Half Yearly Report and Accounts
Released
Released
Announcement PDF
ABN: 43 107 159 713
CONSOLIDATED INTERIM FINANCIAL REPORT
For the Half Year Ended
31 December 2024
CORPORATE DIRECTORY
________________________________________________________
DIRECTORS
Gary Comb (Chairman)
Simon Noon (Managing Director & CEO)
Richard Monti (Non-Executive Director)
Andrew Parker (Non-Executive Director)
COMPANY SECRETARY
Jerry Monzu
REGISTERED OFFICE
4 Clive Street
WEST PERTH WA 6005
SHARE REGISTRY
Automic Group Pty Ltd
Level 5, 191 St Georges Terrace
PERTH WA 6000
BANKERS
Australian and New Zealand Banking Group Limited
Level 1, 1275 Hay Street
WEST PERTH WA 6005
AUDITORS
BDO Audit Pty Ltd
Level 9 Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
STOCK EXCHANGE LISTING
Boab Metals Limited shares are listed on the
Australian Stock Exchange (Home Branch – Perth)
ASX code ‘BML’
WEBSITE ADDRESS
www.boabmetals.com
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 1
TABLE OF CONTENTS
________________________________________________________________
DIRECTORS’ REPORT
3
AUDITOR’S INDEPENDANCE DECLARATION
8
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
9
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
10
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
11
CONSOLIDATED STATEMENT OF CASH FLOWS
12
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
13
DIRECTORS’ DECLARATION
20
INDEPENDENT AUDITOR’S REVIEW REPORT
21
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 2
DIRECTORS’ REPORT
________________________________________________________________
Your Board of Directors (“Board” or “Directors”) present their report on the consolidated entity (referred
to hereafter as the Group) consisting of Boab Metals Limited (the “Company” or “Boab”) and the entities
it controlled at the end of, or during, the period ended 31 December 2024
DIRECTORS
The names of the Company’s Directors and Secretary in office during the half year and until the date of
this report are set out below.
Gary Comb
Simon Noon
Richard Monti
Andrew Parker
Jerry Monzu
Non-Executive Chairman
Managing Director and CEO
Non-Executive Director
Non-Executive Director
Company Secretary
REVIEW OF OPERATIONS
During the half year to 31 December 2024, Boab Metals Limited made significant progress towards
a Final Investment Decision at it Sorby Hills Lead-Silver-Zinc Project (‘Sorby Hills’ or the ‘Project’),
located within the Kimberley Region of Western Australia. The Project is Australia’s largest
undeveloped, near-surface lead-silver-zinc deposit with granted mining leases, EPA approvals and
located 50km from established infrastructure in Kununurra and 150km from Wyndham Port.
Key activities undertaken and milestones achieved during the period included:
•
Option Agreement executed with Joint Venture partner to acquire their interest in the Sorby
Hills and take Boab’s interest from 75% to 100%.
•
Binding US$30M Prepayment Terms Sheet and Offtake Agreement executed with global
commodities trader Trafigura.
•
Opportunity identified to acquire DeGrussa process plant from Sandfire Resources as a
means to reduce project capex and derisk project execution timelines.
•
Key amendments to the existing Sorby Hills EPA approval were agreed and consented to by
the Western Australian Government.
The progress made during the half year builds upon the release of the Sorby Hills Project Front-End
Engineering & Design FEED Study ("FEED Study") released on 6 June 2024 that outlined strong
pre-tax economics including C1 operating costs of US$0.36/lb payable Pb (incl. a net silver credit of
US$0.37/lb payable Pb), NPV8 of A$411M, IRR of 37%, A$778M free cash flow, and an average
annualised EBITDA of A$126M. Pre-production capital costs were estimated to be A$264M.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 3
DIRECTORS’ REPORT
________________________________________________________________
Option to Acquire 100% of the Sorby Hills Project
During the half-year, Boab entered into an option agreement to acquire from joint venture partner
Henan Yuguang Gold & Lead Co. Ltd’s (“Yuguang”) their 25% interest in the Sorby Hills Project
(ASX release 23 September 2024). Yuguang has been a committed joint venture partner over the
past 6 years of Boab’s involvement in the Sorby Hills Project. During this period, the joint venture
has effectively grown the Mineral Resource and completed high-quality Feasibility studies on the
Project. The option agreement is reflective of this productive and cooperative relationship and
provides a new pathway to advance Sorby Hills toward a Final Investment Decision.
