Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) is pleased to announce the successful
completion of its short Phase VIII drilling campaign at its 75% owned Sorby Hills Lead-Silver-Zinc
Project (“Sorby Hills” or “the Project”), located in the Kimberley Region of Western Australia.
HIGHLIGHTS
•
New mineralisation encountered at the Keep Seismic Target during the Phase VII
drilling program has been successfully followed up via a Phase VIII drilling program.
•
The Phase VIII drilling program comprised 4 deep sonic/diamond drill holes for a total
of 1,352m and was completed ahead of schedule and within budget.
•
Further intervals of visual mineralisation have been intercepted, including intervals of
massive sphalerite (ZnS).
•
Visual results indicate a major exploration success and support planning of an
extensive exploration drilling campaign at the new KEEP discovery.
•
Assay results anticipated to be received in early Q4 2024.
Boab Managing Director and CEO, Simon Noon, stated:
“We are pleased to report the successful completion of our 2024 drilling campaign and
furthermore that the Keep Seismic Target is continuing to show positive results.
The recent drilling has intersected further lead and zinc-sulphide mineralisation. This is an
outstanding success given the conceptual nature of the target and its location in an area and at
a depth where no mineralisation was intersected before.”
The proximity of the mineralisation to our existing Sorby Hills deposits is particularly important
and speaks to the significant near mine exploration potential of the Project and the Burt Basin
regional more broadly”.
Background
In early August, Boab announced the commencement of a Phase VIII drilling program to follow up
on its exploration success from the 2023 campaign at the Keep Seismic Target.
The Phase VIII drilling program comprised of 4-hole deep sonic/diamond step out drill holes for a
total of 1,352m and was completed ahead of schedule and within budget.
The collar locations for all the completed drill holes are shown in Figure 1.
Figure 1: Plan view of the Sorby Hills Project showing the locations of completed drill holes for Phase VIII
with respect to previous drilling, the Mineral Resource and DFS open pit outlines.
Keep Seismic Target
The planned Phase VIII drilling program comprised 4 diamond drill holes around the discovery hole
SDSH_185 (Figure 1). The new drill holes were collared as 100m step-outs from the original drill hole
position to enable correlation and interpretation of the original results.
SHSD_185 was aimed at testing the potential for a mineralised feeder fault system, which can be
seen on the seismic data and the potential for stratiform mineralisation at the base of the Knox
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
Formation/Sorby Dolomite interface (Figure 2).
In summary, the program delivered several important results:
1.
One significant intercept of mineralisation to demonstrate the validity of the targeting
rationale.
2.
Intersected further intervals of massive stratiform sphalerite mineralisation, and
3.
Demonstrated the role of structure in the distribution and deformation of mineralisation.
The Keep Seismic Target area is a compelling sub-surface target, and its complexity is well illustrated
on seismic data (Figure 2). This complexity is confirmed in the rock formation development,
thicknesses variation and mineralisation distribution as intersected in the 4 drill holes completed.
Figure 2 – Pre-drilling interpreted ENE-SSW trending seismic line WP_96-08 image showing the location of
the SHSD_185 and the conceptual structural target as well as key stratigraphic reflectors within M80/287 &
289.
Collectively, the 3D interpretation of the geological formations intersected in the four drill holes,
confirms the strong structural control, displacement and abrupt rock type changes indicated in
(Figure 2).
The new data confirms the interpretation that drilling took place along the western flank of a graben
structure that consists of a series of extensional faults with displacements of several tens of metres
of basin-wards (Figure 3).
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
The faulting is interpreted to have taken place episodically and over a period. The earlier episode
affected the transitional period from the Sorby Dolomite to the Knox Formation leading locally to
channels of sedimentary breccias near the top of the Sorby Dolomite which control the location of
much of the project mineralisation. The latter deformation period post-dates the youngest
Carboniferous strata in the project area and has led to the observed fault and strata geometry. The
entire stratigraphic succession dips at about 17°-20° to the east-northeast (Figure 3).
Figure 3 -Post-drilling interpreted close view cross and long section and geological interpretation of
SHSD_186, SHSD_185 and SHSD_189 and seismic line WP_96-08.
