 4th Quartile
Sorby Hills Project
2027 Lead Cost Curve (ex-works basis)
US$/t
Lead
Low risk open cut
mining and high
process plant
throughput drives
low operating cost
relative to global
peers.
CRU, Independent Market Consultant Report for Boab Metals’ Sorby Hills Pb-Ag Project (Sept 2023).
Sorby Hills Project
Confirmed Low-Cost producer
Independently confirmed as a 1st Quartile Project on
the Global Lead cost curve
Boab Metals Limited ASX: BML
30
31
Feed Study Macroeconomic Assumptions
The contained metal equivalence formula is based
on the Sorby Hills FEED Study including:
• Lead Price US$2,253/t; and
• Silver Price US$27.4/oz.
Lead Equivalent Calculations
• Silver recovery of 82% (weighted
average of oxide and fresh Ag
recoveries); and
• Silver Payability rate of 95%.
Silver Equivalent Calculations
• Lead recovery of 91% (weighted
average of oxide and fresh Pb
recoveries); and
• Lead Payability rate of 95%.
Pb
Ag
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
where R is the respective metallurgical metal recovery rate, S is the respective smelter return
rate, V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary metal (pri).
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the DFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
Assumption Unit 2025 2026 2027 2028 2029+
Lead Price US$/t 2,259 2,268 2,269 2,254 2,251
Silver Price