Investor Presentation
Released
Released
Announcement PDF
Advancing the Sorby Hills
Lead-Silver Project Toward a Final Investment Decision
Corporate Presentation - 19 December 2023
Disclaimer
Forward-Looking Statements
Compliance Statement
Certain statements in the presentation are or may be “forward-looking statements” and
represent the Company’s intentions, projections, expectations or beliefs concerning,
among other things, future operating and exploration results or the Company’s future
performance. These forward-looking statements speak, and the presentation generally
speaks, only at the date hereof. The projections, estimates and beliefs contained in such
forward-looking statements necessarily involve known and unknown risks and
uncertainties, and are necessarily based on assumptions, which may cause the
Company’s actual performance and results in future periods to differ materially from
any express or implied estimates or projections.
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and
guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources
and Ore Reserves.
General Disclaimer
The information in this presentation remains subject to change without notice. This
presentation may contain information (including information derived from publicly
available sources) that has not been independently verified by the Company.
Not an Offer
This presentation is for information purposes only. The presentation does not comprise
a prospectus, product disclosure statement or other offering document under
Australian law. The presentation does not constitute or form part of any invitation, offer
for sale or subscription or any solicitation for any offer to buy or subscribe for any shares
in Boab Metals Limited.
No Liability
Boab Metals Limited has prepared this document based on information available at the
time of preparation. No representation or warranty, express or implied is made as to the
fairness, accuracy or completeness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Boab Metals
Limited, its related bodies corporate and the officers, directors, employees, advisers and
agents of those entities do not accept any responsibility or liability for any loss arising
from the use of the presentation or its contents or otherwise arising in connection with
it.
Information included in this presentation relating to Exploration Results has been
extracted from the ASX Announcements titled “Amended Drilling Announcement”
dated 4 September 2023”, “Assays Confirm Further Positive Outcome for Sorby” dated
23 January 2023, “High-Grade Lead-Silver Confirmed at Beta Deposit” dated 1 February
2022, and “Sorby Hills DFS Metallurgical Testwork Results” dated 19 November 2021
available to view at www.boabmetals.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in
these announcements. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
form in which they were first presented.
Information included in this presentation relating to Mineral Resources has been
extracted from the Mineral Resource Estimate dated 17 December 2021, available to
view at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Mineral
Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Mineral Resource Estimate.
Information included in this presentation relating to Ore Reserves, Production Targets
and Financial Forecasts has been extracted from the Sorby Hills Definitive Feasibility
Study and dated 19 January 2023, available to view at www.boabmetals.com.au. The
Company confirms that it is not aware of any new information or data that materially
affects the information included in the Ore Reserve Statement and that all material
assumptions and technical parameters underpinning the estimates, production targets
and financial forecasts continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the Ore Reserves Statement.
Boab Metals
Corporate Summary
Share Price
A$0.18 / share
Debt
Nil
Shares on Issue
174 million shares
Cash
A$3.0 million (30 September 2023)
Market Cap
A$31 million
Performance Rights
8,300,000
Top 4 Shareholders
7.50
0.750
6.25
0.625
5.00
0.500
3.75
0.375
2.50
0.250
1.25
0.125
0.00
Jul-19 Jan-20 Jul-20 Jan-21 Jul-21 Jan-22 Jul-22 Jan-23 Jul-23
0.000
Volume
#
Holder Name
1
Villiers Queensland PL
8.80%
2
Zero Nominees Pty Limited
4.33%
3
Citicorp Nominees Pty Limited
3.35%
4
Brent Connolly
2.52%
Boab Metals Limited ASX: BML
Volume (millions)
Capital Structure (18 December 2023)
9 October 2023
BML Share Price (A$/share)
Share Price History
Price
• ASX-listed base and
precious metals
developer and explorer.
• Board & Management
team with a proven track
record in development.
• Advancing toward Final
Investment Decision on
Sorby Hills.
• Top 20 shareholders hold
36% of issued capital.