Key Terms of the Option Agreement
•
12-month option for Boab to acquire Yuguang’s 25% interest in Sorby Hills, increasing
Boab’s current 75% interest in the Project to 100%.
•
During the option period, Boab will carry Yuguang’s joint venture expenses and in turn, will
have full control over joint venture budgets and work programs.
•
Should the option be exercised, Boab will pay Yuguang:
•
o
Tranche 1: A$12.5M upon exercise of the option and the concurrent acquisition of
Yuguang’s 25% Joint Venture interest;
o
Tranche 2: A$5.5M payable no later than 12 months from the commencement of
concentrate production at Sorby Hills; and
o
Tranche 3: A$5.0M payable no later than 18 months from the commencement of
concentrate production at Sorby Hills.
The ability to exercise the option is subject to Boab reaching a Final Investment Decision on
the Sorby Hills Project within the next 12 months.
Importantly, the option agreement requires no immediate payment to Yuguang and allows for
Tranche 1 payment to be met with funds raised at FID.
Based on the results of the FEED Study, a further 218kt of lead-silver concentrate, 137kt of payable
lead, 4.3Moz of payable silver and A$103M NPV8 will be attributable to Boab upon exercise of the
option and the acquisition of Yuguang’s 25% interest.
Binding Prepayment and Offtake Agreement
During the half-year, Boab (via its 100% own subsidiary Sorby Hills Pty Ltd (“SHPL”)) executed a
binding Offtake Agreement and associated US$30 million Prepayment terms sheet with global
commodities trader, Trafigura (ASX release 10 December 2024).
Key Terms of the Prepayment and Offtake Agreements
The Prepayment terms include a 5-year term, an interest rate margin of SOFR + 5% and an 18month interest-free period after which repayments will be made via equal monthly instalments.
Financial Close and drawdown of the Prepayment are subject to the execution of full-form
documentation, the finalisation of outstanding due diligence, and the Project being fully-funded.
Base Offtake terms are for 75% of the Sorby Hills Lead-Silver concentrate up to a minimum of
531,000 tonnes (~7 years based on the FEED Study production schedule) with market standard
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 4
DIRECTORS’ REPORT
________________________________________________________________
metal payabilities, metal pricing based on spot pricing and a lead treatment charge linked to the
quoted annual benchmark.
Should Boab utilise alternative financing to the Prepayment or not reach financial close on the
Prepayment, Boab shall have the discretion to reduce the offtake volumes to 50% and 25%
respectively. In each case, lead treatment charges will revert to an average of the prevailing annual
benchmark and the spot lead treatment charge.
The agreements are the result of a highly competitive process including other global traders and
smelters that demonstrated the attractiveness of the Sorby Hills concentrate product and represent
a key milestone towards a final investment decision on Sorby Hills and a cornerstone of Boab’s
financing solution for the Project.
Cost reduction initiatives
As part of Boab’s project execution derisking initiative under taken during the half-year, the Company
commenced detailed due diligence on the potential acquisition of the DeGrussa process plant from
Sandfire Resources Limited (ASX:SFR) (“Sandfire”) for use at Sorby Hills.
The DeGrussa process plant, located 900km northeast of Perth, formed part of the world-class
DeGrussa Copper mine that was built and operated by Sandfire between 2011 and May 2023. Since
the cessation of operations in early FY24, the DeGrussa process plant has been kept on active care
and maintenance by Sandfire.
Preliminary due diligence undertaken by Boab has indicated the DeGrussa process plant, which
comprises a conventional crushing, milling, flotation, dewatering and filtration circuit is ideally suited
for the requirements of Sorby Hills.
Boab is working closely with preferred EPC Contractor GR Engineering Service (“GRES”) (ASX
release 21 November 2022) to undertake a thorough review of the DeGrussa process plant and
assess the technical and economic benefit of its incorporation into the Sorby Hills Project.
EPA Amendments
During the half-year, the Western Australian Government provided consent to key amendments to
the Sorby Hills Project existing approval under the Environmental Protection Act (“EPA”)(ASX
release 23 December 2024).
The consent was the result of a detailed information exchange with the Western Australia
Environmental Protection Agency department to demonstrate that the Project in its current expanded
form is in accordance with requirements of the EPA. The amendments provide Boab with scope to
implement the Sorby Hills Project in line with the Project’s FEED study, including an increase to the
open pit depth and mining production rate. The amendments also provide the opportunity for Boab
to further reduce capital expenditure through an optimisation of the proposed water management
strategy and rationalisation of associated infrastructure.