The western most drill hole (SHSD_186) did not intersect Milligans Formation below the river gravels
but showed a significant sedimentary breccia developed below the Sorby Dolomite/Knox Formation
interface, indicating a significant change over 100 m to the west from the SDSD_185. Only traces of
mineralisation were noted in the Sorby Dolomite. On the down-dip side, east of SHSD_185, in
SHSD_189, a complete and comparable stratigraphic succession was intersected although, the dip
measurements suggest a significant displacement down dip over a set of normal faults (Figure 3).
The hole intersected significant stratabound mineralisation below the Knox Formation contact,
similar to that found in SHSD_185. The mineralisation occurs intermittently beginning from 303m
until about 325.5m depth and consist of intervals of massive banded colloform sphalerite between
303 and 305m. Between 308 and 311m and between 314.5 and 325.5m several intervals of coarsegrained disseminated matrix-replace galena are observed (Figures 4 & 5).
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
Base of Knox Formation
ZnS
ZnS
ZnS & PbS
Figure 4 - Photograph of drill core interval 298.8 m to 305.35 m showing massive sphalerite + galena
mineralisation intervals.
Figure 5 -Photograph of HQ size (6.5 cm diameter) drill core interval from 314.9.3 m to 315.4 m showing
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
matrix replacing coarse galena mineralisation and disseminated sphalerite.
The longitudinal section (Figure 3, RHS) trends south to north and relates holes SHSD_188 and
SHSD_187 to hole SHSD_185. Despite a minor tilt of the strata to the north, there is good stratigraphic
and lithological correlation in terms of rock type and thickness to the northern drill hole above the
top of the Sorby Dolomite. Below the contact, the Sorby Dolomite is more or less massive, lacking
any evidence of the sedimentary breccia.
To the south (SHSD_188), the stratigraphy continues seamlessly despite a minor fault displacement.
The main lithological difference occurs below the top of Sorby Dolomite in the form of a thick, and
well-developed sedimentary breccia body (Figure 3, RHS).
Metallogenically, a 2.4m thick massive, but fragmented marcasite (FeS) interval with intergrown
galena was intersected between 265.4 and 267.8m in SHSD_187, at the level of zinc-lead
mineralisation in SHSD_185. Fault breccias and fractures filled with calcite and base metals in the
hanging wall and footwall of this interval suggest a structural control. In SHSD_188, an interval of
fault-controlled galena mineralisation, mostly of disseminated, vein and cavity fill style, was
intersected immediately below the Milligans Formation over an interval of 15.5m starting from 66.5m
down hole. This unusual location and style of mineralisation highlights the structural control for
mineralisation in the target zone.
Table 1: Significant intercepts of mineralisation, visual estimates* and description of
style of mineralisation
HOLE ID
From (m)
To (m)
Interval
Gn%
Sp%
Mc%
SHSD_187
265.4
267.8
2.4
3
Tr
80
SHSD_188
66.5
81.0
14.5
2.5
0.5
2
SHSD_189
164
167
3
Tr
0.5
1
SHSD_189
303
305
2
2
8
2
SHSD_189
308
311
3
3
0.5
2
SHSD_189
314.5
324.5
10
3
0.5
2
SHSD_198
324.5
325.5
1
0.5
4
.5
Description
Massive brecciated marcasite
with interstitial galena
Disseminated and fault matrix,
and host rock replacive style
Fracture fill and carbonate
replacement style
Massive colloform, banded
carbonate replacement style
Disseminated coarse grained
stratabound galena
Disseminated coarse grained
stratabound galena
Massive colloform, banded
carbonate replacement style
Gn = Galena Sp = Sphalerite Mc = marcasite/pyrite Tr = Trace
* In relation to the disclosure of visual mineralisation, Boab Metals cautions that visual estimates of sulphide and
oxide minerals abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory
assay results are required to determine the widths and grade of the visible mineralisation reported in the
preliminary geological logging. Boab Metals will update the market when laboratory analytical results become
available.
