Further wide sulphide intersections as Maibele North grows
Released
Released
Announcement PDF
ABN 96 122 995 073
ASX Company Announcements Officer
27 August 2015:
FURTHER WIDE SULPHIDE INTERSECTIONS AS MAIBELE NORTH KEEPS
GROWING
___________________________________________________________________
HIGHLIGHTS:
11 resource infill holes completed in August 2015 including:
Numerous wide sulphide intersections returning:
o 26.77m - Strongly disseminated sulphides (MARD0117)
o 23.57m - Strongly disseminated sulphides (MARD0119)
Including:
0.93m semi-massive sulphide and
0.68m massive sulphide
o 14.36m - Disseminated sulphide including 3.31m Massive sulphide
(MARD0122)
o 15.47m – Strongly disseminated sulphides (MARD0128)
A further ~5900m of infill and step out holes schedule to be drilled
___________________________________________________________________
The Board of Botswana Metals Limited (“BML) is pleased to announce further positive
progress on the aggressive resource infill and step-out drilling program at the Maibele North
JV project in Botswana. To date, a total of 6,790m of a proposed ~12,500m program have
been completed which includes 42 drill holes, of which 9 are awaiting completion using
diamond tails.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Drilling in August has continued to intersect broad sulphide zones from within the current
resource envelope, which together with the new sulphides zones recently discovered 400m
along strike to the east, provide great encouragement for the success of the project.
A further ~5900m of drilling is scheduled and when complete, the results will facilitate an
upgrade of the current resource status and will also indicate the potential to increase the
resource along strike and at depth.
Figure 1: shows infill and step out holes drilled and proposed to be drilled. The purple shape represents the
Maibele North Resource model and the red Text-Boxes indicate step out holes so far completed. All SQUID
targets so far drilled have encountered sulphide mineralisation
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Overview:
A further 11 holes have been completed since the last market update (30/7/15)
To date, a total of 6789.36m have been completed in the 2015 drilling campaign
Most of the holes completed since the last release are infill holes within the extents
of the existing resource model
A number of encouraging sulphide intersections were returned
Highlights of the new intersections:
MARD0117
o Mineralised intersection: 162.03m to 188.80 (26.77 m) - Moderate to strong
disseminated sulphides
MARD0119
o Mineralised intersection: 137.15m to 160.72m (23.57m)
o Significant zones:
137.15m to 146.77m contains Cumulative 0.93m Semi-Massive
Sulphide in 3 zones
147.13m to 151.78m contains Cumulative 0.68m Massive Sulphide in 3
zones
MARD0122
o Mineralised intersection: 127.55m to 141.91m (14.36m)
o Significant zones:
127.55m to 127.85m - 0.30m Massive Sulphide
134.30m to 135.73m - 1.43m Massive Sulphide
136.64m to 138.22m - 1.58m Massive Sulphide
o Cumulative 3.31m Massive Sulphide within intersection
MARD0127
o Mineralised intersection:
73.46m to 74m (0.54m) - Massive Sulphides
MARD0128
o Mineralised intersection:
159.60m to 175.07m (15.47m) Strong Disseminated Sulphides
Including 174.75 to 175.07m – Semi-Massive Sulphides
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
MARD0130
o Mineralised intersection:
66.42m to 67.32m (0.90m) – Semi-Massive Sulphides
*Note: All intersections are quoted as down-hole lengths
Previous Intersection highlights outside the Resource (Announced to ASX on
30/7/15) Include:
o
Step out Hole: MARD0112: approximately 380m to the northeast of the Maibele
North resource intersected ~19m of sulphides from ~175m
o
Step out Hole: MARD0113 approximately 430m to the east of the Maibele North
resource intersected 9.85m of sulphides from 178m.
o
Step out Hole: MARD0115 approximately 330m to the east of the Maibele North
resource intersected ~1.3m of sulphides from 178m.
o
Step out Hole: MARD0116 approximately 160m to the east of the Maibele North
resource intersected 0.6m of Massive sulphides from ~206m
Additional 3 recent step out holes with Intersections all outside the known Maibele
Resource Include:
o
Step out Hole 106: some 200m downdip of the known Maibele North ore body
intersected 25m of mineralised sulphides over 2 zones: 9m from 289m and 16m
from 359m.