All EPA amendments required under Part IV of the Act to commence the implementation of the Sorby
Hills Project have been received and the Company will now proceed toward finalising outstanding
regulatory approvals, including the completion and updating of documentation required under the
federal Environmental Protection and Biodiversity Conservation Act (“EPBC”) as a result of the
increase in the Project’s scope since the Project was originally assessed in 2013.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 5
DIRECTORS’ REPORT
________________________________________________________________
EPA approval to mine the Beta Pit, which is scheduled to occur at the end of the current Project
mining plan, will be sought subsequent to the commencement of operations.
Completion of the Phase VIII Drilling Program
In early August, Boab announced the commencement of a Phase VIII drilling program to follow up
on its exploration success from the 2023 campaign at the Keep Seismic Target. The Phase VIII
drilling program comprised of 4-hole deep sonic/diamond step out drill holes for a total of 1,352m and
was completed ahead of schedule and within budget.
The new drill holes were collared as 100m step-outs from Phase VII hole SHSD_185 to enable
correlation and interpretation of the original results. SHSD_185 was aimed at testing the potential for
a mineralised feeder fault system, which can be seen on the seismic data and the potential for
stratiform mineralisation at the base of the Knox Formation/Sorby Dolomite interface. In summary,
the program delivered several important results:
•
A significant mineralisation intercept demonstrating the validity of the targeting rationale;
•
Intersected further intervals of massive stratiform sphalerite mineralisation; and
•
Demonstrated the role of structure in the distribution and deformation of mineralisation.
Assay results (ASX release 22 October 2024) confirmed the continuity of mineralisation and support
future exploration of the Keep Seismic Target Boab is of the view that the Keep Zinc-Lead Prospect
area is now established as a compelling sub surface target with scope for future discovery.
CORPORATE ACITIVITIES
The Company held its Annual General Meeting on 26 November 2024 with all resolutions put to
Shareholders approved on a poll.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
No significant changes have occurred in the state of affairs of the Group during the half year.
MATTERS SUBSEQUENT TO END OF THE HALF YEAR
There have been no matters that would require disclosure subsequent to the end of the half year.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 6
DIRECTORS’ REPORT
________________________________________________________________
COMPLIANCE STATEMENTS
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the
‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in
Australasia of Exploration Results, Mineral Resources and Ore Reserves. Information included in this
activities report relating to Exploration Results has been extracted from the ASX Announcements titled
“Significant Intercepts at Sorby Hills” dated 8 November 2023, “Amended Drilling Announcement” dated
4 September 2023”, “Assays Confirm Further Positive Outcome for Sorby” dated 23 January 2023,
“High-Grade Lead-Silver Confirmed at Beta Deposit” dated 1 February 2022, and “Sorby Hills DFS
Metallurgical Testwork Results” dated 19 November 2021 available to view at
www.boabmetals.com.au. The Company confirms that it is not aware of any new information or data
that materially affects the information included in these announcements. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially
modified from the form in which they were first presented.
Information included in this report relating to Mineral Resources has been extracted from the Mineral
Resource Estimate dated 17 December 2021, available at www.boabmetals.com.au. The Company
confirms that it is not aware of any new information or data that materially affects the information
included in the Mineral Resource Estimate and that all material assumptions and technical parameters
underpinning the estimates, continue to apply and have not materially changed. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Mineral Resource Estimate.
Information included in this report relating to Ore Reserves, Production Targets and Financial Forecasts
has been extracted from the Sorby Hills Definitive Feasibility Study and dated 19 January 2023,
available at www.boabmetals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Ore Reserve Statement and
that all material assumptions and technical parameters underpinning the estimates, production targets
and financial forecasts continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially
modified from the Ore Reserves Statement.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditor’s independence declaration as required under section 307C of the Corporations
Act 2001 is set out on page 8. This report is signed in accordance with a resolution of the directors.
Gary Comb
Chairman
13 March 2025
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 7
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY GLYN O'BRIEN TO THE DIRECTORS OF BOAB METALS LIMITED
As lead auditor for the review of Boab Metals Limited for the half-year ended 31 December 2024,
I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Boab Metals Limited and the entities it controlled during the period.