In summary, the technical results so far, have justified the approach, the risk taking and the
interpretation of a location prospective for mineralisation that previously was dismissed.
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
Boab is of the view that the second campaign of drilling at the Keep Seismic Target is another
successful exploration step strengthening not only the concept but more importantly confirming
the potential of the Burt Range Basin to host significantly more base metal mineralisation. Core
samples have been submitted for analysis to Intertek Laboratories in Perth.
The Board of Directors have authorised this announcement for release to the market.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Simon Noon
Managing Director & CEO
Phone: +61 (0)8 6268 0449
Email: info@BoabMetals.com
About Boab Metals Limited
Boab Metals Limited (“Boab”, ASX: BML) is a Western Australian based exploration and
development company with interests in Australia and South America. In Australia, the Company
is currently focused on developing the Sorby Hills Lead-Silver-Zinc Joint Venture Project in WA.
Boab owns a 75% interest in the Joint Venture with the remaining 25% (contributing) interest held
by HenanYuguang Gold & Lead Co. Ltd.
Sorby Hills is located 50km from the regional centre of Kununurra in the East Kimberley and has
existing sealed roads to transport concentrate from site to the facilities at Wyndham Port, a
distance of 150km. Established infrastructure and existing permitting allows for fast-track
production.
Compliance Statements
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public
Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.
Information included in this Announcement relating to Exploration Results has been extracted
from the ASX Announcements titled “Assays Confirm Further Positive Outcome for Sorby” dated
23 January 2023, “Sorby Hills DFS Metallurgical Testwork Results” dated 19th November 2021
available to view at www.boabmetals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in these announcements.
The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the form in which they were first presented.
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
Information included in this Announcement relating to Mineral Resources has been extracted
from the Mineral Resource Estimate dated 17 December 2021, available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the Mineral Resource Estimate and that all
material assumptions and technical parameters underpinning the estimates, continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Mineral
Resource Estimate.
Information included in this announcement relating to Ore Reserves, Production Targets and
Financial Forecasts has been extracted from the FEED study and dated 6 June 2024, available to
view at www.boabmetals.com The Company confirms that it is not aware of any new information
or data that materially affects the information included in the Ore Reserve Statement and that all
material assumptions and technical parameters underpinning the estimates, production targets
and financial forecasts continue to apply and have not materially changed. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Ore Reserves Statement.
Table 1 - Drill Hole Collar Locations and Assay Status
HOLE ID
mE
mN
RL
Depth
Dip
Azimuth
Assays
Prospect
SHSD_186
8288017
498243
19
282.4
-65
270
Pending
Exploration
SHSD_187
8288117
498355
20
318.4
-70
270
Pending
Exploration
SHSD_188
8287917
498355
20
300.4
-65
270
Pending
Exploration
SHSD_189
8288017
498486
20
450.4
-65
270
Pending
Exploration
_________________________________________________________________________________________________________________________________________________
___________________________________________________
Boab Metals Limited
JORC Code 2012 Edition - Table 1
Section 1 Sampling Techniques
(Criteria listed in the preceding section also apply to this section)
Criteria
Sampling
techniques
JORC Code Explanation
•
Nature and quality of sampling (e.g. cut channels,
random
chips,
or
specific
specialised
industry standard measurement tools appropriate
to the minerals under investigation, such as down
hole gamma
sondes, or
handheld
XRF
instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report.
Commentary
•
For the sonic/diamond drilling program (from June to August 2023),
sampling was not conducted in the field. After geological logging the
cutting/sampling intervals were determined and marked. The drill core
destined for sampling has been shipped to ALS laboratories in Perth for
cutting and sampling. The sampling process will be supervised by Boab
geologists.
•
The Sonic pre-collars were geologically logged but not samples. The
diamond core intervals were geologically logged by a geologist and assessed
for visible mineralisation. Where necessary samples was also scanned with a
portable XRF (Olympus InnovX Delta) for an indication of qualitative lead
concentration. About 45% of all samples have been submitted to the
laboratory.
•
The sampling methodology to be undertaken at ALS laboratories is
considered representative and appropriate for the carbonate hosted style of
mineralisation at Sorby Hills and is consistent with sampling protocols in the
past conducted by Boab.