Sorby Hills Project
High Quality Resource Estimate
Deposit
Tonnes
(Mt)
Grade
Contained Metal
Pb
%
Zn
%
Ag
g/t
PbEq1
%
Pb
kt
Zn
kt
Ag
koz
A
0.6
5.3%
0.1%
23
6.1%
31
6
427
B
2.7
3.6%
0.3%
20
4.3%
97
8
1,720
Omega
17.2
3.3%
0.4%
34
4.5%
566
71
18,948
Norton
21.1
2.8%
0.4%
34
4.0%
590
96
24,090
Alpha
1.5
3.1%
0.9%
64
5.3%
45
13
2,975
Beta
4.2
3.6%
0.4%
43
5.1%
151
17
5,856
Measured
12.6
3.5%
0.4%
43
5.0%
444
45
17,521
Indicated
11.0
3.4%
0.4%
34
4.6%
377
46
12,114
Inferred
23.6
2.7%
0.5%
31
3.8%
645
117
23,406
Total
47.3
3.1%
0.4%
35
4.3%
1,465
207
53,042
See ASX announcement 17 December 2021
Figure: Location of the Sorby Hills Resources
1. See Appendix for Lead & Silver Equivalent calculation method
A different perspective – 47.3mt @ 123g/t Silver Equivalent
Boab Metals Limited ASX: BML
Sorby Hills Project
A near term Lead-Silver producer
Project Highlights
Figure: Location of the Sorby Hills Project
Boab Metals Limited ASX: BML
•
Located 50km northeast of Kununurra in the East Kimberley
Region of Western Australia
•
High quality Mineral Resource with significant near mine upside
•
Potential New Discovery 2km away from existing Reserves
•
150km by existing sealed roads to the Wyndham Port
•
Definitive Feasibility Study, Front End Engineering & Design
completed
•
Conventional open pit mining and flotation process plant
producing a high-grade Lead-Silver concentrate
•
Initial production target underpinned by 83% Reserves
•
Heads of Agreement to secure clean energy from the Ord River
Hydroelectric Plant
•
Offtake negotiations nearing completion and Engagement with
Financiers ongoing
•
Project advancing toward a Final Investment Decision
Sorby Hills Project
Low Risk Open Pit Ore Reserve
DFS Production Target
Pit
Total
(Mt)
Waste
(Mt)
ROM
(Mt)
Pb
(%)
Ag
(g/t)
PbEq
(%)
Strip
Ratio
Pit A
4.1
3.7
0.5
3.7
16.4
4.3%
8.1
Pit B
14.8
12.6
2.3
3.2
17.4
3.8%
5.5
Omega South
21.1
18.3
2.8
2.9
29.5
3.9%
6.5
Omega Main
57.7
50.3
7.4
3.6
38.7
5.0%
6.8
Norton
21.4
19.5
1.9
4.0
78.5
6.8%
10.0
Beta
35.6
32.2
3.4
3.3
41.5
4.8%
9.5
Total Production
154.8
136.5
18.3
3.4
38.8
4.8%
7.5
Ore Reserve
Category
Ore
(Mt)
Proved
Grade
Contained Metal
Pb (%)
Ag (g/t)
Pb (kt)
Ag (Moz)
10.4
3.5%
42
358
14.1
Probable
4.9
3.5%
32
172
5.0
Total Ore Reserve
15.2
3.5%
39
531
19.1
See ASX announcement 19 January 2023
Production Target
underpinned 83% by
Measured and Indicated
Resources.
17%
1. See Appendix for Lead Equivalent calculation method
Ore Reserve Statement
Boab Metals Limited ASX: BML
Figure: DFS pit shells with respect to the Resource block model
26%
57%
Including 95% Measured
and Indicated Resources
over the first 7 years of
production.