Glyn O'Brien
Director
BDO Audit Pty Ltd
Perth
13 March 2025
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of A.C.N. 050 110 275 Ltd ABN 77 050 110 275,
an Australian company limited by guarantee. BDO Audit Pty Ltd and A.C.N. 050 110 275 Ltd are members of BDO International Ltd, a UK company limited by guarantee, and
form part of the international BDO network of independent member firms. Liability limited by a scheme approved under Professional Standards Legislation
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
For the half year ended 31 December 2024
________________________________________________________________
Note
Revenue
Expenditure
Exploration Expenses
Administration Expenses
Corporate Expenses
Depreciation Expenses
Occupancy Expenses
Salaries and Employee Benefit Expenses
Share Based Payments
Depreciation of Right of Use Assets
Interest paid on leased liabilities
(Loss) Before Income Tax
Income Tax
Total (Loss) for the Financial Period
Other Comprehensive Income
Movement in Foreign Exchange Translation Reserve
Total Comprehensive (Loss)
Total Comprehensive (Loss) Attributed to the
Members
Basic and Diluted Loss per Share for Loss
Attributable to the Ordinary Equity Holders of the
Company (Cents per Share)
3
8
31 Dec 2024
31 Dec 2023
$
135,866
$
134,222
(1,412,600)
(89,034)
(264,382)
(16,462)
(24,549)
(334,128)
(115,780)
(38,392)
(3,409)
(2,162,870)
(2,162,870)
(1,471,337)
(81,687)
(274,112)
(19,702)
(34,876)
(398,703)
(193,413)
(35,539)
(1,146)
(2,376,293)
(2,376,293)
20,134
(2,142,736)
(1,855)
(2,378,148)
(2,142,736)
(2,378,148)
(0.93)
(1.55)
The above Consolidated Statement of Profit or Loss and Other Comprehensive Income should be
read in conjunction with the Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 9
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
At 31 December 2024
________________________________________________________________
Note
Current Assets
Cash and Cash Equivalents
Trade and Other Receivables
Prepayments
Total Current Assets
31 Dec 2024
$
30 Jun 2024
$
3,488,520
635,286
103,912
4,227,718
5,663,582
516,023
45,118
6,224,723
4,643,995
60,000
79,969
1,638,238
70,202
6,492,404
10,720,122
4,643,995
60,000
78,710
1,641,461
108,594
6,532,760
12,757,483
Current Liabilities
Trade and Other Payables
Provisions
Lease Liability
Total Current Liabilities
210,994
127,999
75,839
414,832
177,202
138,404
77,639
393,245
Non-Current Liabilities
Lease Liability
Provisions
Deferred tax liability
Total Non-Current Liabilities
Total Liabilities
Net Assets
79,584
162,647
242,231
657,063
10,063,059
35,073
76,503
162,647
274,223
667,468
12,090,015
58,507,277
1,769,495
(50,213,713)
10,063,059
58,507,277
1,633,581
(48,050,843)
12,090,015
Non-Current Assets
Exploration and Evaluation Assets
Investments
Other Assets
Plant and Equipment
ROU Asset
Total Non-Current Assets
Total Assets
Equity
Contributed Equity
Reserves
Accumulated Losses
Total Equity
4
5
6
7
The above Consolidated Statement of Financial Position should be read in conjunction with the
Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 10
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the half year ended 31 December 2024
________________________________________________________________
2024
Balance at 1 July
2024
(Loss) for the Period
Other
Comprehensive
Gain for the Period
Total
Comprehensive
Gain/(Loss) for the
Period
Share Based
Payments
Balance at 31
December 2024
2023
Balance at 1 July
2023
(Loss) for the
Period
Other
Comprehensive
(Loss) for the
Period
Total
Comprehensive
(Loss) for the
Period
Share Based
Payments
Balance at 31
December 2023
Issued Capital
Share /
Option
Reserve
Foreign
Currency
Translation
Reserve
Accumulated
Losses
Total
$
$
$
$
$
58,507,277
1,940,011
(306,430)
(48,050,843)
12,090,015
-
-
-
(2,162,870)
(2,162,870)
-
-
20,134
-
20,134
-
-
20,134
(2,162,870)
(2,142,736)
-
115,780
-
-
115,780
58,507,277
2,055,791
(286,296)
(50,213,713)
10,063,059
53,677,822
1,763,293
(317,450)
(44,728,869)
10,394,796
-
-
-
(2,376,293)
(2,376,293)
-
-
(1,855)
-
(1,855)
-
-
(1,855)
(2,376,293)
(2,378,148)
-
193,413
-
-
193,413
53,677,822
1,956,706
(319,305)
(47,105,162)
8,210,061
The above Consolidated Statement of Changes in Equity should be read in conjunction with the
Consolidated Notes to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 11
CONSOLIDATED CASH FLOW STATEMENT
For the half year ended 31 December 2024
Note
31 Dec 2024
31 Dec 2023
$
$
Cash Flows from Operating Activities
Expenditure on Mining Interests
Payments to Suppliers and Employees
Interest Received
Other Income
Net Cash (Outflow) from Operating Activities
(1,412,600)
(855,669)
107,255
39,473
(2,121,541)
(1,299,085)
(1,010,646)
38,026
99,915