Step out Hole: 94 some 250m to the east of the Maibele North resource
intersected 6.82m of sulphides from 450m (drilled 2014).
Step out Hole 99: some 400m to the east of the Maibele North resource
intersected 5m of sulphides from 245m
o
o
SQUID technology: all SQUID Conductors drilled to date have returned
significant sulphide intersections returning a 100% success rate.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
The Board of Botswana Metals remains extremely encouraged by the results of the
current drilling and the commitment of the Joint Venture partners, BCL Limited, to
progressing Maibele North. The results have so far highlighted the potential to
upgrade the resource to an indicated status and also the great potential to increase
the resource with additional sulphide zones discovered along strike and at depth.
All sulphide zones are currently being prepared for assay and results will be released
to the market as soon as they are available.
For more information:
Pat Volpe
Chairman
Tel: +61 3 9855 1885
Fax: +61 3 9855 2885
Email: patv@botswanametals.com.au
Web: www.botswanametals.com.au
The information in this report that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by BML staff on site and
provided to Mr Steve Groves who is a Member of The Australasian Institute of Mining and
Metallurgy. Mr Groves is a consulting geologist to BML and has previously been employed
as the Exploration Manager at BML. Mr Groves has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Groves consents to the inclusion in this report of the matters based on his
information in the form and context in which it appears.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
CRITERI
A
JORC Code Explanation
Commentary
Sampling
techniques
- Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
- Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
- Aspects of the determination of
mineralisation that are Material to
the Public Report.
- In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may
warrant disclosure of detailed
information.
Drill core is neatly arranged in
1 m core trays for HQ core
(mainly oxidised horizon) and
1.5 m core trays for NQ core
(mainly competent rock).
Core is marked at every metre
along an orientation line and
later marked at 0.05 m for
handheld XRF analysis.
Spot analysis at every 0.05 m
interval is analysed at the
BML site office in Tshokwe
using
a
portable XRF
analyser (INNOV-X Delta
Premium). Standards and
blanks are used to monitor the
calibration of the instrument.
The spot values are then
averaged at 0.5 m intervals, to
give an estimated grade at 0.5
m intervals. This estimate is
only used as a guide to
determine where core should
be sampled and analysed by
the laboratory
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERI
A
JORC Code Explanation
Commentary
Drilling
techniques
- Drill type (eg core, reverse
circulation ,open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, face
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).
Drill
sample
recovery
- Method of recording and
assessing core and chip
sample recoveries and results
assessed.
- Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
- Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
•
The drillhole is pre-collared
with HQ in the weathered
rock. HQ pre-collars range
from 15 m to 30 m using a
standard tube. NQ diamond
core drilling is used to
complete the hole.
Weathered rock is too friable
to orientate using the spear
method. Only the competent
rock is orientated (from
approximately 30 m to the
end of hole).
Drillholes are mostly
orientated between 320° and
350°, inclined between 50°
and 65°.
The core length is measured
after every run. Results are
compared to the actual run
length to calculate core
recoveries. Core is handled
with care to avoid breakage
and crumbling. Core is
washed and placed onto
holding core trays.
HQ is used on friable ground,
rotation speeds and water
pressure are monitored to
avoid destroying the core. A
soft rubber mallet is used to
drive out core from the barrel.
Overall core recovery in the
mineralised zones is >98%.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERI
A
JORC Code Explanation
Commentary
Logging
- Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
- Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
- The total length and
percentage of the relevant
intersections logged.
•
Core is washed and stored in
diamond core trays in both 1
m and 1.5 m intervals,
depending on whether the
material recovered is
oxidised or fresh. Diamond
core is visually inspected,
recording lithology,
weathering, alteration,
mineralisation, veining and
structure. The core is also
geotechnically logged for
RQD.