Measured
Indicated
Inferred
Sorby Hills Project
Definitive Feasibility Study
DFS Highlights
A$245m preproduction Capex
underpinned 75%
by tendered
pricing
C1 cash cost
US$0.39/lb payable Pb
Incl. net Silver credit of
US$0.38/lb payable Pb
Average Annual Production
103kt Lead-Silver concentrate
67kt Lead and 2.2Moz Silver
NPV8 A$370m
IRR 35%
Strong pre-tax
economics
1. See Appendix for Revenue Assumptions
Boab Metals Limited ASX: BML
Lead
543 thousand payable tonnes
A$1,790 Million Revenue
2.25Mtpa
8.5 Year
Mine Life
A$1.0bn Operating Cash Flow
A$119m p.a. Average EBITDA
Silver
17.2 million payable ounces
A$692 Million Revenue
Sorby Hills Project
Development Ready
Primary Crusher
▪
GRES has recently completed FEED
Workstreams
▪
FEED output has resulted in:
Flotation
Circuit
▪
detailed plant design;
▪
optimised site layout;
▪
the issue of tender packages
for long-lead items; and
▪
updated EPC pricing
consistent with EPC pricing
adopted in the DFS.
Filter Press
SAG Mill
Ball Mill
Tailings
Thickener
Concentrate Container Loading
Figure: 3D Model of the Sorby Hills Process Plant produce by GRES during FEED.
Boab Metals Limited ASX: BML
▪
Options to reduce costs have been
identified by GRES.
▪
EPC Contract Award upon FID.
Sorby Hills Project
Confirmed Low-Cost producer
Independently confirmed as a 1st Quartile Project
on the Global Lead cost curve
2027 Lead Cost Curve (ex-works basis)
1st Quartile
2nd Quartile
3rd Quartile
4th Quartile
▪ Forecast Project ex works
Operating Costs covered by
a historically non-volatile
Lead Price.
US$/t Lead
▪ The Sorby Hills Project
Operating margin is
therefore highly leveraged
to Silver price.
Sorby Hills
Project
CRU, Independent Market Consultant Report for Boab Metals’ Sorby Hills Pb-Ag Project (Sept 2023).
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
9
Sorby Hills Project
Supplying the proven Battery Metal
Lead demand growth underpinned by mature and
emerging vehicle technologies
1. www.batteryinnovation.org/resources/lead-battery-market-data/
Global Refined
Lead Demand (Mt)
Global Sales of light duty
vehicles (million units)
Forecast Light Vehicles Sales versus Lead Demand1
ICE Petrol
ICE Diesel
Hybrid EVs
Battery EVs
Other EVs
Lead Demand
Source: Bloomberg 29 November 2023
Boab Metals Limited ASX: BML
“…. low voltage 12V leadbased batteries will
continue to be used for
starter and auxiliary
functions in most internal
combustion engine
vehicles (ICE) and new
electric vehicles1 …..”
1. CRU, Independent Market
Consultant Report for Boab Metals’
Sorby Hills Pb-Ag Project (Sept 2023)
Sorby Hills Project
Significant Intercepts post Mineral
Resource Estimate 2021
Phase V – 15 holes not yet included in Mineral Resource Estimate
▪ SHRC_123 (Beta): 27m @ 3.47% Pb & 37g/t Ag from 34m:
▪ Incl. 3m @ 7.04% Pb & 95g/t Ag from 35m; 5m @ 5.60% Pb & 44g/t Ag
from 45m; and 6m @ 4.50% Pb & 49g/t Ag from 55m.
▪ SHRC_124 (Beta): 17m @ 3.51% Pb & 46g/t Ag from 49m:
▪ Incl. 8m @ 6.93% Pb & 90g/t Ag from 57m.
▪ SHRC_129 (Wildcat): 6m @ 5.37% Pb & 21g/t Ag from 12m down hole.
Phase VI – 28 holes not yet included in mineral Resource Estimate
▪ SHRC_157 (Beta): 7m @ 19.17% PbEq, (16.23% Pb & 82g/t Ag) from 72m
▪ Incl. 3m @ 41.38% PbEq, (35.26% Pb & 174g/t Ag) from 72m.
▪ SHRC_136 (Beta): 20m @ 7.39% PbEq, (5.58% Pb & 52g/t Ag) from 65m
▪ Incl. 8m @ 13.86% PbEq, (10.49% Pb & 96g/t Ag) from 77m.
▪ SHRC_151 (Beta): 5m @ 5.13% PbEq, (3.70% Pb & 41g/t Ag) from 45m.
