JOINT VENTURE CONTINUES WITH SCOPING STUDY
Released
Released
Announcement PDF
ABN 96 122 995 073
DATE: 29 APRIL 2015
ASX Code: BML
TO: ASX COMPANY ANNOUNCEMENTS OFFICE
______________________________________________
JOINT VENTURE CONTINUES WITH SCOPING STUDY
BCL –BML: PARTNERS PLAN TO INCREASE RESOURCE WITH
SIGNIFICANT DRILL TARGETS IDENTIFIED
Following on from the Maiden JORC (2012) resource announcement yesterday, the Board of
Botswana Metals Limited is please to advise that MSA Consultants will move to complete a
Scoping Study on behalf of the Joint Venture partners BCL Limited and BML Limited. Plans
are also on the way for a proposed drill program to increase the now known Ni +Cu+ PGE’s
resource.
The final scoping study may include further drilling at Maibele North to test the now known
down hole EM anomalies at depth and also the ground EM anomalies to the west between
Maibele North and Airstrip Copper . Target drilling may also cover the east where both
ground EM has been completed along strike from Maibele North and also drill hole 94 which
encountered mineralisation some 250 metres away from Maibele North where the down
hole EM has picked up a conductor response. It should be noted that hole 94 was not
included in MSA Resource Calculation.
These VTEM, DHEM and TDEM conductor are being analysed by an independent consultant
and a report is expected to recommend a proposed further drilling program.
If the JV partners agree to go ahead, a drilling program would be expected to commence in
the June 2015 quarter.
It is expected that the scoping study will continue and include a next round of drilling aimed
to increase the now known JORC 2012 inferred Ni + Cu + PGEs resource.
Pat Volpe
Chairman
Botswana Metals Limited
Mailing Address Suite 3, 16 Cotham Road, Kew, Victoria 3101
Registered Office Suite 506, Level 5, 1 Princess Street, Kew, Victoria 3101
P: +61 3 9855 1885; F: +61 3 9855 2885
Email info@botswanametals.com.au
www.botswanametals.com.au
Share your feedback
Discover