Core photography is
performed on every hole with
photos having two full core
trays with clear interval
details on a white
background. Wet and dry
core is photographed.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERI
A
JORC Code Explanation
Commentary
Subsampling
technique
s and
sample
preparatio
n
- If core, whether cut or sawn and
whether quarter, half or all core
taken.
- If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
- For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
- Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
- Measures taken to ensure that the
sampling is representative of the in
situ material collected, including
for instance results for field
duplicate/second-half sampling.
- Whether sample sizes are
appropriate to the grain size of
the material being sampled.
- The nature, quality and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
- For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times,
calibrations factors applied and
their derivation, etc.
- Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
Quality of
assay
data and
laboratory
tests
All relevant drilling is
diamond core drilling in the
mineralised and surrounding
zones. Core is cut
longitudinally along an
orientation line with half core
used for metallurgical test
work. The remaining half
core is cut into quarters for
lab assaying and storage.
A sub-sampling approach is
applied for SG whereby 1015 cm samples are taken
from specific rock types
An Olympus Innov-X Delta
Premium
portable
XRF
analyser was used to guide
core sampling.
Blanks,
duplicates
and
standards are inserted at a
rate of approximately 13%,
although the blank material is
appears to have elevated
values of Ni and Cu. The
duplicates are prepared and
inserted by the laboratory and
are not inserted blindly by the
onsite
geologist.
The
performance of the CRM
analyses is acceptable.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERI
A
JORC Code Explanation
Commentary
external laboratory checks) and
whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established.
Verificati
on of
sampling
and
assaying
Locatio
n of
data
points
- The verification of significant
intersections by either
independent or alternative
company personnel.
- The use of twinned holes.
- Documentation of primary data,
data entry procedures, data
verification,
data
storage
(physical
and
electronic)
protocols.
- Discuss any adjustment to assay
data.
- Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys),
trenches, mine workings and
other locations used in Mineral
Resource estimation.
- Specification of the grid system
used.
- Quality and adequacy of
topographic control.
-
No verification work of
significant intersections has
been completed
The Competent Person
confirmed the collar positions
and sampling intervals
onsite.
No twin holes have been
drilled
No statistical adjustments to
data have been applied
All of the drillhole collars
have been surveyed using a
DGPS.
A number of drillhole collars
have been observed by MSA
in the field.
Down-the-hole surveys were
conducted for all holes.
The grid system for the
project is UTM WGS84.
The topography model was
derived from the drillhole
collar elevations and
modelled in Leapfrog.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Data
spacing
and
distributio
n
- Data spacing for reporting of
Exploration Results.
- Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
- Whether sample compositing
has been applied.
Orientatio
n of data
in relation
to
geologica
l
structure
- Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
- If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported
if material.
Sample
security
- The measures taken to ensure
sample
security.
- The results of any audits or reviews
of
sampling techniques and data.
Audits or
reviews
The drillholes were spaced at
an average of 50 m apart on
strike and from 25 m to 50 m
on dip (along the drilling
fence).
The drillhole spacing is
sufficient to assume
geological and grade
continuity for this type of
mineralisation but insufficient
for grade continuity to be
confirmed.
Samples have been
composited according to
mineralisation zone.
Drillholes are mostly
orientated between 320° and
350°, with dips ranging from
50° to 65° to perpendicularly
intersect mineralisation.
Appropriate chain-of-custody
procedures were followed to
ensure sample security.
The data were examined by
the
independent consultant Mr
Steve Groves of Perth in
Australia and considered
appropriate.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
CRITERIA
JORC Code Explanation
Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number,
location and ownership
including agreements or
material issues with third
parties such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
• The security of the tenure
held at the time of reporting
along with any known
impediments to obtaining a
licence to operate in the area.
• Acknowledgment and appraisal
of
exploration by other parties.
The results reported in this
announcement are located in
PL110/94 which is a granted
Exploration Licence held by
African Metals Limited, a 100%
owned subsidiary of Botswana
Metals Limited.