▪ SHRC_149 (Norton): 2m @ 16.64% PbEq, (10.92% Pb & 163g/t Ag) from 103m
▪ SHRC_147 (Norton): 11m @ 5.74% PbEq, (3.84% Pb & 54g/t Ag) from 86m.
▪ SHRC_143 (Norton): 13m @ 4.06% PbEq, (2.82% Pb & 35g/t Ag) from 95m.
Phase VII – 21 holes not yet included in Mineral Resource Estimate
▪ SHSD_171 (Norton): 11m @ 17.63% PbEq (10.98% Pb & 189 g/t Ag) from 82m
Figure: Location of the Sorby Hills Resources
▪ SHSD_174 (Norton): 11.6m @ 20.23% PbEq (8.78%Pb & 325 g/t Ag) from 74m
▪ SHSD_164 (Norton): : 6m @ 9.92% PbEq (3.92% Pb & 170g/t Ag) from 101m
Boab Metals Limited ASX: BML
Figure: Location of drill holes not yet included in the Sorby Hills Mineral Resource
Sorby Hills Project
Keep Seismic Target
Keep Seismic Target
Potential Discovery located 2km from the
existing Sorby Hills Deposits
▪
1st drill hole indicates potential for a
new discovery (2 km south of
existing Sorby Hills Reserves).
▪
New Zone located within favourable
structural and stratigraphic
setting with potential for extensive
development of mineralisation.
▪
“more life” in a proven district
SPH
Intersected
▪
Lower (Main) Mineralised Zone:
replacement-type, stratiform MVT zinc
& lead sulphide layers and
disseminated mineralisation.
▪
9.55m @ 5.1% PbEq from 243m
Upcoming Field Season
▪
GAL
Figure: Section of the Keep Seismic Target showing the interpreted structural and stratigraphic
setting for the original drill hole.
Boab Metals Limited ASX: BML
Step-out drill program to test the
potential for an economic mineral
deposit.
Sorby Hills Project
Strategic Growth Opportunities
Vision to establish a long-life presence in the east
Kimberley Region
Figure:
Location of the
Manbarrum
and Eight Mile
Creek Project
relative to
Sorby Hills.
Manbarrum Zn-Pb-Ag Project
▪
located 25km east of the Sorby Hills Project.
▪
Mineral Resources declared at two prospects
which are zinc and silver dominated.
▪
175km2 of prospective tenements (including two
granted mining leases) covering geology
related to that found at Sorby Hills.
▪
Extensive but only shallow-depth exploration in
the past; need for new targeting approach and
deeper exploration (100 to 200m below surface)
▪
Two targets priority delineated in favourable
structural and stratigraphic positions
▪
Conceptual open pit mining studies
completed by CSA Global in 2018.
Keep Seismic Target
Eight Mile Creek
(Pb-Ag-Zn)
Boab Metals Limited ASX: BML
Eight Mile Creek Project
▪
30km of along-strike geology, highly
prospective for deposits similar to Sorby Hills.
▪
Scout drilling has confirmed favourable
stratigraphic setting and fluid traps.
▪
The success at the Keep Seismic Target has
opened the door for more bold exploration.
Sorby Hills Project
Delivering Silver Exposure to Investors
The Sorby Hills Project and Boab Metals offer
rare ASX exposure to Silver Price movements
▪ Boab’s share price has
historically demonstrated a
strong correlation with the
A$ price of Silver.
7.50
0.750
6.25
0.625
5.00
0.500
3.75
0.375
2.50
0.250
1.25
0.125
0.00
Jul-19
BML Share Price (A$/share)
Volume (millions)
BML Share Price vs AUD Silver Price
0.000
Jan-20
Jul-20
Jan-21
Volume
Jul-21
Jan-22
Silver Price (AUD)
Jul-22
Jan-23
Jul-23
Price
Source: Bloomberg 29 November 2023
Boab Metals Limited ASX: BML
▪ Since the beginning of
2023, there has been a
divergence in this historic
correlation.
▪ Given the Sorby Hills’
leverage to the Silver
price, a trend reversion is
anticipated as the Project
progresses to FID and
first production.