(2,171,790)
-
(129,326)
(13,239)
-
(13,239)
(129,326)
(40,282)
(40,282)
(37,376)
(37,376)
(2,175,062)
(2,338,492)
5,663,582
4,578,654
3,488,520
2,240,162
Cash Flows from Investing Activities
Expenditure on Development costs
Payments for Purchase of Property, Plant and
Equipment
Net Cash (Outflow) from Investing Activities
Cash Flows from Financing Activities
Payments on Lease Liability
Net Cash (Outflow) from Financing Activities
Net (Decrease) in Cash and Cash
Equivalents
Cash and Cash Equivalents at the Beginning of the
Financial Year
Cash and Cash Equivalents at the End of the
Financial Period
The above Consolidated Statement of Cash Flows should be read in conjunction with the Consolidated Notes
to the Financial Statements.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 12
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2024
________________________________________________________________
1. SUMMARY OF MATERIAL ACCOUNTING POLICIES
Boab Metals Limited (the “Company”) is a for-profit company limited by shares, incorporated and
domiciled in Australia, and whose shares are publicly traded.
These consolidated interim financial statements of Boab Metals Limited (BML or the Company) and
controlled entities (Group) for the half year reporting period ended 31 December 2024 have been
prepared in accordance with Australian Accounting Standard AASB 134: Interim Financial Reporting
and the Corporations Act 2001. The Group is a for profit entity for financial reporting purposes under
Australian Accounting Standards. Compliance with AASB 134 ensures compliance with International
Financial Reporting Standard IAS 34 ‘Interim Financing Reporting’.
This interim financial report does not include full disclosure of the type normally included in an annual
report. It is recommended that this financial report be read in conjunction with the annual financial report
for the year ended 30 June 2024 and any public announcements made by BML during the half year
reporting period in accordance with the continuous disclosure requirement of the Corporation Act 2001.
The accounting policies have been consistently applied with those of the previous financial year and
corresponding interim report period, except in relation to the matters disclosed below.
New or amended Accounting Standards and Interpretations adopted
The consolidated entity has adopted all of the new or amended Accounting Standards and
Interpretations issued by the Australian Accounting Standards Board ('AASB') that are mandatory
for the current reporting period.
Any new or amended Accounting Standards or Interpretations that are not yet mandatory have not
been early adopted.
Going Concern
The financial report has been prepared on a going concern basis which contemplates the continuity of
normal business activity and the realisation of assets and settlement of liabilities in the normal course
of business.
On 22 December 2023, the Company established an At-the-market subscription with Acuity Capital.
The ATM provides Boab with up to $5,000,000 of standby equity capital over the 38-month period to 31
January 2027. As security for the ATM, the Company placed 9,000,000 fully paid ordinary BML shares
from its LR7.1 capacity at nil cash consideration to Acuity Capital.
During May 2024, the ATM Facility was activated and used to raise $185,000 (inclusive of costs)
(balance remaining of standby equity is currently $4,815,000) through the set-off of 1,230,000 Company
collateral shares previously issued to Acuity Capital (collateral shares remaining currently is 7,770,000).
The directors have prepared an estimated cash flow forecast for the 12 month period from date of this
report to determine if the Group will require additional funding during the period. Based on the cash
flow forecast, the Directors are satisfied that there are reasonable grounds to believe that the Group will
be able to operate as a going concern on the basis that the Group will be able to raise further funds
through capital raisings and/or reduce operating expenditure as required.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 13
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2024
________________________________________________________________
2.
SEGMENT INFORMATION
AASB 8 requires operating segments to be identified based on internal reports provided to the Board
in order to allocate resources to the segments and assess performance. Information reported to the
Board is based on exploration in the principal locations of the Group’s projects, Australia and
Colombia. The revenues and profit generated by each of the Group’s operating segments, assets and
liabilities are summarised as follows.