•
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems.
Unusual commodities or
mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
•
The drilling method used in the Phase VII 2023 drill program is sonic pre
collars until bedrock was reached followed by diamond drilling (DD).
Drill sample
recovery
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
•
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
The sample (core) recovery is between 98 and 100% for most of the core
drilling including the mineralised intervals. The were very few occasions
where broken ground conditions were encountered where the core loss
due to core grinding was encountered.
____________________________________________________________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 9
Criteria
Logging
Sub-sampling
techniques and
sample
preparation
Quality of assay
data and
laboratory tests
JORC Code Explanation
•
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
•
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc)
photography.
•
If core, whether cut or sawn and whether quarter,
half or all core taken.
•
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
•
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Commentary
•
The DD core was logged at the rig at the temporary work site at Sorby
Hills. The core geotechnically, geologically, structurally and
mineralogically logged on site and photographed.
•
¼ core samples will be analysed first for metallurgical drill holes and ½
core for the remaining drill holes.
•
All samples will be sent to ALS Laboratories in Perth for preparation and
analysis. Duplicates, blanks and standards inserted at regular intervals.
•
All samples will be assayed to accepted industry standards at the ALS
Laboratories in Perth. Multi-acid digestion of pulverised sample was
followed by ICP-OES or equivalent assay technique.
•
Certified Ore Grade Base Metal Reference Material provided by Geostats
Pty Ltd. The standards selected covered a range of lead and silver
concentrations and there is good agreement between the Pb and Ag
assays, and the mean values provided with the reference standards. For
____________________________________________________________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 10
Criteria
JORC Code Explanation
•
Verification of
sampling and
assaying
Location of data
points
Data
spacing
and distribution
Orientation of
data in relation
to
geological
structure
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Commentary
the standards the assayed values were within half of one standard
deviation and more commonly below the mean suggesting that grade
overestimation is not a significant problem in the dataset.
•
Duplicates and Blanks were also included in all sample despatches.
•
Geological logs were digitally entered into data entry templates in MS
Excel and entered into an Access database.
•
Assay certificates were received from the analytical laboratories and
imported into the drill database.
•
No adjustments were made to the assay data.
•
The verification of significant intersections by
either independent or alternative company
personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
•
Accurately surveyed using a DGPS by a registered surveyor and recorded
in GDA94 Zone 52 will be conducted at the end of the program.
•
•
Specification of the grid system used.
All drill holes are surveyed down hole on completion of the drill hole with
a Reflex Gyro tool every 30 m.
•
•
Quality and adequacy of topographic control.
The initial siting of the drill hole position is based on planned coordinates
from the 3D data base and GPS positioning in the field
•
Data spacing for reporting of Exploration Results.
•
•
Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
The spacing between new and existing drill holes can range from a
minimum of 50 m to 25 m spaced collars.
•
Most drill holes at the Norton Deposit are inclined at -70 degrees to the
west holes.
•
One hole drilled at Beta at -70 deg to the northwest (315deg), and at the
Keep Seismic Target -70 to the west to better sample both shallow and
steeply dipping mineralised structures considered significant to the
mineralisation.
•
It is not considered that there is a significant sampling bias due to
structure.
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
•
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
____________________________________________________________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 11
Criteria
JORC Code Explanation
Commentary
Sample security
•
The measures taken to ensure sample security.
•
Cores trays are stored and processed at a secure facility at site. All samples
taken by Boab personnel to the truck depot in Kununurra and placed on
pallets for transport direct to ALS Laboratory in Perth.
Audits or reviews
•
The results of any audits or reviews of sampling
techniques and data.
•
To be undertaken.
____________________________________________________________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 12
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement
and land tenure
status
JORC Code Explanation
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
•
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Commentary
•
Boab Minerals Ltd acquired a 75% interest in the Sorby Hills lead-silver
project in Western Australia on 5 October 2018. Yuguang (Australia) Pty
Ltd and wholly owned subsidiary of Henan Yuguang Gold & Lead Co. Ltd
(HYG) owning the remaining 25%. The Sorby Hills Project comprises five
mining leases (M80/196-197 and M80/285-287) (see Table 2 below), all of
which are currently held jointly between Sorby Hills Pty Ltd (75%) and
Yuguang (Australia) Pty Ltd (25%).