Boal Metals
Investment Opportunity
The past 12 Months
Near Term News Flow and Ongoing Activities
▪
22% - DFS vs PFS NPV
36% - Boab Share Price1
Complete ongoing Optimisation Workstreams and Progress
Project Approvals.
•
Updated Tailings Strategy to reduce execution risk and
improve project cashflows.
•
•
Metallurgical Testwork at Norton to upgrade recoveries.
Optimisation of power solution with more green energy and
potentially remove the planned backup power station.
31% - Median ASX Materials2
▪
Incorporate the results of Optimisation Workstreams into a FEED
Study – target for release Q2 2024.
4% - Lead Price1
▪
Aggressive drill program to test potential for an economic deposit
at the Keep Seismic Target.
4% - Silver Price1
▪
Progress approvals EPA 45c amendment, Works Approvals. EPBC
(controlled action) assessment on preliminary documentation only
▪
▪
▪
▪
Continue engagement with potential financers.
1. Bloomberg: 19 December 2022 – 18 December 2023
2. www.marketindex.com.au 18 December 2023
Boab Metals Limited ASX: BML
Secure credit approved offer(s) from financiers.
Execute Offtake Agreement(s).
Reach a Final Investment Decision.
Thank You
Simon Noon – Managing Director & CEO
info@BoabMetals.com
www.BoabMetals.com
www.linkedin.com/company/boab-metals
Board and
Technical Team
Gary Comb
Board and Management
with a proven track
record in exploration and
development
Technical Team
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
Simon Noon
Richard Monti
Andrew Parker
Chairman
Managing Director
and CEO
Non-Exec. Director
Non-Exec. Director
Engineer with over 30
years’ experience in the
Australian mining
industry, with a strong
track record in
successfully
commissioning and
operating base metal
mines.
Experienced mining
executive with a strong
background in
management, capital
raising and operating
JV’s with mid to top tier
miners in a variety of
commodities.
Geologist with over 30
years’ experience in
technical, commercial,
marketing and finance
within the exploration
and mining industry.
Lawyer with significant
experience in the
exploration and mining
industry. Wealth of
expertise in corporate
advisory, strategic
consultancy and raising
capital.
Richard Flanagan – Principal Project Engineer
Simon Dorling - Exploration Manager
Mining engineer with extensive experience across a wide range of
commodities, including several world class Silver-Lead-Zinc deposits
and covers management roles across feasibility studies,
development, commissioning and operations.
Geologist with more than 26 years’ experience in exploration,
development and the mining of base metals, precious metals,
energy minerals and industrial minerals.
17
Sorby Hills Definitive Feasibility Study
Capital Cost Breakdown
Tendered Pricing for 75% of
Capital Costs to reduce the
risk of pre-FID cost escalation.
Process Plant EPC comprises:
• $82.9M - Supply Cost
• $41.6M - Installation Cost
• $5.8M - Freight Cost
A$20M Contingency.
A$21M Owner Costs including
operational readiness items
such as critical spares and
build-up of owner’s team.