The following is an analysis of the Group’s revenue and results by reportable operating segment
for the half-year under review:
Revenue
Half Year Ended
31-Dec-24
31-Dec-23
$
$
135,866
134,222
135,866
134,222
Australia
Colombia
Operating (Losses)
Half Year Ended
31-Dec-24
31-Dec-23
$
$
(2,294,116)
(2,372,582)
(518)
(3,711)
(2,294,635)
(2,376,293)
The following is an analysis of the Group’s assets and liabilities by reportable operating segment:
Assets
Liabilities
Net Assets
31-Dec-24
30-Jun-24
31-Dec-24
30-Jun-24
31-Dec-24
30-Jun-24
$
$
$
$
$
$
Australia
10,695,562
12,753,006
(648,525)
(659,071)
10,047,037
12,093,935
Colombia
24,560
4,477
(8,538)
(8,397)
16,022
(3,920)
10,720,122
12,757,483
(657,063)
(667,468)
10,063,059
12,090.015
3. REVENUE
From Continuing Operations
Sorby Hills Revenue
Interest Received
4.
31-Dec-23
$
84,192
50,031
134,223
TRADE AND OTHER RECEIVABLES
Trade Receivables(1)
Other Receivables
(1)
31-Dec-24
$
39,473
96,393
135,866
31-Dec-24
$
576,500
58,786
635,286
30-Jun-24
$
468,487
47,536
516,023
Includes receivables from Henan Yuguang Gold and Lead Co. of $274,710 and Sandfire
Resources Limited of $277,730.
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 14
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2024
________________________________________________________________
5. EXPLORATION AND EVALUATION ASSETS
31-Dec-24
$
4,643,995
4,643,995
30-Jun-24
$
4,643,995
4,643,995
31-Dec-24
$
30-Jun-24
$
1,641,461
1,676,350
Additions
13,239
2,696
Depreciation
(16,462)
(37,585)
1,638,238
1,641,461
Balance at Beginning of the Period
Additions/(Reclassification of assets)
Balance at the end of the Period
There were no impairment indicators identified at 31 December 2024.
6.
PROPERTY, PLANT & EQUIPMENT
Balance at Beginning of the Period
Balance at the end of the Period
7.
CONTRIBUTED EQUITY
MOVEMENTS IN ORDINARY SHARE CAPITAL
31 Dec 2024
30 June 2024
Shares
$
Shares
233,395,106
58,507,277
174,462,770
53,677,822
Share Placement/Purchase Plan
-
-
17,169,415
1,716.942
Entitlement Offer
Shares issued as security for At
the Market subscription
Shares issued to Acuity Capital
ATM subscription
Transaction costs
-
-
32,762,921
3,276,292
-
-
7,770,000
-
-
-
1,230,000
185,000
-
-
-
(348,779)
233,395,106
58,507,277
233,395,106
58,507,277
Beginning of the Financial Year
$
Shares Issued:
BOAB METALS LIMITED | HALF YEAR REPORT FY-2025
Page 15
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENTS
For the half year ended 31 December 2024
________________________________________________________________
8.
SHARE OPTION AND PERFORMANCE RIGHTS RESERVE
31-Dec-24
No. Options
+
Performance
Rights
31-Dec-24
30-Jun-24
30-June-24
$
No. Options +
Performance
Rights
$
7,600,000
7,600,000
1,940,011
115,780
2,055,791
Balance at Beginning of Period
Issued during the period
Exercised during the period
Forfeited/Cancelled during the period
Converted during the period
Share based payment expense
Balance at End of Period
8,300,000
(700,000)
7,600,000
1,763,293
307,934
(131,216)
1,940,011
9. COMMITMENTS AND CONTINGENCIES
On 23 September 2024 the company announced that it has executed an option agreement with joint
venture partner Henan Yuguang Gold & Lead Co. Ltd (“Yuguang”) to acquire their 25% interest in the
Sorby Hills Lead-Silver-Zinc Project (“Sorby Hills” or “the Project”), located in the Kimberley Region
of Western Australia. Main terms of the agreement are as follows;
•
•
•
•
•
12-month option for Boab to acquire Yuguang’s 25% interest in Sorby Hills, increasing Boab’s
current 75% interest in the Project to 100%.
During the option period, Boab will carry Yuguang’s joint venture expenses and in turn, will
have full control over joint venture budgets and work programs.
Should the option be exercised, Boab will pay Yuguang:
o Tranche 1: A$12.5M upon exercise of the option and the concurrent acquisition of
Yuguang’s 25% Joint Venture interest;
o Tranche 2: A$5.5M payable no later than 12 months from the commencement of
concentrate production at Sorby Hills; and
o T
Share your feedback
Discover