•
In addition, Boab has 100% ownership over the Eight Mile Project which is
immediately south of the Sorby Project area.
Table 2: Sorby Hills Tenement Summary
Tenement
Area (km2)
Boab
Ownership
%
M80/196
9.99
75%
22/01/1988
21/01/2030
M80/197
9.95
75%
22/01/1988
21/01/2030
M80/285
5.57
75%
29/03/1989
28/03/2031
M80/286
7.89
75%
29/03/1989
28/03/2031
M80/287
8.15
75%
29/03/1989
28/03/2031
E80/5317
217
100%
05/03/2020
04/03/2025
Granted
Expiry
•
The Mining Leases are centred at coordinates 128°57’E, 15°27’N.
•
The project area is approximately 50 km north-northeast of the township
of Kununurra and covers a total area of 12,612.40 hectares (ha).
•
The Mining Leases were granted prior to the High Court acknowledging
Native Title and therefore native title has been extinguished over the MLs.
•
The project area lies adjacent to proposed Goomig Range Conservation
Park.
•
Tenure is in good standing until 2030 (in some cases, out to 2031. M80/286
& M80/197 have a current cultural clearance access agreement in place; for
the remaining mining tenements normal cultural clearance plans would
be required. No mining agreement has been negotiated.
____________________________________________________________________________________________________________________________________________________________________________________________________
Boab Metals Limited
Page 13
Criteria
Exploration done
by other parties
Geology
JORC Code Explanation
•
•
Acknowledgment and appraisal of exploration
by other parties.
Deposit type, geological setting and style of
mineralisation.
Commentary
•
The Sorby Hills area has been systematically explored by numerous
companies since 1971. Prominent amongst these were ELF Aquitaine (19731981) with various JV partners (SEREM, St Joe Bonaparte & BHP), BHP (19811988), in JV with Triako; and CBH/Kimberley Metals/KBL Mining.
•
Previous work included, geologic mapping, soil geochemistry, airborne
and ground geophysics and extensive drilling campaigns.
•
The Sorby Hills mineralisation is regarded as having many features typical
of Mississippi Valley Type (MVT) deposits. Recent geological assessment
has refined this to a carbonate-replacement system, with the bulk of the
mineralisation focused on the contact between the Lower Knox Sediments
and the Upper Sorby Dolomite. However, at the Beta deposit the
mineralisation is hosted in the hanging wall of the Knox Formation and
within the Lower part of the Upper Formation, specifically withing
graphitic fossiliferous carbonate rocks.
•
The Sorby Hills mineralisation consists of 7 discrete and partly
amalgamated carbonate-hosted Ag Pb Zn deposits (previously referred to
as pods): A–J, Beta East, Beta West and Alpha. The deposits form a curvilinear north-south belt extending over 7 km, sub parallel to the eastern
margin of the Precambrian Pincombe Inlier and within the Carboniferous
Burt Range Formation of the Bonaparte Basin.
•
The bulk of the mineralisation is stratabound and hosted mainly on the
contact between Knox Sediments and Sorby Dolomite and in dolomitic
breccia which is typically developed at the contact of a crystalline dolomite
unit and overlying dolomitic siltstone which generally dips shallowly to the
east.
•
However, during the course of this work program at least one drill hole
drilled deeper into the footwall also indicated a zone of intense
hydrothermal breccia type of mineralization. While this style of
mineralisation is sporadically referenced in the past its geometry is yet to
be defined; its location in the hanging wall of a structure may suggest a
genetic correlation which can serve as a guide to future targeting.
•
The stratabound deposits average 7–10 m in thickness, are from 2 km long
and 100 to 500 m wide. There is some structural control to the
mineralisation, with higher grade zones associated with faulting.
Mineralisation is often thicker and/or of higher grade in areas of strong
brecc