Pre-production
(A$M)
Sustaining
(A$M)
Total
(A$M)
Early Works / Bulk Earthworks / Road Construction
9.9
15.7
25.6
Process Plant and Non-Plant Infrastructure (NPI)
130.5
-
130.5
Tailings Storage and Evaporation Pond
18.0
1.9
19.9
Mine Water Settling Pond & Water Storage Facility
12.4
21.3
33.7
Accommodation refurbishment
4.1
-
4.1
Communications
0.9
-
0.9
Fuel Tanks
-
1.3
1.3
Concentrate Transport & Containers
7.9
-
7.9
Owners Cost
25.3
5.8
31.0
Project Development Contingency
20.9
-
20.9
Pre-Production Operating Costs
14.6
-
14.6
-
9.3
9.3
244.6
55.2
299.8
Item
Mine Closure
Total
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
18
Appendix
Appendix
Boab Metals Limited ASX:BML
19
Sorby Hills Definitive Feasibility Study
Life of Mine Physicals
PHYSICALS SUMMARY
Unit
Total
FY23
FY24
FY25
FY26
FY27
FY28
FY29
FY30
FY31
FY32
FY33
FY34
ROM Mined
Mt
18.3
-
-
2.1
2.1
2.3
2.5
1.9
2.2
1.8
3.3
-
-
Waste Mined
Mt
134.6
-
-
11.7
11.6
12.2
24.3
26.1
25.6
19.6
3.5
-
-
% Measured
%
56.7%
-
-
89.7%
66.7%
63.3%
89.4%
59.5%
45.9%
66.0%
-
-
-
% Indicated
%
26.5%
-
-
10.3%
33.3%
36.7%
9.7%
37.3%
50.7%
2.3%
28.6%
-
-
% Inferred
%
16.8%
-
-
-
-
-
1.0%
3.2%
3.4%
31.7%
71.4%
-
-
Lead Grade
%
3.4%
-
-
4.1%
3.2%
3.5%
2.8%
3.0%
3.6%
4.0%
3.4%
-
-
Silver Grade
g/t
39
-
-
38
28
39
23
38
42
64
42
-
-
Processed Tonnes
Mt
18.3
-
-
1.15
2.12
2.25
2.25
2.26
2.25
2.25
2.25
1.49
-
Lead Grade
%
3.4%
-
-
5.6%
3.6%
3.6%
2.9%
2.9%
3.6%
3.6%
3.8%
2.0%
-
Silver Grade
g/t
39
-
-
46
34
39
25
35
41
56
44
31
-
Lead Recovery
%
91.0%
-
-
90.3%
94.2%
94.1%
92.8%
93.7%
90.6%
83.1%
90.3%
90.3%
-
Silver Recovery
%
81.8%
-
-
87.3%
86.4%
87.1%
87.4%
87.2%
83.0%
78.5%
70.4%
72.9%
-
Concentrate Produced
kt
872
-
-
91
109
115
93
92
114
111
108
38
-
Lead Grade
%
65.5%
-
-
63.9%
65.6%
65.7%
66.1%
65.5%
63.8%
59.8%
72.3%
70.4%
-
Silver Grade
g/t
665
-
-
501
574
666
520
737
665
890
654
873
-
Payable Lead
kt
543
-
-
55
69
69
57
62
67
62
75
28
-
Payable Silver
Moz
17.2
-
-
1.3
1.9
2.2
1.4
2.1
2.1
3.0
2.1
1.1
-
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
20
Sorby Hills Definitive Feasibility Study
Operating Cost Breakdown
Competitive C1 cash cost of US$0.39/lb
payable Pb (including Silver Credits).
~80% of Mining Costs underpinned by
tendered pricing with opportunities for
further schedule and cost optimisation
through the contracting process.
Opportunity to reduce Process costs
through the optimisation of back-up
power requirements.
Opportunity to reduce Logistics costs
via application of concessional loading
for road haulage.
Unit Costs
Item
Total
(A$M)
A$/t ore
US$/lb payable Pb
Mining
591
32.4
0.34
Processing
391
21.4
0.22
G&A
88
4.8
0.05
Logistics
121
6.6
0.07
Lead Treatment
159
8.7
0.09
C1 Costs (ex Credits)
1,351
73.9
0.77
Net Silver Credits
(660)
(36.1)
(0.38)
C1 Costs
690
37.8
0.39
Royalties
94
5.2
0.05
Sustaining Capital
55
3.0
0.03
AISC
840
46.0
0.48
Unit Operating Costs based on 18.3Mt of Ore, 543kt of Payable
Lead, average exchange rate of AUD:USD 0.68 and average
Silver price of US$27.4/oz.