PL110/94 is subject to a Joint
Venture agreement with BCL
Limited.
PL110/94 was recently
extended for a further two years
and is in good standing.
Exploration
done by other
parties
Interpretations and conclusions
in this announcement refer in
part to results generated by
historic exploration work
conducted by Roan Selection
Trust, Falconbridge, Cardia
Mining and Botswana Metals.
Botswana Metals considers all
previous exploration work to
have been undertaken to an
appropriate professional
standard.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
JORC Code Explanation
Commentary
Geology
• Deposit type, geological
setting and style of
mineralisation.
The Maibele North Prospect is
hosted within the Magogaphate
Shear Zone - a major
geological structural feature,
generally considered to mark
the boundary between the
Archaean aged (>2.5 billion
year old) Zimbabwean Craton
and the Limpopo Belt or
Limpopo Mobile Zone (LMZ). .
The nickel-copper deposits of
Selebi Phikwe lie within the
northern part of the Central
Zone of the Limpopo Mobile
Belt, whilst the nickel copper
deposits of Phoenix, Selkirk
and Tekwane lie in the
Zimbabwean
Craton.
The
Central Zone of the LMZ
comprises variably deformed
banded gneisses and granitic
gneisses, infolded amphibolites
and ultramafic intrusions that
that have the potential to host
Ni-Cu sulphide mineralization.
Ni-Cu-PGE mineralization at
Maibele North and Airstrip
copper is spatially associated
with an ultramafic intrusion.
Drill hole
Information
• A summary of all information
material to the understanding
of the exploration results
including a tabulation of the
following information for all
material drill holes:
o easting and northing of
the drill hole collar
o elevation or RL (Reduced
Level – elevation above
Refer to Appendix 1.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Data
aggregation
methods
JORC Code Explanation
sea level in metres) of the
drill hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
• If the exclusion of this
information is justified on the
basis that the information is not
Material and this exclusion
does not detract from the
understanding of the report, the
Competent Person should
clearly explain why this is the
case.
• In reporting Exploration
Results, weighting averaging
techniques, maximum and/or
minimum grade truncations
(eg cutting of high grades) and
cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts
incorporate short lengths of
high grade results and longer
lengths of low grade results,
the procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
• The assumptions used for
any reporting of metal
equivalent values should be
clearly stated.
Commentary
With regards to the MRE:
Mineralised intersections are
composited to 2 m lengths per
Zone.
No discernible relationship
exists regarding sample length
and grade.
With Regards to reported drill
intersections
Where uneven sampling
intervals have contributed to
an averaged result, the result
has been calculated by a
weighted average technique
that incorporates the interval
width of each contributing
sample.
A grade cut off of 0.3% and
internal dilution of <2m has
been used in the calculation of
significant intercepts.
No grade truncations have
been applied to the data.
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
Relationship
between
mineralisatio
n widths and
intercept
lengths
JORC Code Explanation
• These relationships are
particularly important in the
reporting of Exploration
Results.
• If the geometry of the
mineralisation with respect to
the drill hole angle is known,
its nature should be reported.
• If it is not known and only the
down hole lengths are
reported, there should be a
Commentary
The Maibele North ore is
interpreted to be genetically and
mineralogically similar to the ore
treated at the nearby Selebi
Phikwe smelter where current
recovery grades in the flotation
plant average 84% for Ni and
95% for Cu. Where Ni Eqv
calculations have been
undertaken on historic assay
results it has been assumed
that similar high recoveries will
be achievable. The current drill
program has been designed to
assess the metallurgical
properties of the Maibele North
mineralisation and the indicative
recoveries will be published in
due course.
Given that that the Maibele
North project is currently the
subject of a Joint Venture with
the nearby Mine and Smelter
operator, BCL, BML assumes
that no impediments in
recovering and selling the
metals contained in the deposit
would exist provided an viable
economic resource can be
defined.