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
21
Sorby Hills Project
Resource Classification by Deposit
Deposit
Classification
Tonnes
(Mt)
Inferred
Sub Total
Measured
Indicated
Sub Total
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Sub Total
Indicated
Inferred
Sub Total
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Total
0.6
0.6
1.4
1.3
2.7
8.5
5.8
2.9
17.2
2.8
2.1
16.2
21.1
0.7
0.8
1.5
1.0
3.2
4.2
12.6
11.0
23.6
47.3
A
B
Omega
Norton
Alpha
Beta
Total Resource
Boab Metals Limited ASX: BML
Grade
Pb
%
5.3%
5.3%
3.8%
3.4%
3.6%
3.3%
3.5%
2.7%
3.3%
4.1%
3.2%
2.5%
2.8%
2.6%
3.6%
3.1%
4.1%
3.4%
3.6%
3.5%
3.4%
2.7%
3.1%
Zn
%
1.0%
0.1%
0.3%
0.3%
0.3%
0.4%
0.4%
0.4%
0.4%
0.3%
0.5%
0.5%
0.4%
0.5%
1.2%
0.9%
0.2%
0.4%
0.4%
0.4%
0.4%
0.5%
0.4%
Ag
g/t
23
23
19
21
20
37
34
26
34
75
38
27
34
41
86
64
42
43
43
43
34
31
35
PbEq1
%
6.1%
6.1%
4.5%
4.1%
4.3%
4.6%
4.7%
3.6%
4.5%
6.7%
4.5%
3.4%
4.0%
4.0%
6.6%
5.3%
5.6%
4.9%
5.1%
5.0%
4.6%
3.8%
4.3%
Pb
kt
31
31
52
44
97
279
205
76
566
112
68
402
590
18
27
45
42
109
151
444
377
645
1,465
Contained Metal
Zn
kt
6
6
4
4
8
32
25
13
71
9
11
75
96
4
9
13
2
14
17
45
46
117
207
Ag
koz
427
427
859
862
1,720
9,995
6,331
2,414
18,948
6,668
2,617
14,039
24,090
923
2,052
2,975
1,382
4,474
5,856
17,521
12,114
23,406
53,042
Boab Metals
Establishing Deep Roots within the Local Community
Boab is extremely proud to be the Naming Rights
Sponsor of the Ord Valley Muster for
2023 and beyond.
•
Sense of community plays a key role in economic
and social well-being of stakeholders across the
east Kimberley Region.
•
The Ord Valley Muster has been a highlight of
the Kimberley community calendar for 20 years.
Boab is an enthusiastic supporter and active
contributor to the Teach Learn Grow program.
•
Boab Metals has been partnering with Teach
Learn Grow (TLG) since 2021 in the delivery of
their Rural Program which supports one-on-one
tutoring and mentorship to students in East
Kimberley schools.
Boab Metals Limited ASX: BML
Boab Metals Limited ASX:BML
Images: Ord Valley Muster 2023 and Simon Noon - Managing Director/CEO with team at Teach Learn
Grow, East Kimberley
23
Metal Equivalent
Calculations
The contained metal equivalence formula
is based on the Sorby Hills DFS including:
It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold. The formula used to calculate lead equivalent grade is:
• Lead Price US$2,253/t; and
Metal Eq (percent) = Gpri + (Gpri × [∑i Ri Si Vi Gi ]/(Rpri Spri Vpri Gpri))
• Silver Price US$27.4/oz.
Pb
Ag
Lead Equivalent Calculations
where R is the respective metallurgical metal recovery rate, S is the respective smelter return
rate, V is metal price/tonne or ounce, and G is the metal commodity grade for the suite of
potentially recoverable commodities (i) relative to the primary metal (pri).
• Silver recovery of 82% (weighted
average of oxide and fresh Ag
recoveries); and
Metal equivalents are highly dependent on the metal prices used to derive the formula. Boab notes
that the metal equivalence method used above is a simplified approach. The metal prices are based
on the DFS values adopted and do not reflect the metal prices that a smelter would pay for
concentrate nor are any smelter penalties or charges included in the calculation.
• Silver Payability rate of 95%.
Owing to limited metallurgical data, zinc grades are not included at this stage in the lead equivalent
grade calculation.
DFS Macroeconomic Assumptions
Silver Equivalent Calculations
• Lead recovery of 91% (weighted
average of oxide and fresh Pb
recoveries); and
• Lead Payability rate of 95%.
Boab Metals Limited ASX: BML
Assumption
Unit
FY2023 FY2024 FY2025
FY2026 FY2027+
Lead Price
US$/t
2,259
2,268
2,269
2,254
2,251
Silver Price
US$/oz
24.8
25.8
26.4
27.3
27.5
Exchange Rate
A$:US$
0.70
0.70
0.70
0.69
0.68