The precise geometry of
the mineralization with
respect to the drill hole
angle is not known and
thus, all drill hole results
are reported as down hole
length.
The drill holes in the current
program are inclined
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
JORC Code Explanation
Commentary
clear statement to this effect
(eg ‘down hole length, true
width not known’).
reconnaissance holes based on
the average dip of exposed
units. The orientation of the
mineralization is unknown and
true width is unknown.
Geotechnical logging is under
way to address the geometry of
mineralisation.
Diagrams
• Appropriate maps and sections
(with
scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include,
but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Plan view and/or cross section
maps of the reported drill holes
are included in this
announcement.
Balanced
reporting
• Where comprehensive reporting
of all
Exploration Results is not
practicable,
representative reporting of both
low and
high grades and/or widths
should be
practiced to avoid misleading
reporting of Exploration Results.
• Other exploration data, if
meaningful and material, should
be reported including (but not
limited to): geological
observations; geophysical
survey results; geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test
results; bulk density,
groundwater,
The results in this
announcement are interpreted
to lie within the plane of a
mineralized trend that is
coincident with an ultramafic
intrusion and encompasses the
Maibele North and Airstrip
Copper Prospects.
Other
substantive
exploration
data
There is no other material
exploration considered material
to the reported mineral estimate
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
CRITERIA
JORC Code Explanation
Commentary
geotechnical and rock
characteristics;
potential deleterious or
contaminating
substances.
Further work
• The nature and scale of
planned further work (eg
tests for lateral extensions or
depth extensions or largescale step-out drilling).
• Diagrams clearly highlighting
the areas of possible
extensions, including the main
geological interpretations and
future drilling areas, provided
this information is not
commercially sensitive.
• Should the scoping study
prove positive, infill drilling
would be required to upgrade
the Mineral Resource
classification.
Appendix 1: Details of holes drilled to 20/08/2015
Hole Number
Easting
Northing
Dip
Azi
Total Depth
MARC0099
MARD0107
MARD0106
MARD0100
MARD0101
MARD0102
MARD0104
MARD0105
MARD0103
633090
633820
632303
632236
632357
632458
632493
632690
632286
7595876
7595876
7595149
7595388
7595479
7595454
7595541
7595598
7595434
-60
-75
-60
-55
-55
-55
-55
-55
-55
335
335
330
330
330
330
330
330
330
255
550.4
376.18
183.05
140.1
175.05
125.1
203.1
156.75
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
ABN 96 122 995 073
MARD0110
MARD0108
MARD0109
MADD0111
MARD0113
MARD0112
MARD0114
MARD0115
MARD0116
MARD0117
MARD0118
MARD0119
MARD0120
MARD0121
MARD0122
MARD0123
MARD0124
MARD0125
MARD0126
MARD0127
MARD0128
MARD0129
MARD0130
MARD0131
MARD0132
MARD0133
MARD0134
MARD0135
MARD0136
MARD0137
632523
7595490
632381
7595345
632366.9 7595404.6
632340.3 7595375.5
633127.5 7595915.7
633081
7595890.6
633174
7595946
633036
7595862
632942
7595734
632256
7595347
632340
7595375
632642
7595587.5
632799.65 7595609.96
632511.82 7595615.22
632611
7595586
632431.7 7595400.2
632781
7595551
632580.52 7595638.25
632436.4 7595545.8
632391
7595532
632730.8 7595635.8
632868.1 7595698.9
632284.7 7595514.5
632163.1 7595393.1
632082
7595359
632111
7595295.5
632124.3 7595377.5
632196
7595334.1
632313.9 7595273.9
632630
7595499
-55
-55
-55
-55
-60
-60
-60
-60
-60
-60
-55
-55
-60
-55
-55
-55
-60
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
180.06
227.1
212.05
19.23
215.1
244.13
202
250.15
248.15
229.56
260.12
170.1
260
85.2
150.06
170
222
70
110
40
140
200.2
80.2
55
45
110
50
120
150
85
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, V
Share your feedback